Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

NPDES Level 1A Practice Test 2026/2027 – 100+ Questions on BMPs, Soil Erosion, Sediment Control, Permit Rules & Georgia State Compliance

Document preview thumbnail
Preview 2 out of 7 pages

NPDES Level 1A Practice Test 2026/2027 – 100+ Questions on BMPs, Soil Erosion, Sediment Control, Permit Rules & Georgia State Compliance Spillway pipe for a temporary sediment basin cannot be constructed with a pipe smaller than _____ inches. A) 6 B) 8 C) 10 D) 12 - ANSWER -B) 8 What is the amount of over fall allowed at the end of the storm drain outlet apron? A) 1/2 the diameter of the rip rap used B) Not to exceed 6 inches C) 1/2 the thickness of the apron D) Zero - ANSWER -D) Zero What size rocks should be used to fill gabion boxes? A) 3 to 4 inches B) 4 to 8 inches C) Larger than 8 inches D) Clean aggregate - ANSWER -C) Larger than 8 inches A diversion constructed of compacted soil can be positioned ________ a slope. A) Above B) Across C) Below D) All of the above - ANSWER -B) Across A temporary sediment basin's riser pipe must be anchored with a concrete foundation. The minimum thickness allowed for this foundation is ________ inches. A) 12 B) 18 C) 24 D) 32 - ANSWER -B) 18 A temporary down drain structure using a 12 inch pipe could drain up to ________ acres. A) 0.3 B) 0.5 C) 0.4 D) 1.0 - ANSWER -D) 1.0 A retrofit utilizing a slotted board dam can be used on projects with a larger drainage area than a retrofit utilizing perforated half round pipe. A) True B) False - ANSWER -B) False A stream channel diversion can only be constructed on streams with a drainage area less than _________ acres. A) 830 B) 725 C) 640 D) 500 - ANSWER -C) 640 What may be used to construct a grade stabilization structure? A) Rock B) Cement C) Wood D) All of the above - ANSWER -D) All of the above The apron for a storm drain outlet is designed to accommodate the storm water flow but the minimum length is ______ times the outlet pipe diameter. A) 4 B) 5 C) 6 D) 8 - ANSWER -C) 6 In jurisdictions where there is a local issuing authority (LIA) one NOI is submitted to the LIA and a second NOI is submitted to whom? A) Nation Resource Conservation Service (NRCS) B) Georgia Soil & Water Conservation Commission (GSWCC) C) Department of Natural Resources (DNR) D) Environmental Protection Division (EPD) District Office - ANSWER -D) Environmental Protection Division (EPD) District Office When the entire project has undergone final stabilization the permittee must notify the EPD with which of the following? A) A notarized statement of completion B) A notarized statement of completion and a complete set of photographs of the project site C) A Notice of Termination (NOT) D) An affidavit from the LIA inspector stating that the project plan was complied with - ANSWER -C) A Notice of Termination (NOT) Under an ES & PC Plan, how often should an inspection occur in areas where petroleum products are stored, used, or handled? A) Daily B) Weekly and after rainfall greater than 0.5 inches C) Bi-monthly D) Monthly - ANSWER -A) Daily The components of an adequate erosion, sedimentation and pollution control plan around found in Part ______ of the General Permit. A) 1 B) 2 C) 3 D) 4 - ANSWER -C) 3

Content preview

NPDES Level 1A Practice Test 2026/2027
– 100+ Questions on BMPs, Soil Erosion,
Sediment Control, Permit Rules &
Georgia State Compliance
Spillway pipe for a temporary sediment basin cannot be constructed with a pipe
smaller than _____ inches.
A) 6
B) 8
C) 10
D) 12 - ANSWER -B) 8

What is the amount of over fall allowed at the end of the storm drain outlet apron?
A) 1/2 the diameter of the rip rap used
B) Not to exceed 6 inches
C) 1/2 the thickness of the apron
D) Zero - ANSWER -D) Zero

What size rocks should be used to fill gabion boxes?
A) 3 to 4 inches
B) 4 to 8 inches
C) Larger than 8 inches
D) Clean aggregate - ANSWER -C) Larger than 8 inches

A diversion constructed of compacted soil can be positioned ________ a slope.
A) Above
B) Across
C) Below
D) All of the above - ANSWER -B) Across

A temporary sediment basin's riser pipe must be anchored with a concrete
foundation. The minimum thickness allowed for this foundation is ________
inches.
A) 12
B) 18
C) 24

, D) 32 - ANSWER -B) 18

A temporary down drain structure using a 12 inch pipe could drain up to
________ acres.
A) 0.3
B) 0.5
C) 0.4
D) 1.0 - ANSWER -D) 1.0

A retrofit utilizing a slotted board dam can be used on projects with a larger
drainage area than a retrofit utilizing perforated half round pipe.
A) True
B) False - ANSWER -B) False

A stream channel diversion can only be constructed on streams with a drainage
area less than _________ acres.
A) 830
B) 725
C) 640
D) 500 - ANSWER -C) 640

What may be used to construct a grade stabilization structure?
A) Rock
B) Cement
C) Wood
D) All of the above - ANSWER -D) All of the above

The apron for a storm drain outlet is designed to accommodate the storm water
flow but the minimum length is ______ times the outlet pipe diameter.
A) 4
B) 5
C) 6
D) 8 - ANSWER -C) 6

In jurisdictions where there is a local issuing authority (LIA) one NOI is submitted
to the LIA and a second NOI is submitted to whom?
A) Nation Resource Conservation Service (NRCS)
B) Georgia Soil & Water Conservation Commission (GSWCC)
C) Department of Natural Resources (DNR)

Document information

Uploaded on
September 1, 2026
Number of pages
7
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheExamMaestro
3.6
(18)
Sold
155
Followers
5
Items
3756
Last sold
13 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions