Practice Test Questions And Correct
Answers (Verified Answers)
Tube Building Desert Termite - ANSWER -Very common in southern and
western desert areas in elevations below 6000 feet. Irregular tubes on tree trunks,
fences, plant debris is the work of them. Damage isn't as severe as a regular
Subterranean Termite because their diet consists of dry plant materials. Their
flights of Alates involving hundreds take place during or following afternoon and
evening rain showers. May be as many as 20 flights between mid June to late
September.
Subterranean Termite control techniques - ANSWER -Sanitation, Proper
Construction and Chemical Control
Subterranean Termite Control: Sanitation - ANSWER -Areas under or around a
structure where excess cellulose debris exists can encourage colonization. Any
food source must be removed around the structure or planned building location
Cellulose Debris - ANSWER -Debris that is of a size that can be raked and in
aggregate 1/2 cubic foot or more or a stump or any other wood that is imbedding in
a footing and constitutes a contact of wood with the earth. Doesn't include pressure
treated wood that is used to support a manufactured home or the skirting. 864
Cubic inches (length times width times height)(12 x 12 x 6 = 864) If the amount is
more it must be removed.
Proper construction - ANSWER -improper construction is the largest contributor
to all wood destroying pests. Types would be Earth to wood contact, faulty grade,
insufficient ventilation, excessive moisture, cellulose debris, wood and
reinforcement
Earth To Wood Contact - ANSWER -In new construction must be avoided. 90%
of termite infestations come from earth to wood contact. Its defined as any support
or other structure of cellulose that is LESS THAN 3 INCHES above the soil level
and in contact with the inspected structure, whether its internal or external relation
to the structure.
, Faulty Grade - ANSWER -Faulty grades between the soil and wooden members
also encourage subterranean termites. Its defined as a floor joist or stringer is LESS
THAN 12 INCHES ABOVE THE SOIL LEVEL, The top of the foundation is
LESS THAN 3 INCHES ABOVE the adjacent soil level, The drainage is such that
there is visible evidence of surface water on the structure. It can be avoided by
ensuring the crawlspace is at least the minimum clearance of 12 inches.
Insufficient Ventilation - ANSWER -A major contributor to subterranean termites
as well as wood destroying fungi. Lack of air movement allows moisture to build a
micro climate. Its defined as less than 1 SQUARE FOOT OF VENTILATION
PER 300 SQUARE FEET OF CRAWLSPACE, LESS THAN 1 SQUARE FOOT
FOR EVERY 1500 SQUARE FEET 1 of ground are cover by a vapor barrier and
less than four areas permitting ventilation.
Excessive Moisture - ANSWER -Actual moisture on the wood or wood products
used in the structure.
Reinforcement - ANSWER -Concrete should be considered for improving the
structural characteristics but to reduce cracking of stemwall and footings which can
be entry points for termites. Cracks only 1/32 of an inch are large enough for entry.
Termite Shield - ANSWER -May aid in the overall termite proofing of the
structure but doesn't deter against termite attack. have been proven to not be that
effective due to improper installation or distortion of their 45 degree angle
Horizontal Pretreatment - ANSWER -An application over the surface of the soil
before a slab is poured.Needs to be done before the final preparations of concrete
pouring have been made. Standard Application rate is 1 gallon of dilution per 10
square feet of surface area. Applicator should pay attention to critical areas(
recognized as any area that is prone to subterranean termite entrance below a slab)
Another form of treatment would be the treatment of soil before the footings for
raised foundations are poured, its done by applying the material between the form
boards and must form a continuous unbroken barrier.
Vertical Pretreatment - ANSWER -Applying termiticide into a trench or rodding
down into the soil. RODDING SHOULD NOT EXTEND BELOW THE TOP OF
THE FOOTING. The trench of a final grade must not be wider than 6'' and must
not extend below the top of the foundation footing also must be large enough to
absorb the application. With rodding there should be a distance that will provide an