Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 32 pages
Exam (elaborations)

ARE PDD NEW SET WITH 100% VERIFIED SOLUTIONS!!!! LATEST UPDATE ALREADY GRADED A+

Document preview thumbnail
Preview 4 out of 32 pages

ARE PDD NEW SET WITH 100% VERIFIED SOLUTIONS!!!! LATEST UPDATE ALREADY GRADED A+

Content preview

ARE PDD NEW SET WITH 100% VERIFIED SOLUTIONS!!!! LATEST
UPDATE ALREADY GRADED A+



Project Manual - (ANSWER)BOUND BOOK containing bidding req, parts of the contract/ O-C agreement,
bond forms, general/ support conditions & technical specs. usually does not include the actual drawings



Who assembles the Project Manual? - (ANSWER)Architect or CMA (Construction Manager as Advisor)



what is the arch responsible for in the project manual? - (ANSWER)title, signature sheet, toc, instruction
to bidders, bidding forms, general conditions, support conditions, O-A agree, sample forms, index of
drawings, index of specs, actual specs



Prescriptive Specifications - (ANSWER)Tell exactly what product or material the contractor must use by
brand name



performance spec - (ANSWER)list results or features that materials or systems must achieve so the GC
has more choice in what will be achieve those results



Proprietary Specification - (ANSWER)A specification which calls for desired materials, products, systems,
and equipment by their trade names and model numbers.



Open Specification - (ANSWER)typically calls out or specifies three or more trade names with a provision
or "approved equal"



closed specs - (ANSWER)specifies exact material, component, or product by manufacturer or vendor;
includes style number, trade name, etc. substitutions usually not allowed



reference specification - (ANSWER)requires that a product meets specific industry standards such as Ul
or Astm



Descriptive Specification - (ANSWER)describes all components, details etc. methods of assembly, other
details & requirements too. this type is very hard to produce and not usually used

,ARE PDD NEW SET WITH 100% VERIFIED SOLUTIONS!!!! LATEST
UPDATE ALREADY GRADED A+



cash allowance specification - (ANSWER)They are used when full information on levels of quality has not
been determined or are not available at the time bids are solicited. Cash allowances may be used for the
purchase and delivery of the product only.



what consultants are part of the basic services provided? - (ANSWER)MPET & structural



Floor Area Ratio (FAR) - (ANSWER)The ratio of the gross floor area within a structure to the area of the
lot on which the structure is situated. ( if the FAR was 2.0, then you would be allowed to built 2x the lot
size)



prescriptive codes - (ANSWER)code that requires specific techniques, materials, methods allowed.
simple to do but does not allow for innovation.



Performance Code - (ANSWER)Building Code that describes functional requirements, but leave method
to achieve decisions up to the designer.



Occupant Load Factor - (ANSWER)The amount of floor area presumed to be occupied by one person.



Accessory Use Areas - (ANSWER)to be considered an accessory, an area can't exceed 10% of the total
floor area allowed by the height/area table



Incidental Use Area - (ANSWER)Ancillary to the main occupancy and has the same classification as the
nearest main occupancy but poses a greater level of risk to that occupancy



Mixed Occupancy - (ANSWER)if occupancies in a building are too large to be considered
incidental/accessory then the building is considered to have mixed occupancy.



building codes at programming phase - (ANSWER)allowable floor areas, parking req

,ARE PDD NEW SET WITH 100% VERIFIED SOLUTIONS!!!! LATEST
UPDATE ALREADY GRADED A+



building codes at SD phase - (ANSWER)occupancy loads, allowable bldg heights, egress req, stair &
exiting, ada tlts



building codes at dd phase - (ANSWER)materials fire ratings, structural req, fire separations, federal
regulations, ada, state & local codes, special codes



building codes at cd phase - (ANSWER)substitutions & code approvals, submittals & code approvals, fire
ratings, acoustical ratings, sustainable verifications



Group A - (ANSWER)assembly



group b - (ANSWER)business



group e - (ANSWER)educational



group f - (ANSWER)Factory and Industrial



group h - (ANSWER)High Hazard



group I - (ANSWER)institutional



group m - (ANSWER)mercantile



group r - (ANSWER)residential



group s - (ANSWER)storage



group u - (ANSWER)Utility and Miscellaneous

, ARE PDD NEW SET WITH 100% VERIFIED SOLUTIONS!!!! LATEST
UPDATE ALREADY GRADED A+




how to determine occupant load: - (ANSWER)1. actual # of people in space/ bldg. ( typ. where fixed
seating used) 2. use load factor provided by the code. Divide bldg area by occupant load factor 3.
occupant load is cumulative as occupants exit through intervening spaces



what determines the fire suppression system? - (ANSWER)1. area of building 2. type of occupancy 3.
number of occupants



where are sprinklers always required? - (ANSWER)bldgs taller than 55', deep underground or windowless
structures



Flame Spread Rating/Smoke Developed Ratings - (ANSWER)measures the amount of flame and smoke a
material generates (carpet, fabrics, etc)



what is required in an area of refuge? - (ANSWER)outside air, [passive fire protection, emergency lighting
& 2 way communication



Type 1 construction - (ANSWER)Fire Resistive: concrete or protected steel. typically found in high rise
buildings



Type 2 construction - (ANSWER)non combustible- reinforced masonry with metal framing at roof. typ.
found in mid rise office bldgs



Type 3 construction - (ANSWER)combustible/ ordinary: using brick, block or light gauge steel framing
walls with wood framing at roof. typ found in schools, hotels & offices



Type 4 construction - (ANSWER)Heavy-timber construction, mostly everything in the building is made of
solid or lamented wood.

Strengths: Resist collapse, structurally stable, easy to vent

Document information

Uploaded on
September 1, 2026
Number of pages
32
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$21.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NorKnights
5.0
(501)
Sold
3024
Followers
1
Items
502
Last sold
2 days ago


Reviews from verified buyers




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions