DAU FE 2010 Exam 3 Facility Engineering Life Cycle
Support comprehensive Questions and Answers with
100% Correct Answers | Latest Version
Question 1.
Masterformat provides a standard structure for organizing construction standards. How
many primary divisions are part of the Masterformat?
Correct Answer: -NOT- 51
Question 2.
Task orders are used for which of the below kinds of work?
Correct Answer: Non-complex construction and maintenance and repair
Question 3.
The Master Planner wants to award a contract to support the installation's master planning
efforts. Based on FAR Part 36.601-4(a), would this effort be accomplished through an
architect-engineer contract?
Correct Answer: Yes
Question 4.
The Installation Commander is asking questions about military construction, operations and
maintenance, and military family housing projects planned for the installation. Which
component of the Comprehensive Plan would you go to a detail of the physical location of
projects that have been approved or programmed for funding throughout the installation?
Correct Answer: -NOT- Land Use Plan
Question 5.
As the Design Manager preparing the government estimate for a design project. When
considering profit, which if the following in NOT true?
Correct Answer: -NOT- Profit should consider the nature of the work to be performed
Question 6.
FAR Part 22.406-7 - Compliance Checking re- quires interviews of laborers to check work
classification, rates of pay, fringe benefits payment, and hours worked. How often is the
Government required to conduct these interviews?
Correct Answer: Agency's policy
,Question 7.
All project planning projects include the same five steps. Which of the following shows the
five steps in their logical progression?
Correct Answer: Develop requirements; evaluate assets; analysis, concepts, and
proposals; initiate action; feedback and quality assurance
Question 8.
Which of the following may be required if Government Furnished Equipment (GFE) is not
supplied to the contractor in accordance with the time specified in the contract?
Correct Answer: An adjustment in price or delivery schedule in the contract
Question 9.
The Base Operations Support contractor in performing preventative maintenance on the
HVAC in the headquarters building. At the same time, they are responding to a service call
to repair one of the toilets in the building. This work would be defined as:
Correct Answer: Sustainment
Question 10.
You are the installation Environmental Division Chief. There are residential structures on the
installation where lead-based paint has been used that have been identified for disposal.
Which of the following environmental requirements best describes the procedure(s) that
should be followed?
Correct Answer: -NOT- A report that states the extent of lead-based paint
contamination and plans for decontamination must be submitted
Question 11.
Which of the following is NOT a potential action for disposal of surplus property?
Correct Answer: -NOT- Public sale
Question 12.
As the Project Manager, why might you NOT prefer to use a design-bid-build methodology
for procuring the design and construction of your project?
Correct Answer: Increased potential for misinterpretations and possible litigation &
Lack of input from contractors and subcontractors in the design process
Question 13.
Which of the following is not benefit of the Work Management System?
Correct Answer: Decreased worker productivity
, Question 14.
As the Design Manager you are working with the Contracting Officer to develop the
evaluation criteria for a two-phase design-build solicitation. What would NOT be a first phase
evaluation criteria.
Correct Answer: Cost Proposal
Question 15.
The Contracting Officer needs to direct the contractor to perform changes in the work within
the general scope of the contract. What clause would the Contracting Officer use to
unilaterally direct the change?
Correct Answer: FAR Clause 52.243-4, Changes
Question 16.
The Contracting Officer has issued a Request for Proposal. What will be a requirement for
the facility engineers once proposals have been received.
Correct Answer: Perform independent technical evaluation
Question 17.
In a design-build contract, the design-build contractor is for all the following except:
Correct Answer: -NOT- Construction quality
Question 18.
The Contracting Officer would issue a Request for Proposal under FAR Part 15 procedures
to prospective offerors as part of awarding a construction contract to the lowest price re-
sponsible contractor.
Correct Answer: False
Question 19.
Privatization is the transfer of maintenance responsibilities of an infrastructure to a qualified
entity.
Correct Answer: False
Question 20.
The In-House Design Team can contain all but one of the following disciplines:
Correct Answer: Contracting Officer
Question 21.
As the Project Manager, you only want to consider price and price-related factors when
awarding the contract. Would you recommend the use of an Invitation for Bids?
Correct Answer: Yes
Support comprehensive Questions and Answers with
100% Correct Answers | Latest Version
Question 1.
Masterformat provides a standard structure for organizing construction standards. How
many primary divisions are part of the Masterformat?
Correct Answer: -NOT- 51
Question 2.
Task orders are used for which of the below kinds of work?
Correct Answer: Non-complex construction and maintenance and repair
Question 3.
The Master Planner wants to award a contract to support the installation's master planning
efforts. Based on FAR Part 36.601-4(a), would this effort be accomplished through an
architect-engineer contract?
Correct Answer: Yes
Question 4.
The Installation Commander is asking questions about military construction, operations and
maintenance, and military family housing projects planned for the installation. Which
component of the Comprehensive Plan would you go to a detail of the physical location of
projects that have been approved or programmed for funding throughout the installation?
Correct Answer: -NOT- Land Use Plan
Question 5.
As the Design Manager preparing the government estimate for a design project. When
considering profit, which if the following in NOT true?
Correct Answer: -NOT- Profit should consider the nature of the work to be performed
Question 6.
FAR Part 22.406-7 - Compliance Checking re- quires interviews of laborers to check work
classification, rates of pay, fringe benefits payment, and hours worked. How often is the
Government required to conduct these interviews?
Correct Answer: Agency's policy
,Question 7.
All project planning projects include the same five steps. Which of the following shows the
five steps in their logical progression?
Correct Answer: Develop requirements; evaluate assets; analysis, concepts, and
proposals; initiate action; feedback and quality assurance
Question 8.
Which of the following may be required if Government Furnished Equipment (GFE) is not
supplied to the contractor in accordance with the time specified in the contract?
Correct Answer: An adjustment in price or delivery schedule in the contract
Question 9.
The Base Operations Support contractor in performing preventative maintenance on the
HVAC in the headquarters building. At the same time, they are responding to a service call
to repair one of the toilets in the building. This work would be defined as:
Correct Answer: Sustainment
Question 10.
You are the installation Environmental Division Chief. There are residential structures on the
installation where lead-based paint has been used that have been identified for disposal.
Which of the following environmental requirements best describes the procedure(s) that
should be followed?
Correct Answer: -NOT- A report that states the extent of lead-based paint
contamination and plans for decontamination must be submitted
Question 11.
Which of the following is NOT a potential action for disposal of surplus property?
Correct Answer: -NOT- Public sale
Question 12.
As the Project Manager, why might you NOT prefer to use a design-bid-build methodology
for procuring the design and construction of your project?
Correct Answer: Increased potential for misinterpretations and possible litigation &
Lack of input from contractors and subcontractors in the design process
Question 13.
Which of the following is not benefit of the Work Management System?
Correct Answer: Decreased worker productivity
, Question 14.
As the Design Manager you are working with the Contracting Officer to develop the
evaluation criteria for a two-phase design-build solicitation. What would NOT be a first phase
evaluation criteria.
Correct Answer: Cost Proposal
Question 15.
The Contracting Officer needs to direct the contractor to perform changes in the work within
the general scope of the contract. What clause would the Contracting Officer use to
unilaterally direct the change?
Correct Answer: FAR Clause 52.243-4, Changes
Question 16.
The Contracting Officer has issued a Request for Proposal. What will be a requirement for
the facility engineers once proposals have been received.
Correct Answer: Perform independent technical evaluation
Question 17.
In a design-build contract, the design-build contractor is for all the following except:
Correct Answer: -NOT- Construction quality
Question 18.
The Contracting Officer would issue a Request for Proposal under FAR Part 15 procedures
to prospective offerors as part of awarding a construction contract to the lowest price re-
sponsible contractor.
Correct Answer: False
Question 19.
Privatization is the transfer of maintenance responsibilities of an infrastructure to a qualified
entity.
Correct Answer: False
Question 20.
The In-House Design Team can contain all but one of the following disciplines:
Correct Answer: Contracting Officer
Question 21.
As the Project Manager, you only want to consider price and price-related factors when
awarding the contract. Would you recommend the use of an Invitation for Bids?
Correct Answer: Yes