EAP F-89 EMERGENCY ACTION PLAN FIRE SAFETY DIRECTOR
(FSD) EXAM WITH COMPLETE SOLUTIONS 100% VERIFIED 2026
UPDATE!!
After being informed by an ex-employee that there is a bomb in a suitcase on the north side of the
building, the emergency action plan director activated the shelter in place response. Was this the correct
response to activate? Why? If this was not the correct response, then which response would have been
appropriate? Explain your answers? - (ANSWER)Because the bomb was placed close to the building's
curtain wall and the potential for harm to the occupants and to the structure was substantial, the proper
response should have been to evacuate the building using the emergency stairwells on the opposite side
of the building to protect the occupants.
The EAP brigade consists of the Chief engineer and the director of security. The emergency action plan
director disputes that claim with the FDNY. The FDNY informs the emergency action plan director that
the EAP Brigade in fact consists of the chief engineer and the director of security. The emergency action
plan director disagrees. Who is correct? Explain your answer. - (ANSWER)The EAPD is correct. The EAP
brigade consists of three people: the chief engineer, the director of security, and the property manager.
Mutual Aid Agreement. Explain this concept. - (ANSWER)A mutual aid agreement is an agreement
between two towns, communities, or cities to assist each other in the event of catastrophic events
affecting citizens or infrastructure.
During an in-building relocation of building occupant during and EAP emergency, the emergency action
plan director relocated occupant to a floor above the floor where the hazard was found. Was this action
appropriate for the emergency action plan director to take? Explain your answer. - (ANSWER)Yes when
in-building relocating your building occupants, the occupants may be directed to relocate to an upper
floor of the building, including (and depending on the hazard) the floor immediate above the hazard
floor.
F.I.S.T. is the acronym for force, information, space and time. In which types of situation should F.I.S.T. be
activated to prevent harm to people? Explain your answer. - (ANSWER)F.I.S.T. should be implemented
whenever there is a large crowd gathered for an event. The event may be in an auditorium, gym in a
building; or in a sports arena such as Madison square garden. Force is the pressure created by
overcrowding, pushing and the domino effect of people leaning against one another; information is the
information about a venue and the people occupying it before a group assembly occurs; Space refers to
the physical structure and components of a venue; and time refers to the control of foot traffic demand
rates so that traffic flows and doesn't exceed capacity of any element of the venue
,EAP F-89 EMERGENCY ACTION PLAN FIRE SAFETY DIRECTOR
(FSD) EXAM WITH COMPLETE SOLUTIONS 100% VERIFIED 2026
UPDATE!!
The outside air intake fans are manually shut down; the elevators are manually recalled in phase 1 and
the fail-safe doors are manually released. What is happening? Explain your answer. - (ANSWER)The EAP
is being activated as these three actions are fundamental to all EAP activations: outside air intake fans
are manually shutdown; elevators are manually recalled in phase 1, and that failsafe doors are manually
released.
A candidate is interested in becoming an emergency action plan director, but is rejected by the FDNY.
What certificate of fitness did the candidate fail to acquire prior to attempting to qualify for the F-59?
Explain your answer? - (ANSWER)The candidate didn't hold an f-58. All candidates for the F-59 are
required to be FSD's
One side contains building data and the other side contains colored diagrams. It is laminated and
measures 8 ½ by 11 inches. What is the name of this document? Explain your answer? - (ANSWER)This is
not a BIC, because the BIC must measure 11 by 17 inches.
Two of the emergency action plan responses to emergencies are "partial evacuation" and "evacuation."
A third concept is defend in place. True or false? What is Defend in place? Explain your answer. -
(ANSWER)This, is false defend in place is not a concept, they would be referring to shelter in place.
Defend in place is when the FDNY fights a fire while the building is occupied by tenants
The EAP has the following occupants listed as individuals who require assistance in emergency
evacuations: Maria, 10th floor; Peter, 28th floor; Sandra, 2nd floor and John, 50th floor. Who will be
reached first via an elevator? Why? Explain your answer. - (ANSWER)The person on the highest floor
would be evacuated first than working down. So the person on the 28th floor would be reached first
During an EAP on-site test, the candidate activates fireman's service elevator recall phase 1. The
candidate proceeds to activate phase 2 operations and correctly informs the examiner of the particulars
of phase 2 operations. The candidate fails the on-site test. Why? Explain your answer. - (ANSWER)Phase
2 is not allowed, the elevator would be placed in independent service. The elevator can't be recalled by
the FDNY on phase 2.
The shelter in place provision of the EAP is activated because of an external airborne hazard that is not
expected to harm the building occupants. The emergency action plan director correctly shuts down the
, EAP F-89 EMERGENCY ACTION PLAN FIRE SAFETY DIRECTOR
(FSD) EXAM WITH COMPLETE SOLUTIONS 100% VERIFIED 2026
UPDATE!!
outside air intake fans, released the fail-safe doors and activates phase 1 of elevator recall even though
the hazard is external. Are these the correct actions on the part of the emergency action plan director?
Why? Explain your answer. - (ANSWER)Yes, these are the correct actions. You want to prevent the spread
of the hazard, and restrict movement in the building
A candidate who holds an f-25 and who brings a letter indicating their intent to be listed in the building's
EAP, visits the FDNY at 9 Metro Tech Center to take the EAP computer-based test. The candidate is
rejected and informed to return at a later date to take the computer-based test. Why? Explain your
answer. - (ANSWER)The candidate failed to take the EAP course and provide a copy of the graduation
diploma to the FDNY representative
A commercial high-rise building is 700 feet in height. The emergency action plan director has to select a
building as the primary assembly area in the event of a partial evacuation or evacuation; and has two
options to choose from: Building "A" is at a distance of 600 feet and building "B" is at a distance of 800
feet. Which building must the emergency action plan director select? Why? Explain your answer. -
(ANSWER)The director must evacuate the people away from the building at least the height of the
building or greater so the correct answer would be building B
The emergency action plan director informs Kenneth, a security officer, to account for the number of
people employed by Xyz Company and who evacuated the building to the assembly area. Kenneth
refuses to account for the number of employees from Xyz Company. Why did Kenneth refuse to
cooperate with the emergency action plan director, who also happened to be the security supervisor?
Explain your answer. - (ANSWER)A representative from each tenant company is responsible for
accounting for their employees not the EAPD or the EAP staff. However the EAPD approves the methods
for accounting for employees submitted by the tenant companies. The fire/ EAP warden is usually
assigned this task. Kenneth however didn't listen to his boss and could be subject to disciplinary actions.
Allen, an employee of ABC Company in a commercial high-rise feels that he has the right to refuse to
remain inside the building after the shelter in place provision of the EAP is activated. The emergency
action plan director informs Allen that he is not allowed to leave the property and failure to follow
directives will result in his arrest. Who is correct? Explain your answer - (ANSWER)Allen is correct he will
not be arrested. The EAPD doesn't have the authority to force occupants to remain in the property, even
when the shelter in place provision is activated. These people are exercising their right to risk their lives.
All EAP's have a designated route for the purpose of occupants who wish to leave the property when
shelter in place or in-building relocation is activated.
(FSD) EXAM WITH COMPLETE SOLUTIONS 100% VERIFIED 2026
UPDATE!!
After being informed by an ex-employee that there is a bomb in a suitcase on the north side of the
building, the emergency action plan director activated the shelter in place response. Was this the correct
response to activate? Why? If this was not the correct response, then which response would have been
appropriate? Explain your answers? - (ANSWER)Because the bomb was placed close to the building's
curtain wall and the potential for harm to the occupants and to the structure was substantial, the proper
response should have been to evacuate the building using the emergency stairwells on the opposite side
of the building to protect the occupants.
The EAP brigade consists of the Chief engineer and the director of security. The emergency action plan
director disputes that claim with the FDNY. The FDNY informs the emergency action plan director that
the EAP Brigade in fact consists of the chief engineer and the director of security. The emergency action
plan director disagrees. Who is correct? Explain your answer. - (ANSWER)The EAPD is correct. The EAP
brigade consists of three people: the chief engineer, the director of security, and the property manager.
Mutual Aid Agreement. Explain this concept. - (ANSWER)A mutual aid agreement is an agreement
between two towns, communities, or cities to assist each other in the event of catastrophic events
affecting citizens or infrastructure.
During an in-building relocation of building occupant during and EAP emergency, the emergency action
plan director relocated occupant to a floor above the floor where the hazard was found. Was this action
appropriate for the emergency action plan director to take? Explain your answer. - (ANSWER)Yes when
in-building relocating your building occupants, the occupants may be directed to relocate to an upper
floor of the building, including (and depending on the hazard) the floor immediate above the hazard
floor.
F.I.S.T. is the acronym for force, information, space and time. In which types of situation should F.I.S.T. be
activated to prevent harm to people? Explain your answer. - (ANSWER)F.I.S.T. should be implemented
whenever there is a large crowd gathered for an event. The event may be in an auditorium, gym in a
building; or in a sports arena such as Madison square garden. Force is the pressure created by
overcrowding, pushing and the domino effect of people leaning against one another; information is the
information about a venue and the people occupying it before a group assembly occurs; Space refers to
the physical structure and components of a venue; and time refers to the control of foot traffic demand
rates so that traffic flows and doesn't exceed capacity of any element of the venue
,EAP F-89 EMERGENCY ACTION PLAN FIRE SAFETY DIRECTOR
(FSD) EXAM WITH COMPLETE SOLUTIONS 100% VERIFIED 2026
UPDATE!!
The outside air intake fans are manually shut down; the elevators are manually recalled in phase 1 and
the fail-safe doors are manually released. What is happening? Explain your answer. - (ANSWER)The EAP
is being activated as these three actions are fundamental to all EAP activations: outside air intake fans
are manually shutdown; elevators are manually recalled in phase 1, and that failsafe doors are manually
released.
A candidate is interested in becoming an emergency action plan director, but is rejected by the FDNY.
What certificate of fitness did the candidate fail to acquire prior to attempting to qualify for the F-59?
Explain your answer? - (ANSWER)The candidate didn't hold an f-58. All candidates for the F-59 are
required to be FSD's
One side contains building data and the other side contains colored diagrams. It is laminated and
measures 8 ½ by 11 inches. What is the name of this document? Explain your answer? - (ANSWER)This is
not a BIC, because the BIC must measure 11 by 17 inches.
Two of the emergency action plan responses to emergencies are "partial evacuation" and "evacuation."
A third concept is defend in place. True or false? What is Defend in place? Explain your answer. -
(ANSWER)This, is false defend in place is not a concept, they would be referring to shelter in place.
Defend in place is when the FDNY fights a fire while the building is occupied by tenants
The EAP has the following occupants listed as individuals who require assistance in emergency
evacuations: Maria, 10th floor; Peter, 28th floor; Sandra, 2nd floor and John, 50th floor. Who will be
reached first via an elevator? Why? Explain your answer. - (ANSWER)The person on the highest floor
would be evacuated first than working down. So the person on the 28th floor would be reached first
During an EAP on-site test, the candidate activates fireman's service elevator recall phase 1. The
candidate proceeds to activate phase 2 operations and correctly informs the examiner of the particulars
of phase 2 operations. The candidate fails the on-site test. Why? Explain your answer. - (ANSWER)Phase
2 is not allowed, the elevator would be placed in independent service. The elevator can't be recalled by
the FDNY on phase 2.
The shelter in place provision of the EAP is activated because of an external airborne hazard that is not
expected to harm the building occupants. The emergency action plan director correctly shuts down the
, EAP F-89 EMERGENCY ACTION PLAN FIRE SAFETY DIRECTOR
(FSD) EXAM WITH COMPLETE SOLUTIONS 100% VERIFIED 2026
UPDATE!!
outside air intake fans, released the fail-safe doors and activates phase 1 of elevator recall even though
the hazard is external. Are these the correct actions on the part of the emergency action plan director?
Why? Explain your answer. - (ANSWER)Yes, these are the correct actions. You want to prevent the spread
of the hazard, and restrict movement in the building
A candidate who holds an f-25 and who brings a letter indicating their intent to be listed in the building's
EAP, visits the FDNY at 9 Metro Tech Center to take the EAP computer-based test. The candidate is
rejected and informed to return at a later date to take the computer-based test. Why? Explain your
answer. - (ANSWER)The candidate failed to take the EAP course and provide a copy of the graduation
diploma to the FDNY representative
A commercial high-rise building is 700 feet in height. The emergency action plan director has to select a
building as the primary assembly area in the event of a partial evacuation or evacuation; and has two
options to choose from: Building "A" is at a distance of 600 feet and building "B" is at a distance of 800
feet. Which building must the emergency action plan director select? Why? Explain your answer. -
(ANSWER)The director must evacuate the people away from the building at least the height of the
building or greater so the correct answer would be building B
The emergency action plan director informs Kenneth, a security officer, to account for the number of
people employed by Xyz Company and who evacuated the building to the assembly area. Kenneth
refuses to account for the number of employees from Xyz Company. Why did Kenneth refuse to
cooperate with the emergency action plan director, who also happened to be the security supervisor?
Explain your answer. - (ANSWER)A representative from each tenant company is responsible for
accounting for their employees not the EAPD or the EAP staff. However the EAPD approves the methods
for accounting for employees submitted by the tenant companies. The fire/ EAP warden is usually
assigned this task. Kenneth however didn't listen to his boss and could be subject to disciplinary actions.
Allen, an employee of ABC Company in a commercial high-rise feels that he has the right to refuse to
remain inside the building after the shelter in place provision of the EAP is activated. The emergency
action plan director informs Allen that he is not allowed to leave the property and failure to follow
directives will result in his arrest. Who is correct? Explain your answer - (ANSWER)Allen is correct he will
not be arrested. The EAPD doesn't have the authority to force occupants to remain in the property, even
when the shelter in place provision is activated. These people are exercising their right to risk their lives.
All EAP's have a designated route for the purpose of occupants who wish to leave the property when
shelter in place or in-building relocation is activated.