Question
A project manager is assigned to a troubled project. The project charter has been signed,
but stakeholders disagree on scope boundaries. What should the project manager do
FIRST to resolve this disagreement?
A) Escalate to the project sponsor to enforce the signed charter
B) Facilitate a meeting with stakeholders to review and clarify the scope statement and
acceptance criteria
C) Update the project management plan to reflect the sponsor’s priorities
D) Ask each stakeholder to submit a written list of their scope expectations
Correct Answer
B) Facilitate a meeting with stakeholders to review and clarify the scope statement and
acceptance criteria
Expert Rationale
The PMBOK® Guide emphasizes that the project charter provides high-level scope, but
detailed scope boundaries are defined in the Scope Management Plan and Scope
Statement. Disagreement signals ambiguity in these artifacts. The FIRST action is
collaborative clarification—not escalation, unilateral updates, or passive data gathering.
Facilitation aligns with the “manage stakeholder engagement” and “collect requirements”
processes, building shared understanding before any documentation changes. Escalation
(A) bypasses the PM’s responsibility to facilitate; updating the plan (C) without consensus
violates change control; written lists (D) are a tool, not the primary resolution mechanism.
Question
During project execution, a key stakeholder requests a change that will add new
functionality. The change is not urgent, but it would increase customer satisfaction. What is
the project manager’s BEST course of action?
A) Implement the change immediately to improve customer satisfaction
B) Reject the change because it is not part of the original scope
,C) Document the request and submit it to the change control board (CCB) for review
D) Ask the stakeholder to wait until the next phase of the project
Correct Answer
C) Document the request and submit it to the change control board (CCB) for review
Expert Rationale
All change requests, regardless of perceived value, must follow the Perform Integrated
Change Control process. Documenting and submitting to the CCB ensures formal
evaluation of impacts on scope, schedule, cost, risk, and quality. Implementing
immediately (A) violates change control and risks scope creep. Rejecting outright (B)
ignores stakeholder needs and fails to assess value. Delaying (D) is a unilateral decision
that may harm relationships and miss opportunities; the proper channel is the CCB.
Question
A project is behind schedule. The project manager calculates that crashing critical path
activities will reduce duration by 10 days but will increase costs by $50,000. The sponsor
approves the additional budget. What should the project manager do NEXT?
A) Update the schedule baseline immediately
B) Issue a change request for the cost and schedule changes
C) Begin crashing activities as approved
D) Rebaseline the project management plan
Correct Answer
B) Issue a change request for the cost and schedule changes
Expert Rationale
Even with sponsor approval, a formal change request must be documented and processed
through integrated change control. Updating the baseline (A) or rebaselining (D) without a
change request violates configuration management. Starting work (C) before formal
approval risks unauthorized rework. The sponsor’s verbal or written approval is input, but
the CCB or change control process must authorize the change to maintain audit trails and
impact logs.
Question
The project team is distributed across three time zones. Several team members report
miscommunication and missed deadlines. What is the project manager’s PRIMARY
responsibility?
,A) Implement a new collaboration tool
B) Develop a communication management plan that defines channels, frequency, and
protocols
C) Schedule daily stand-up meetings at a time convenient for all
D) Assign a local lead in each time zone to coordinate efforts
Correct Answer
B) Develop a communication management plan that defines channels, frequency, and
protocols
Expert Rationale
The PMBOK® Guide identifies the Communications Management Plan as the foundational
document for addressing communication needs. Tool selection (A) and meetings (C) are
tactics that depend on the plan’s guidance. Local leads (D) may help but do not resolve
systemic issues like unclear roles or response expectations. The PRIMARY duty is to plan
communications systematically, ensuring the right information reaches the right people at
the right time, given the distributed context.
Question
A project manager discovers that a critical vendor will miss a delivery date, impacting the
project’s critical path. What should the project manager do FIRST?
A) Notify the sponsor and key stakeholders
B) Evaluate alternatives such as expediting, splitting the order, or finding an alternate
vendor
C) Update the risk register and issue a change request
D) Apply contingency reserves to mitigate the delay
Correct Answer
B) Evaluate alternatives such as expediting, splitting the order, or finding an alternate
vendor
Expert Rationale
The first step in addressing a realized risk or issue is to assess response options. Notifying
stakeholders (A) is important but should follow identification of viable responses. Updating
the risk register (C) is parallel, not first. Applying reserves (D) is a decision that requires
analysis of options. Evaluation ensures that the PM makes an informed recommendation,
balancing cost, schedule, quality, and stakeholder impact, in line with the Manage Risks
and Monitor and Control Risks processes.
, Question
During project planning, the team cannot estimate the duration of a specific task because
it depends on a regulatory approval that has a variable timeline. What technique should the
project manager use?
A) Analogous estimating
B) Three-point estimating
C) Delphi technique
D) Reserve analysis with a contingency buffer
Correct Answer
B) Three-point estimating
Expert Rationale
Three-point estimating (optimistic, most likely, pessimistic) explicitly accounts for
uncertainty and variability, making it ideal for tasks with unpredictable durations.
Analogous (A) relies on historical similarity, which may not capture regulatory variability.
Delphi (C) is for expert consensus, not duration variability. Reserve analysis (D) is a
response to uncertainty after estimating, not a primary estimating technique. Three-point
provides a probabilistic range that can be used for schedule risk assessment.
Question
A stakeholder with high power and low interest is resisting a key deliverable. According to
the power/interest grid, how should the project manager engage this stakeholder?
A) Keep satisfied
B) Manage closely
C) Monitor
D) Keep informed
Correct Answer
A) Keep satisfied
Expert Rationale
The power/interest grid categorizes stakeholders: high power/low interest should be “kept
satisfied” to prevent them from becoming obstructors. Their resistance signals a need for
targeted communication—not overloading with details (manage closely, B, is for high
power/high interest), not ignoring (monitor, C, is low power/low interest), and not regular