◉When outside the pH and Turbidity parameters the discharger
shall. Answer: Conduct a construction sure and run-on evaluation to
determine whether pollutant source(s) associated with the site's
construction activity may have caused or contributed to the NAL
exceedance and implement corrective actions
◉CASQA Stands for. Answer: California Stormwater Quality
Association
◉Rainfall ( R Factor) erosivity describes. Answer: A value
representing erosion from storm energy in a geographical area
◉The discharger shall ensure that a paper copy of each Rain Event
Action Plan (REAP) is. Answer: Maintained onsite
◉T/F The CGP prohibits the Regional Water Board from asking sites
to monitor other parameters. Answer: False
, ◉Site Administrative Penalties for sediment-laden water can result
in fines of. Answer: $10 Per Gallon
◉Sheet, rill, and slide are terms used to describe forms of. Answer:
Erosion
◉In the Revised Universal Soil Loss Equation (RUSLE), "A" relates to.
Answer: Tons per acre per year
◉Soil roughness applied to a DSA (disturbed soil area) tends to.
Answer: Reduce erosion
◉In the California Construction General Permit, Minimum BMPs
refer to. Answer: Required minimum BMPs by level/type
◉K factor. Answer: Soil erodibility factor used in RUSLE. It
represents the combination of detachability of the soil, runoff
potential of the soil, and the transportability of the sediment eroded
from the soil.
◉REAP Refers to. Answer: A plan related to precipitation
◉REAPS apply to. Answer: Level 2 and 3 projects
QUESTIONS WITH SOLUTIONS
◉When outside the pH and Turbidity parameters the discharger
shall. Answer: Conduct a construction sure and run-on evaluation to
determine whether pollutant source(s) associated with the site's
construction activity may have caused or contributed to the NAL
exceedance and implement corrective actions
◉CASQA Stands for. Answer: California Stormwater Quality
Association
◉Rainfall ( R Factor) erosivity describes. Answer: A value
representing erosion from storm energy in a geographical area
◉The discharger shall ensure that a paper copy of each Rain Event
Action Plan (REAP) is. Answer: Maintained onsite
◉T/F The CGP prohibits the Regional Water Board from asking sites
to monitor other parameters. Answer: False
, ◉Site Administrative Penalties for sediment-laden water can result
in fines of. Answer: $10 Per Gallon
◉Sheet, rill, and slide are terms used to describe forms of. Answer:
Erosion
◉In the Revised Universal Soil Loss Equation (RUSLE), "A" relates to.
Answer: Tons per acre per year
◉Soil roughness applied to a DSA (disturbed soil area) tends to.
Answer: Reduce erosion
◉In the California Construction General Permit, Minimum BMPs
refer to. Answer: Required minimum BMPs by level/type
◉K factor. Answer: Soil erodibility factor used in RUSLE. It
represents the combination of detachability of the soil, runoff
potential of the soil, and the transportability of the sediment eroded
from the soil.
◉REAP Refers to. Answer: A plan related to precipitation
◉REAPS apply to. Answer: Level 2 and 3 projects