• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 21 pages
Exam (elaborations)

Qsp/Qsd Certification Script 2026 Questions With Solutions Graded A+

Document preview thumbnail
Preview 3 out of 21 pages

QSP/QSD CERTIFICATION SCRIPT 2026 QUESTIONS WITH SOLUTIONS GRADED A+

Content preview

QSP/QSD CERTIFICATION SCRIPT
2026 QUESTIONS WITH SOLUTIONS
GRADED A+

◍ Should the construction start date or end date change, what is required to be
submitted to SMARTS?.
Answer: a. A revised Notice of Intent through a Change of Information.b. A
revised risk determination.c. An amended SWPPP.d. All of the above.
(Correct Answer)
◍ A likely precipitation event is any weather pattern that is forecasted to have
a ____% or greater probability of producing precipitation in the project
area.a. 10 b. 25 c. 50 d. 75 e. 99.
Answer: C
◍ A QSP is responsible for:a. Day to day implementation, inspections, and
observations b. Amending the SWPPP as required c. Developing and
certifying the SWPPP d. Certifying reports in SMARTS.
Answer: a. Day to day implementation, inspections, and observations
◍ Who must sign the No Discharge Technical Report?.
Answer: a. A California licensed professional engineer with hydrological
expertise.c. A California licensed professional geologist with hydrological
expertise.d. a or c (Correct Answer)
◍ Which of the following must be included in the Notice of Termination photo
documentation?.
Answer: a. A description of the corresponding location and orientation of
the photos as indicated in the site map.b. Photos of the site's final site
conditions and post-construction BMPs.c. a and b. (Correct Answer)
◍ A storm that produces ½ inch or more of precipitation, with a 48 hour or

, greater period between rain events is a/an...a. Qualifying rain event b.
Extended storm event c. Inactive storm event d. Unsafe monitoring event.
Answer: a. Qualifying rain event
◍ A Notice of Termination is automatically approved if no action is taken by
the RWQCB after what amount of time?.
Answer: 30 days
◍ A temporary or permanent structural BMP that directs concentrated flows
away from disturbed areas and prevents erosion is...a. erosion control b. run
on/ run off control c. sediment control.
Answer: b. run on/ run off control
◍ Under what conditions are projects exempt from the post-construction
requirements in Order, Section I
V. N.3?.
Answer: a. They are subject to the post-construction standards of an active
phase I MS4 permit.b. They are subject to the post-construction standards of
an active phase II MS4 permit.c. They are linear underground and overhead
projects.d. Any of the above. (Correct Answer)
◍ Acceptable methods to demonstrate final stabilization include:a.
50%vegetative coverage b. 100% vegetative coverage c. RUSLE 2 method.
Answer: c. RUSLE 2 method
◍ Which of the following post-construction stormwater control measures
require Regional Water Board staff review and approval?.
Answer: a. Non-structural measures.b. Structural measures.c. a and b.d.
Neither a nor b. (Correct Answer)
◍ Activities under the CGP include:a. Routine maintenance to maintain
original line and grade, hydraulic capacity, or original purpose of the
facility. b. Disturbances to land surfaces solely related to agricultural
operations. c. Clearing and grading 2 acres of land d. Discharges of storm
water from areas on tribal lands..
Answer: c. Clearing and grading 2 acres of land

, ◍ Which of the following projects might apply for Programmatic Permitting
Regulatory Coverage?.
Answer: Relocating fiberoptic cable underground while repairing
noncontiguous sections of road within the city limits.
◍ All NAL data must be uploaded within ___ after NAL exceedance has been
identified a. 24 hours b. 1 week c. 10 days d. 2 weeks.
Answer: c. 10 days
◍ Certain non-storm water discharges may be necessary for the completion of
construction projects. Therefore the General Permit authorizes such
discharges provided they meet the following conditions except:a. Meet the
NALs for pH and turbidity b. Not cause or contribute to a violation of water
quality standards c. Comply with BMPs as described in the SWPPP d. Be
infeasible to eliminate e. Causes or threatens to cause pollution,
contamination, or nuisance.
Answer: e. Causes or threatens to cause pollution, contamination, or
nuisance
◍ What does a LUP discharger with programmatic permitting coverage submit
prior to construction activity?.
Answer: a. A SWPPP covering activities common to all the projects.b. A
linear construction activity notification describing site-specific project
name, location, contact, and site acreage.c. A site-specific map detailing
pollutant sources, BMPs implemented, start and end dates, and risk type.d.
All of the above. (Correct Answer)
◍ Hydrologic source controls are a design technique that minimize and/or
slow the rate of stormwater runoff from the site. Examples include:a.
Reduction of pervious surfaces b. Use of landscaping as a storm drain
treatment feature c. Drain rooftop downspouts to impervious areas d.
Stormwater treatment facility.
Answer: b. Use of landscaping as a storm drain treatment feature
◍ Which of the following is required for dischargers removing residential lots,

Document information

Uploaded on
August 30, 2026
Number of pages
21
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.1
(14)
Sold
206
Followers
1
Items
67931
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions