Lock & Security Equipment – California C-28 Lock & Security Equipment Contractor Practice Exam | Questions, Verified Answers & Detailed Rationales | 2026 CSLB Contractor License Exam Prep | Locks, Door Hardware, Electronic Security & Access Control

Document preview thumbnail
Preview 4 out of 35 pages

Prepare for the California C-28 Lock & Security Equipment Contractor examination with this comprehensive 2026 practice exam and study guide. Designed for candidates preparing for locks, security equipment, door hardware, mechanical and electronic locking systems, key systems, access control components, installation, servicing, and related contractor licensing requirements, this resource provides exam-style questions, verified answers, and detailed rationales to support focused and effective exam preparation.

Content preview

California C-28 Lock &
Security Equipment
Contractor Practice Exam |
Questions, Verified Answers &
Detailed Rationales |
Complete CSLB Contractor
License Exam Prep Study
Guide | Updated 2026
1. Which activity is within the scope of a California C-28 Lock
and Security Equipment Contractor?
A. Installing residential plumbing systems
B. Installing fire alarm initiating devices
C. Installing and maintaining electronic access control
systems
D. Installing central air-conditioning systems
Answer: Installing and maintaining electronic access
control systems
Rationale: The C-28 classification includes locks, doors,
gates, master key systems, electronic access control,
detectors, and related security equipment. Fire alarm
systems are specifically excluded from the C-28
classification.
2. Which of the following is specifically excluded from the C-
28 classification?
A. Master key systems
B. Electronic access control
C. Security doors
D. Fire alarm systems

,Answer: Fire alarm systems
Rationale: Fire alarm systems are specifically excluded
from the C-28 classification, even though some related
low-voltage security equipment falls within C-28.
3. Before preparing an estimate for a security door
installation, the contractor should first:
A. Order the hardware
B. Hire additional employees
C. Survey the job site and verify existing conditions
D. Purchase a new key machine
Answer: Survey the job site and verify existing
conditions
Rationale: A job-site survey helps identify door
dimensions, frame conditions, electrical requirements,
security requirements, access limitations, and other
conditions that affect the scope and price.
4. A drawing scale is 1/4 inch = 1 foot. A wall measures 3
inches on the drawing. What is the actual length?
A. 6 feet
B. 9 feet
C. 12 feet
D. 16 feet
Answer: 12 feet
Rationale: At 1/4 inch per foot, 3 inches represents 3 ÷
0.25 = 12 feet.
5. A contractor estimates material at $2,400 and labor at
$1,600. What is the direct cost before overhead and
profit?
A. $3,000
B. $4,000
C. $4,400
D. $5,000

,Answer: $4,000
Rationale: Direct cost equals material plus labor: $2,400
+ $1,600 = $4,000.
6. Which factor is most important when selecting an electric
locking device?
A. Paint color
B. Key bow design
C. Door type, security requirements, and electrical
characteristics
D. Office furniture layout
Answer: Door type, security requirements, and electrical
characteristics
Rationale: Electric locking equipment must be
compatible with the door, frame, traffic conditions,
voltage, current, fire/life-safety requirements, and
required security function.
7. What is the primary purpose of a job-site survey?
A. To determine employee vacation schedules
B. To select company uniforms
C. To identify conditions affecting installation, materials,
labor, and system design
D. To calculate payroll taxes
Answer: To identify conditions affecting installation,
materials, labor, and system design
Rationale: Accurate field information is essential for
designing and estimating a C-28 installation correctly.
8. A contractor adds a 20% markup to a $5,000 cost. What is
the selling price?
A. $5,200
B. $5,500
C. $6,000
D. $6,500

, Answer: $6,000
Rationale: A 20% markup on $5,000 is $1,000.
Therefore, the selling price is $5,000 + $1,000 = $6,000.
9. Which document normally provides detailed requirements
for products, installation, and performance?
A. Employee handbook
B. Purchase receipt
C. Project specifications
D. Payroll register
Answer: Project specifications
Rationale: Specifications describe required materials,
equipment, performance standards, installation
requirements, and other project requirements.
10. If an existing door is warped and does not close
properly, the contractor should:
A. Install the lock without further investigation
B. Ignore the condition
C. Document the condition and determine whether
corrective work is required
D. Remove the door without authorization
Answer: Document the condition and determine whether
corrective work is required
Rationale: Existing conditions can prevent locking
hardware from operating correctly and can affect both
the estimate and system performance.
11. Which measurement is especially important when
ordering a replacement door lock?
A. Ceiling height only
B. Floor color
C. Door thickness and backset
D. Wall paint thickness
Answer: Door thickness and backset

Document information

Uploaded on
August 29, 2026
Number of pages
35
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$24.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
3
Followers
0
Items
671
Last sold
2 weeks ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions