Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 36 pages
Exam (elaborations)

FE Civil Practice Exam 2027 Edition | Full-Length 2026–2027 Questions with Correct Answers & Detailed Rationales

Document preview thumbnail
Preview 4 out of 36 pages

Prepare confidently for the FE Civil Exam 2026–2027 with this comprehensive 2027 Edition Full-Length Practice Exam. Designed for serious FE Civil candidates, this resource provides realistic, challenging questions covering major civil engineering subject areas and the quantitative problem-solving skills required for successful exam preparation. Every question includes the correct answer and detailed rationale, helping you understand the solution approach, reinforce essential concepts, identify weak areas, and improve exam readiness. Ideal for timed practice, self-assessment, comprehensive review, and final preparation before the 2027 FE Civil examination. Use this practice exam to strengthen your knowledge across civil engineering fundamentals and develop greater confidence under exam conditions.

Content preview

FE Civil Practice Exam 2027 Edition |
Full-Length 2026–27 Questions, Correct
Answers & Rationales


1. A reinforced concrete column carries a factored axial load of 1,200 kN. If
the load is increased by 15%, what is the new factored load?

A. 1,260 kN
B. 1,320 kN
C. 1,380 kN
D. 1,410 kN

Answer: 1,380 kN

Rationale: The increased load is 1,200(1.15) = 1,380 kN. Percentage increases
should be applied to the original quantity rather than added as an absolute
value.

2. A soil sample has a wet mass of 182 g and a dry mass of 156 g. If the mass
of water is 26 g, what is the water content?

A. 12.5%
B. 14.3%

,C. 16.7%
D. 18.2%

Answer: 16.7%

Rationale: Water content is w = Mw/Ms × 100 = 26/156 × 100 = 16.7%. The
denominator is the dry mass of soil solids.

3. A simply supported beam spans 8 m and carries a uniform load of 20 kN/m
over its entire span. What is the maximum bending moment?

A. 80 kN·m
B. 120 kN·m
C. 160 kN·m
D. 320 kN·m

Answer: 160 kN·m

Rationale: For a simply supported beam under a uniform load, Mmax = wL²/8.
Thus Mmax = 20(8²)/8 = 160 kN·m.

4. A concrete cylinder has a diameter of 150 mm and fails under a
compressive load of 530 kN. What is its approximate compressive stress?

A. 20.1 MPa
B. 25.0 MPa
C. 30.0 MPa
D. 35.4 MPa

Answer: 30.0 MPa

Rationale: The cross-sectional area is π(150²)/4 = 17,671 mm². Therefore, stress
= 530,000/17,671 ≈ 30.0 MPa.

5. A survey line has a horizontal distance of 420 m and an elevation difference
of 31.5 m. What is the approximate slope expressed as a percentage?

,A. 5.5%
B. 7.5%
C. 8.2%
D. 13.3%

Answer: 7.5%

Rationale: Percent slope = elevation difference/horizontal distance × 100 =
31.5/420 × 100 = 7.5%.

6. A project has an initial cost of $250,000 and produces annual net savings of
$40,000. Ignoring salvage value, what is the simple payback period?

A. 4.25 years
B. 5.00 years
C. 6.25 years
D. 8.00 years

Answer: 6.25 years

Rationale: Simple payback = initial investment/annual savings = 250,000/40,000
= 6.25 years.

7. For a normally distributed population with mean 72 and standard deviation
8, approximately what percentage of observations lie between 56 and 88?

A. 68%
B. 90%
C. 95%
D. 99.7%

Answer: 95%

Rationale: The interval 56 to 88 is ±2 standard deviations from the mean. For a
normal distribution, approximately 95% of observations fall within ±2ς.

8. A 4-m-long steel bar has an axial tensile force of 80 kN, cross-sectional area
of 1,000 mm², and modulus of elasticity of 200 GPa. What is its elongation?

, A. 0.8 mm
B. 1.2 mm
C. 1.6 mm
D. 2.4 mm

Answer: 1.6 mm

Rationale: Stress = P/A = 80 MPa. Strain = ς/E = 80/200,000 = 0.0004. Elongation
= εL = 0.0004(4,000) = 1.6 mm.

9. A force of 12 kN acts perpendicular to a 3-m lever arm. What is the
resulting moment?

A. 4 kN·m
B. 15 kN·m
C. 36 kN·m
D. 48 kN·m

Answer: 36 kN·m

Rationale: Moment equals force multiplied by perpendicular distance: M = Fr =
12(3) = 36 kN·m.

10.A project has a present benefit of $850,000 and a present cost of $700,000.
What is the benefit-cost ratio?

A. 0.82
B. 1.00
C. 1.21
D. 1.55

Answer: 1.21

Rationale: Benefit-cost ratio = present benefits/present costs = 850,000/700,000
= 1.214. A ratio greater than 1 indicates benefits exceed costs.

11.A fluid flows through a circular pipe with diameter 0.20 m at a velocity of
2.5 m/s. What is the approximate discharge?

Document information

Uploaded on
August 29, 2026
Number of pages
36
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$27.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
mml1030
2.6
(5)
Sold
8
Followers
0
Items
1207
Last sold
5 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions