ILLINOIS ROOFING CORRECT EXAMS QUESTIONS
AND ANSWERS SURE A+
✔✔Which of these most accurately describes fastener maintance and repair procedures
in low slope roofing systems with a built up roofing? - ✔✔Widespread fastener back-out
may indicate a need for re-roofing rather than patching.
✔✔Which of these most accurately describes proper maintance and repair procedures
in low slope roofing systems with built up roof membranes? - ✔✔An area at least 18
inches beyond the perimeter of the detect should be cleaned and resurface is most
BUR patching.
✔✔Which of these most accurately describes proper maintenance procedures in low
slope roofing systems with modified bitumen membrane? - ✔✔Extend area patch at
least 8 in all directions from any part of the detect.
✔✔Which of the following most accurately describes proper maintance and repair of low
slope roofing systems with modified bitumen membranes? - ✔✔Patches can be covered
with a coat of asphalt emulsion.
✔✔Which is most likely to require tear-off and replacement of a steep slope roof? -
✔✔Signs of condensation or moisture in the existing roofing system.
✔✔A flat roof that measures 40 feet by 20 feet would have a net roof area of 800
square feet or 8 squares. If that same building had a gable roof with a 6:12 slope, the
net roof area would be which of the following. - ✔✔8.94 Squares
✔✔A hip roof measuring 40 feet by 20 feet would require how much NET drip edge? -
✔✔120 feet
, ✔✔A two person crew with one person being paid $25 per hour and the other $15 per
hour installed 10 squares of material in an 8 hour shift. What was cost of labor per
square ? - ✔✔$32 per square
✔✔An asphalt shingle job is 120 squares . What is the job duration if a three person
crew can install 15 squares per day? - ✔✔8
✔✔Which of the following results in the most lost work days ? - ✔✔Back injury
✔✔What sort of eye protection should be worn during acetylene cutting? - ✔✔Tinted
safety glasses
✔✔Which of these is always recommended when roofing employee is working with
solvents? - ✔✔Review the MDS before using the materials.
✔✔Which of these are prohibited under all circumstances for roofing systems? -
✔✔Closed toed sandles.
✔✔When is fall protection required ? - ✔✔When employees are working six feet or
more above lower level.
✔✔When, if ever, does OSHA allow for an exception to fall protection requirements ? -
✔✔A greater hazard would be created.
✔✔What is the correct response when employee appears to be injured from a roofing
work surface? - ✔✔Keep the victims head and neck stationary to prevent further
injuries.
✔✔OSHA hazard communication standards prohibit which of the following? -
✔✔Unlabeled, partially filled chemical container left overnight on a jobsite.
✔✔Which of the following describes how a roofing contractor must handle asbestos
containing materials? - ✔✔Provide worker and supervisor training to guide employees
when asbestos containing materials are found on the jobsite.
✔✔How should employees be trained about the risk of bloodborne pathogens ? -
✔✔Training materials should be written in a language familiar to employees.
✔✔Which of these is recommended in a roofing contractors emergency action plan? -
✔✔Escape routes must be specified for each roofing location and jobsite.
✔✔Which of the following task would least likely be assigned to on employee safety
committee? - ✔✔Review insurance claims and rates.
AND ANSWERS SURE A+
✔✔Which of these most accurately describes fastener maintance and repair procedures
in low slope roofing systems with a built up roofing? - ✔✔Widespread fastener back-out
may indicate a need for re-roofing rather than patching.
✔✔Which of these most accurately describes proper maintance and repair procedures
in low slope roofing systems with built up roof membranes? - ✔✔An area at least 18
inches beyond the perimeter of the detect should be cleaned and resurface is most
BUR patching.
✔✔Which of these most accurately describes proper maintenance procedures in low
slope roofing systems with modified bitumen membrane? - ✔✔Extend area patch at
least 8 in all directions from any part of the detect.
✔✔Which of the following most accurately describes proper maintance and repair of low
slope roofing systems with modified bitumen membranes? - ✔✔Patches can be covered
with a coat of asphalt emulsion.
✔✔Which is most likely to require tear-off and replacement of a steep slope roof? -
✔✔Signs of condensation or moisture in the existing roofing system.
✔✔A flat roof that measures 40 feet by 20 feet would have a net roof area of 800
square feet or 8 squares. If that same building had a gable roof with a 6:12 slope, the
net roof area would be which of the following. - ✔✔8.94 Squares
✔✔A hip roof measuring 40 feet by 20 feet would require how much NET drip edge? -
✔✔120 feet
, ✔✔A two person crew with one person being paid $25 per hour and the other $15 per
hour installed 10 squares of material in an 8 hour shift. What was cost of labor per
square ? - ✔✔$32 per square
✔✔An asphalt shingle job is 120 squares . What is the job duration if a three person
crew can install 15 squares per day? - ✔✔8
✔✔Which of the following results in the most lost work days ? - ✔✔Back injury
✔✔What sort of eye protection should be worn during acetylene cutting? - ✔✔Tinted
safety glasses
✔✔Which of these is always recommended when roofing employee is working with
solvents? - ✔✔Review the MDS before using the materials.
✔✔Which of these are prohibited under all circumstances for roofing systems? -
✔✔Closed toed sandles.
✔✔When is fall protection required ? - ✔✔When employees are working six feet or
more above lower level.
✔✔When, if ever, does OSHA allow for an exception to fall protection requirements ? -
✔✔A greater hazard would be created.
✔✔What is the correct response when employee appears to be injured from a roofing
work surface? - ✔✔Keep the victims head and neck stationary to prevent further
injuries.
✔✔OSHA hazard communication standards prohibit which of the following? -
✔✔Unlabeled, partially filled chemical container left overnight on a jobsite.
✔✔Which of the following describes how a roofing contractor must handle asbestos
containing materials? - ✔✔Provide worker and supervisor training to guide employees
when asbestos containing materials are found on the jobsite.
✔✔How should employees be trained about the risk of bloodborne pathogens ? -
✔✔Training materials should be written in a language familiar to employees.
✔✔Which of these is recommended in a roofing contractors emergency action plan? -
✔✔Escape routes must be specified for each roofing location and jobsite.
✔✔Which of the following task would least likely be assigned to on employee safety
committee? - ✔✔Review insurance claims and rates.