CPSI Exam Prep Study Guide Exam fully solved &
updated 2026(latest version verified for accuracy)
(Questions + Answers) Solved 100% Correct!!
Play your way to mastery with fun games
Match Blocks Charms NEW
Terms in this set (52)
Which of the following is covered by public use playground equipment
ASTM F1487
The site history file for a playground comprehensive inventory of all equipment, a parts
should contain list, maintenance and inspection recommendation
An opening may present a common if it grabs the 5/8 (16mm) dowel
crush or shear hazard only it
, which of the following is true when a means of hand support during transition to the
using flexible components as access platform must be provided
to a platform
A standard of care for playground all non compliance identified have been remediated
equipment and surfacing is achieved
after
which option is best when a piece of use heavy duty construction fencing in conjunction
playground equipment must be taken with signage
out of service for an extended period
of time
which of the following would be BEST Well drained area
location for a new playground
The following data are recorded leave the climber alone, ,lower the tot swing to 96
during a saftey audit of a public inches insure that the flexible climber is not the sole
playground intended for users aged means of access and remove the sliding pole
2-5 with impact attenuating surfacing:
A 96 inch (2440 mm) high free
standing climber
A tot swing with a 120 inch high rail
A flexible climber attached to a
composite structure at deck height
which of the following actions should
the CPSI recommend in order to
bring the playground into
compliance with ASTM 1487 and the
CPSC handbook
Before opening a new playground Audit the playground and rectify any non-compliant
and allowing use by the public an issues found
owner/operator should
updated 2026(latest version verified for accuracy)
(Questions + Answers) Solved 100% Correct!!
Play your way to mastery with fun games
Match Blocks Charms NEW
Terms in this set (52)
Which of the following is covered by public use playground equipment
ASTM F1487
The site history file for a playground comprehensive inventory of all equipment, a parts
should contain list, maintenance and inspection recommendation
An opening may present a common if it grabs the 5/8 (16mm) dowel
crush or shear hazard only it
, which of the following is true when a means of hand support during transition to the
using flexible components as access platform must be provided
to a platform
A standard of care for playground all non compliance identified have been remediated
equipment and surfacing is achieved
after
which option is best when a piece of use heavy duty construction fencing in conjunction
playground equipment must be taken with signage
out of service for an extended period
of time
which of the following would be BEST Well drained area
location for a new playground
The following data are recorded leave the climber alone, ,lower the tot swing to 96
during a saftey audit of a public inches insure that the flexible climber is not the sole
playground intended for users aged means of access and remove the sliding pole
2-5 with impact attenuating surfacing:
A 96 inch (2440 mm) high free
standing climber
A tot swing with a 120 inch high rail
A flexible climber attached to a
composite structure at deck height
which of the following actions should
the CPSI recommend in order to
bring the playground into
compliance with ASTM 1487 and the
CPSC handbook
Before opening a new playground Audit the playground and rectify any non-compliant
and allowing use by the public an issues found
owner/operator should