What are three reasons for a discharger submitting an NOT in SMARTs? - -
ANS☑️☑️---the facilities' industrial operations have changed and are no
longer subject to the IGP
-operation of the facility has been transferred to another entity
-the facility has ceased operations, completed closure activities, and
removed all industrial related pollutants
A person in which position would be eligible to be an LRP: Maintenance
supervisor, QISP consultant, Public works director, or Monitoring
consultant? - -ANS☑️☑️--Public works director
The temporary suspension of industrial activities requires what to be
uploaded in SMARTS? - -ANS☑️☑️---The justification for why the
monitoring is infeasible at the facility during the temporary suspension
-The projected date that the industrial activities will resume at the facility
-SWPPP revisions specifically addresses the facility stabilization BMPs
-The date the facility is fully stabilized for temporary suspension of
industrial activities
Authorized NSWDs include which of the following: discharges from a
broken water main in an employee parking lot; fire hydrant testing; rinse
water from industrial equipment washing, BMPs are deployed as needed;
water from landscape irrigation that runs through the facility's stockpiled
materials? - -ANS☑️☑️--Fire Hydrant Testing
, Name four things required to be in the SWPPP? - -ANS☑️☑️---Storm Water
Pollution Prevention Team members
-Potential pollutant sources
-Scheduled facility operating hours
-Minimum BMPs
Which of the following must the discharger identify on the facility site map:
a restroom's municipal sanitary sewer connection; structural control
measures; analytical sampling values from the previous reporting year;
each BMP implemented at the facility; spills and leaks over 42 gallons from
the previous 6 year period? - -ANS☑️☑️--Structural control measures
A discharger that has fulfilled the requirements for the temporary
suspension of industrial activities at a facility is not required to... - -
ANS☑️☑️--Perform sampling and analysis of storm water discharges
because the discharger has justified that it is infeasible to do so
Water Quality Based Corrective Actions can be required by which agency? -
-ANS☑️☑️--Regional Water Board
The IGP does not require training for the: - -ANS☑️☑️--LRP (Legally
Responsible Person)
What is the expiration date of the IGP? - -ANS☑️☑️--June 30, 2020 or the
effective date of a new IGP
If the discharger's industrial storm water discharges and/or authorized
NSWDs contain pollutants that cause violations of Receiving Water
Limitations, what must the discharger implement? - -ANS☑️☑️--Any
additional BMPs or SWPPP implementation measures as necessary to
reduce or prevent pollutants in industrial storm water discharges to meet
the Receiving Water Limitations.
CORRECT SOLUTIONS 2026/GRADED A+
What are three reasons for a discharger submitting an NOT in SMARTs? - -
ANS☑️☑️---the facilities' industrial operations have changed and are no
longer subject to the IGP
-operation of the facility has been transferred to another entity
-the facility has ceased operations, completed closure activities, and
removed all industrial related pollutants
A person in which position would be eligible to be an LRP: Maintenance
supervisor, QISP consultant, Public works director, or Monitoring
consultant? - -ANS☑️☑️--Public works director
The temporary suspension of industrial activities requires what to be
uploaded in SMARTS? - -ANS☑️☑️---The justification for why the
monitoring is infeasible at the facility during the temporary suspension
-The projected date that the industrial activities will resume at the facility
-SWPPP revisions specifically addresses the facility stabilization BMPs
-The date the facility is fully stabilized for temporary suspension of
industrial activities
Authorized NSWDs include which of the following: discharges from a
broken water main in an employee parking lot; fire hydrant testing; rinse
water from industrial equipment washing, BMPs are deployed as needed;
water from landscape irrigation that runs through the facility's stockpiled
materials? - -ANS☑️☑️--Fire Hydrant Testing
, Name four things required to be in the SWPPP? - -ANS☑️☑️---Storm Water
Pollution Prevention Team members
-Potential pollutant sources
-Scheduled facility operating hours
-Minimum BMPs
Which of the following must the discharger identify on the facility site map:
a restroom's municipal sanitary sewer connection; structural control
measures; analytical sampling values from the previous reporting year;
each BMP implemented at the facility; spills and leaks over 42 gallons from
the previous 6 year period? - -ANS☑️☑️--Structural control measures
A discharger that has fulfilled the requirements for the temporary
suspension of industrial activities at a facility is not required to... - -
ANS☑️☑️--Perform sampling and analysis of storm water discharges
because the discharger has justified that it is infeasible to do so
Water Quality Based Corrective Actions can be required by which agency? -
-ANS☑️☑️--Regional Water Board
The IGP does not require training for the: - -ANS☑️☑️--LRP (Legally
Responsible Person)
What is the expiration date of the IGP? - -ANS☑️☑️--June 30, 2020 or the
effective date of a new IGP
If the discharger's industrial storm water discharges and/or authorized
NSWDs contain pollutants that cause violations of Receiving Water
Limitations, what must the discharger implement? - -ANS☑️☑️--Any
additional BMPs or SWPPP implementation measures as necessary to
reduce or prevent pollutants in industrial storm water discharges to meet
the Receiving Water Limitations.