Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 3 pages
Exam (elaborations)

ICC Special Inspector GR CORRECT 100% ICC Special Inspector GR CORRECT 100

Document preview thumbnail
Preview 1 out of 3 pages

The responsibility of ensuring that day to day work is covered by inspections falls on 1. the building official 2. the contractor 3. the special inspector agency 4. the owner - ANSWERthe contractor ____________________ issues final acceptance of a building. 1. the building official 2. the owner 3. the special inspector agency 4. the design professional - ANSWERthe building official

Content preview

ICC Special Inspector GR CORRECT
100%
The responsibility of ensuring that day to day work is covered by inspections falls on

1. the building official
2. the contractor
3. the special inspector agency
4. the owner - ANSWERthe contractor

____________________ issues final acceptance of a building.

1. the building official
2. the owner
3. the special inspector agency
4. the design professional - ANSWERthe building official

SIM, chapter 4, page 29

A preconstruction meeting is:

1. Required prior to start of construction
2. Initiated by the general contractor
3. Usually held on the Friday before construction starts
4. A good time to bring up non-conforming items - ANSWERInitiated by the general
contractor

SIM, chapter 3, page 28

The duties of a special inspector include all of the following except:

1. review the approved plans and specifications for special inspection requirements
2. inspect work for compliance with the building department approved plans
3. notify, in writing, the building official and engineer of record of unresolved deviations
4. issuing stop work notices - ANSWERIssuing stop work notices

SIM, chapter 2

When reporting non-conforming items, all of the following items must be in the report
except:

1. Time of notification of the contractor
2. Name and title of each individual notified
3. Reference to applicable detail of approved plans, job specifications or code

Document information

Uploaded on
August 28, 2026
Number of pages
3
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
shantelleG
4.0
(118)
Sold
651
Followers
369
Items
18358
Last sold
5 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions