100%
The responsibility of ensuring that day to day work is covered by inspections falls on
1. the building official
2. the contractor
3. the special inspector agency
4. the owner - ANSWERthe contractor
____________________ issues final acceptance of a building.
1. the building official
2. the owner
3. the special inspector agency
4. the design professional - ANSWERthe building official
SIM, chapter 4, page 29
A preconstruction meeting is:
1. Required prior to start of construction
2. Initiated by the general contractor
3. Usually held on the Friday before construction starts
4. A good time to bring up non-conforming items - ANSWERInitiated by the general
contractor
SIM, chapter 3, page 28
The duties of a special inspector include all of the following except:
1. review the approved plans and specifications for special inspection requirements
2. inspect work for compliance with the building department approved plans
3. notify, in writing, the building official and engineer of record of unresolved deviations
4. issuing stop work notices - ANSWERIssuing stop work notices
SIM, chapter 2
When reporting non-conforming items, all of the following items must be in the report
except:
1. Time of notification of the contractor
2. Name and title of each individual notified
3. Reference to applicable detail of approved plans, job specifications or code