CWEA Collections 1 EXAM Questions
and
Answers Verified Solutions Latest
Update
Question:
Sanitary Sewer System Management Plan.
Answer:
The goal of a sanitary sewer system is to provide a plan and schedule to properly
manage, operate, and maintain all parts of the system.
Question:
Basic Elements of a Safety Program.
Answer:
The basic elements include accident investigation, injury frequency rates, and safety
policy statement.
Question:
Easement Considerations.
Answer:
When obtaining an easement for construction and maintenance of a collection system,
access for equipment and personnel must be considered.
Question:
Immediate Response to Board or Council.
Answer:
If you do not know all the answers, you should respond with the information available
and update them with more.
,Question:
Managing Substandard Performance.
Answer:
Discuss the problem with the substandard foreman and offer to help before any other
action is taken.
Question:
Pipe Material Selection.
Answer:
In selecting pipe material for maximum service life, the life expectancy of the pipe is
the most important factor.
Question:
Flow Capacity of a Sewer Line.
Answer:
The flow capacity of a sewer line is affected by backfill material, manhole spacing, and
pipe size.
Question:
Grade Conflict Solution.
Answer:
When a grade conflict exists between a water main and a sewer main, the best solution
is to drop the sewer service under the water main and let it work like a siphon.
Question:
Challenges in Wastewater Collection Replacement.
Answer:
The replacement of wastewater collection systems in some downtown streets is
difficult due to crowding of other underground utilities.
, Question:
Rescue Service Practice Conditions.
Answer:
Each member of the rescue service must practice permit space rescues at least once a
year in a simulated situation or by the satisfactory performance of an actual rescue.
Question:
Camera Wedge Problem.
Answer:
If the camera becomes wedged during a video inspection, the first step in solving the
problem is to dig up the area where the camera is wedged.
Question:
As Built Drawings.
Answer:
Construction drawings issued to the contractor, corrected construction drawings
showing changes made in the field installation, detailed drawings of proposed
construction, and sectional maps on file.
Question:
Category 1 Sanitary Sewer Overflows Reporting.
Answer:
Legally Responsible Officials are required to report within 30 days, before the end of
the day, as soon as possible, or within 2 hrs.
Question:
Span & Control.
Answer:
Relates to the number of subordinates who can be supervised effectively by one
supervisor, which at the top level of organizations is typically 2 to 4, 3 to 5, 6 to 8, or 9
to 11.
and
Answers Verified Solutions Latest
Update
Question:
Sanitary Sewer System Management Plan.
Answer:
The goal of a sanitary sewer system is to provide a plan and schedule to properly
manage, operate, and maintain all parts of the system.
Question:
Basic Elements of a Safety Program.
Answer:
The basic elements include accident investigation, injury frequency rates, and safety
policy statement.
Question:
Easement Considerations.
Answer:
When obtaining an easement for construction and maintenance of a collection system,
access for equipment and personnel must be considered.
Question:
Immediate Response to Board or Council.
Answer:
If you do not know all the answers, you should respond with the information available
and update them with more.
,Question:
Managing Substandard Performance.
Answer:
Discuss the problem with the substandard foreman and offer to help before any other
action is taken.
Question:
Pipe Material Selection.
Answer:
In selecting pipe material for maximum service life, the life expectancy of the pipe is
the most important factor.
Question:
Flow Capacity of a Sewer Line.
Answer:
The flow capacity of a sewer line is affected by backfill material, manhole spacing, and
pipe size.
Question:
Grade Conflict Solution.
Answer:
When a grade conflict exists between a water main and a sewer main, the best solution
is to drop the sewer service under the water main and let it work like a siphon.
Question:
Challenges in Wastewater Collection Replacement.
Answer:
The replacement of wastewater collection systems in some downtown streets is
difficult due to crowding of other underground utilities.
, Question:
Rescue Service Practice Conditions.
Answer:
Each member of the rescue service must practice permit space rescues at least once a
year in a simulated situation or by the satisfactory performance of an actual rescue.
Question:
Camera Wedge Problem.
Answer:
If the camera becomes wedged during a video inspection, the first step in solving the
problem is to dig up the area where the camera is wedged.
Question:
As Built Drawings.
Answer:
Construction drawings issued to the contractor, corrected construction drawings
showing changes made in the field installation, detailed drawings of proposed
construction, and sectional maps on file.
Question:
Category 1 Sanitary Sewer Overflows Reporting.
Answer:
Legally Responsible Officials are required to report within 30 days, before the end of
the day, as soon as possible, or within 2 hrs.
Question:
Span & Control.
Answer:
Relates to the number of subordinates who can be supervised effectively by one
supervisor, which at the top level of organizations is typically 2 to 4, 3 to 5, 6 to 8, or 9
to 11.