Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

CPSI EXAM Questions and Answers Verified Solutions Latest Update 8

Document preview thumbnail
Preview 2 out of 11 pages

CPSI EXAM Questions and Answers Verified Solutions Latest Update 8

Content preview

CPSI EXAM Questions and Answers
Verified Solutions Latest Update


Question:

The site history file for a playground should contain.

Answer:
comprehensive inventory of all equipment, a parts list, maintenance and inspection
recommendation


Question:

An opening may present a common crush or shear hazard only it.

Answer:
if it grabs the 5/8 (16mm) dowel


Question:

which of the following is true when using flexible components as access to a platform.

Answer:
a means of hand support during transition to the platform must be provided


Question:

A standard of care for playground equipment and surfacing is achieved after.

Answer:
all non compliance identified have been remediated


Question:

which option is best when a piece of playground equipment must be taken out of
service for an extended period of time.

Answer:
use heavy duty construction fencing in conjunction with signage

, Question:

which of the following would be BEST location for a new playground.

Answer:
Well drained area


Question:

The following data are recorded during a saftey audit of a public playground intended
for users aged 2-5 with impact attenuating surfacing: A 96 inch (2440 mm) high free
standing climber A tot swing with a 120 inch high rail A flexible climber attached to a
composite structure at deck height which of the following actions should the CPSI
recommend in order to bring the playground into compliance with ASTM 1487 and the
CPSC handbook.

Answer:
leave the climber alone, ,lower the tot swing to 96 inches insure that the flexible
climber is not the sole means of access and remove the sliding pole


Question:

Before opening a new playground and allowing use by the public an owner/operator
should.

Answer:
Audit the playground and rectify any non-compliant issues found


Question:

A cpsi discovers that an independent shade structure is 72 inches above the pivot point
of a swing. The CPSI should.

Answer:
document non-compliance


Question:

which of the following should be used when conducting safety audits.

Answer:
Head and torso probe used to test openings for possible head entrapment should be
used

Document information

Uploaded on
August 28, 2026
Number of pages
11
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$9.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
SirViktor
5.0
(3)
Sold
3
Followers
1
Items
2356
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions