ICC Masonry Exam with answers
|\ |\ |\ |\
Which of the following is the standard specification for
|\ |\ |\ |\ |\ |\ |\ |\ |\
loadbearing |\
concrete masonry units? - CORRECT ANSWERS ✔✔ASTM C
|\ |\ |\ |\ |\ |\ |\
90; RCMCI 6th Edition, Section 2.2.1
|\ |\ |\ |\ |\ |\
Which of the following grout admixtures is used to obtain
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
a high
|\ |\
slump with reduced water? - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\
✔✔Super plasticizer; RCMCI 6th Edition, Section 2.11.6
|\ |\ |\ |\ |\ |\
Which of the following is the standard specification that
|\ |\ |\ |\ |\ |\ |\ |\ |\
autoclaved aerated concrete masonry units must conform |\ |\ |\ |\ |\ |\
to for the strength class specified in the contract
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
documents? - CORRECT ANSWERS ✔✔ASTM C 1386; CI |\ |\ |\ |\ |\ |\ |\ |\
530; Part 2, Section 2.3E. IBC
|\ |\ |\ |\ |\ |\
2103.3
Grout intended for use in the construction of engineered
|\ |\ |\ |\ |\ |\ |\ |\ |\
and |\
empirically designed masonry structures must comply |\ |\ |\ |\ |\ |\
with - CORRECT ANSWERS ✔✔ASTM C 476; 2006 IBC
|\ |\ |\ |\ |\ |\ |\ |\ |\
2103.12
,The slump test for grout must be performed in
|\ |\ |\ |\ |\ |\ |\ |\ |\
accordance with - CORRECT ANSWERS ✔✔ASTM C 1019; |\ |\ |\ |\ |\ |\ |\ |\
ASTM - C1019-03 |\ |\
In what condition are grout specimens to be tested? -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔Damp; ASTM - 1019-03 |\ |\ |\ |\ |\
When the prism test method is being utilized, how long
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
must the |\ |\
prisms cure prior to being cut? - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔28; 2006 IBC 2105.3.1 |\ |\ |\
After construction and grouting, masonry test prisms
|\ |\ |\ |\ |\ |\ |\
should not be |\ |\ |\
disturbed or moved for a minimum of - CORRECT |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔48 hours; ASTM - C 1314, Section 5.10 |\ |\ |\ |\ |\ |\ |\ |\
When field sampling grout, the elapsed time between
|\ |\ |\ |\ |\ |\ |\ |\
obtaining the |\ |\
first and final portions of the sample shall not be more
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
than - CORRECT ANSWERS ✔✔15 minutes; ASTM - C1019,
|\ |\ |\ |\ |\ |\ |\ |\
Section 7.2.1
|\ |\
, If mortar compression tests are required, how many tests
|\ |\ |\ |\ |\ |\ |\ |\ |\
per day are to be taken for the three successive work
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
days at the start of the job? - CORRECT ANSWERS ✔✔1;
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
RCMCI 6th Edition, 3.2.4 |\ |\ |\
Glass unit masonry shall not be laid at temperatures
|\ |\ |\ |\ |\ |\ |\ |\ |\
below - CORRECT ANSWERS ✔✔60 degrees F; 2006 IBC
|\ |\ |\ |\ |\ |\ |\ |\ |\
2104.3.2.1
What is the maximum mean daily temperature permitted
|\ |\ |\ |\ |\ |\ |\ |\
before newly constructed masonry must be fog sprayed
|\ |\ |\ |\ |\ |\ |\ |\
during curing? - CORRECT ANSWERS ✔✔100 degrees F;
|\ |\ |\ |\ |\ |\ |\ |\
2006 IBC 2104.4.3
|\ |\
When the temperature is below 40 degrees F, newly
|\ |\ |\ |\ |\ |\ |\ |\ |\
constructed |\
masonry must be covered with a weather resistant
|\ |\ |\ |\ |\ |\ |\ |\
membrane for a |\ |\ |\
minimum of - CORRECT ANSWERS ✔✔24 hours; 2006 IBC |\ |\ |\ |\ |\ |\ |\ |\ |\
2104.3.3.3
After initial mixing, when the ambient temperature
|\ |\ |\ |\ |\ |\ |\
exceeds 90 |\ |\
degrees F with a wind velocity over 8 mph, mortar used in
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
masonry
|\ |\
|\ |\ |\ |\
Which of the following is the standard specification for
|\ |\ |\ |\ |\ |\ |\ |\ |\
loadbearing |\
concrete masonry units? - CORRECT ANSWERS ✔✔ASTM C
|\ |\ |\ |\ |\ |\ |\
90; RCMCI 6th Edition, Section 2.2.1
|\ |\ |\ |\ |\ |\
Which of the following grout admixtures is used to obtain
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
a high
|\ |\
slump with reduced water? - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\
✔✔Super plasticizer; RCMCI 6th Edition, Section 2.11.6
|\ |\ |\ |\ |\ |\
Which of the following is the standard specification that
|\ |\ |\ |\ |\ |\ |\ |\ |\
autoclaved aerated concrete masonry units must conform |\ |\ |\ |\ |\ |\
to for the strength class specified in the contract
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
documents? - CORRECT ANSWERS ✔✔ASTM C 1386; CI |\ |\ |\ |\ |\ |\ |\ |\
530; Part 2, Section 2.3E. IBC
|\ |\ |\ |\ |\ |\
2103.3
Grout intended for use in the construction of engineered
|\ |\ |\ |\ |\ |\ |\ |\ |\
and |\
empirically designed masonry structures must comply |\ |\ |\ |\ |\ |\
with - CORRECT ANSWERS ✔✔ASTM C 476; 2006 IBC
|\ |\ |\ |\ |\ |\ |\ |\ |\
2103.12
,The slump test for grout must be performed in
|\ |\ |\ |\ |\ |\ |\ |\ |\
accordance with - CORRECT ANSWERS ✔✔ASTM C 1019; |\ |\ |\ |\ |\ |\ |\ |\
ASTM - C1019-03 |\ |\
In what condition are grout specimens to be tested? -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔Damp; ASTM - 1019-03 |\ |\ |\ |\ |\
When the prism test method is being utilized, how long
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
must the |\ |\
prisms cure prior to being cut? - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔28; 2006 IBC 2105.3.1 |\ |\ |\
After construction and grouting, masonry test prisms
|\ |\ |\ |\ |\ |\ |\
should not be |\ |\ |\
disturbed or moved for a minimum of - CORRECT |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔48 hours; ASTM - C 1314, Section 5.10 |\ |\ |\ |\ |\ |\ |\ |\
When field sampling grout, the elapsed time between
|\ |\ |\ |\ |\ |\ |\ |\
obtaining the |\ |\
first and final portions of the sample shall not be more
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
than - CORRECT ANSWERS ✔✔15 minutes; ASTM - C1019,
|\ |\ |\ |\ |\ |\ |\ |\
Section 7.2.1
|\ |\
, If mortar compression tests are required, how many tests
|\ |\ |\ |\ |\ |\ |\ |\ |\
per day are to be taken for the three successive work
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
days at the start of the job? - CORRECT ANSWERS ✔✔1;
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
RCMCI 6th Edition, 3.2.4 |\ |\ |\
Glass unit masonry shall not be laid at temperatures
|\ |\ |\ |\ |\ |\ |\ |\ |\
below - CORRECT ANSWERS ✔✔60 degrees F; 2006 IBC
|\ |\ |\ |\ |\ |\ |\ |\ |\
2104.3.2.1
What is the maximum mean daily temperature permitted
|\ |\ |\ |\ |\ |\ |\ |\
before newly constructed masonry must be fog sprayed
|\ |\ |\ |\ |\ |\ |\ |\
during curing? - CORRECT ANSWERS ✔✔100 degrees F;
|\ |\ |\ |\ |\ |\ |\ |\
2006 IBC 2104.4.3
|\ |\
When the temperature is below 40 degrees F, newly
|\ |\ |\ |\ |\ |\ |\ |\ |\
constructed |\
masonry must be covered with a weather resistant
|\ |\ |\ |\ |\ |\ |\ |\
membrane for a |\ |\ |\
minimum of - CORRECT ANSWERS ✔✔24 hours; 2006 IBC |\ |\ |\ |\ |\ |\ |\ |\ |\
2104.3.3.3
After initial mixing, when the ambient temperature
|\ |\ |\ |\ |\ |\ |\
exceeds 90 |\ |\
degrees F with a wind velocity over 8 mph, mortar used in
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
masonry
|\ |\