Emergency Operations Plans should be consistent with the National Incident Management
System (NIMS). - Answers -true
The operational period is a fixed 12-hour period within which tactics must be completed -
Answers -false
Mutual aid is the mandatory provision of resources by agencies or organizations to assist each
other when existing resources are inadequate - Answers -false
All 50 states, the District of Columbia, Puerto Rico, Guam, and the U.S. Virgin Islands can
participate in mutual aid through the Emergency Management Assistance Compact (EMAC). -
Answers -true
Instructions: The below case study is based on actual events. Read the case study and then
select the recommended course of action.
On July 18, 2001, a train carrying hazardous chemicals derailed and caught fire in a downtown
Baltimore tunnel, causing a near shutdown of the city and burning so hot that firefighters
couldn't reach the flames for 8 hours.
1|Page
,At one point, all major highways into the city were blocked off, a Baltimore Orioles game at
nearby Camden Yards was canceled, and the Inner Harbor was closed to boat traffic. A water-
main break near the tunnel added to the chaos, causing the collapse of part of a major
thoroughfare and power outages.
Select your strategy: - Answers -given the magnitude of this incident, assign all command staff
immediately to support the incident commander
Instructions: Read the question below and then select the correct answer.
An agency or organization providing personnel, services, or other resources to the agency with
direct responsibility for incident management is called a(n): - Answers -assisting agency
Instructions: Read the question below and then select the correct answer.
An ___________ is an individual assigned to an incident from an assisting or cooperating
agency. - Answers -agency representative
You have been asked to assist Emerald City in its response to increasing flooding. The National
Weather Service (NWS) reports it has been raining heavily for the past 7 days, averaging 1.3
inches of rain each 24-hour period.
The areas of concerns are as follows:
The Rapid River, which runs north and south through Emerald City, is experiencing slow-rise
flooding.
The flooding is being aggravated by debris catching on the low bridge downstream from lower
Lake Emerald. Located near the bridge is the Lake Emerald Independent Living Complex, which
includes a skilled nursing facility.
Residents are being asked to evacuate their homes in anticipation of the rising floodwaters.
2|Page
, It is 1200 hours, and the NWS has just informed the County Emergency Management office that
the flooding is expected to crest at 1800 today. It is expected that this flood crest will cause
flooding as indicated on the projected floodplain map. - Answers -divide the operations section
into three divisions, each assigned to a different geographical area to evacuate
Instructions: Review the scenario below, select the best course of action, then select Check.
Rain is continuing and response resources are being ordered to address the needs of flood
victims and restore essential services.
Select the best course of action: - Answers -assign a staging area manager who will report to the
operations section chief
Instructions: Review the scenario below, select the best course of action, then select Check.
With the addition of the Staging Area, the Operations Section Chief has the following
subordinate leaders reporting directly to him: Staging Area Manager, Division A Supervisor,
Division B Supervisor, Division C Supervisor, Flood Control Group Supervisor, and Nursing Home
Task Force Leader.
After the river crests, the Operations Section will need to perform additional functions such as
control the perimeter, perform search and rescue operations, and restore utilities.
The Operations Section Chief should: - Answers -add branches to allow for another level of
supervision for the expanding resources
Instructions: Review the scenario below, select the best course of action, then select Check.
As predicted, the river crested at 3 feet above flood level. Search and rescue operations are
underway. There is increasing concern about the nuclear power plant in the downstream area.
Three people lost their lives and numerous people suffered injuries. Mutual aid resources are
arriving from three surrounding jurisdictions. Incident response is expected to continue for the
next 36 hours.
3|Page
Response Exam Practice Latest 2026 Updated Questions and
Verified 100% Solutions (2026/2027) Grade: A+|Status:
Guaranteed Pass
Emergency Operations Plans should be consistent with the National Incident Management
System (NIMS). - Answers -true
The operational period is a fixed 12-hour period within which tactics must be completed -
Answers -false
Mutual aid is the mandatory provision of resources by agencies or organizations to assist each
other when existing resources are inadequate - Answers -false
All 50 states, the District of Columbia, Puerto Rico, Guam, and the U.S. Virgin Islands can
participate in mutual aid through the Emergency Management Assistance Compact (EMAC). -
Answers -true
Instructions: The below case study is based on actual events. Read the case study and then
select the recommended course of action.
On July 18, 2001, a train carrying hazardous chemicals derailed and caught fire in a downtown
Baltimore tunnel, causing a near shutdown of the city and burning so hot that firefighters
couldn't reach the flames for 8 hours.
1|Page
,At one point, all major highways into the city were blocked off, a Baltimore Orioles game at
nearby Camden Yards was canceled, and the Inner Harbor was closed to boat traffic. A water-
main break near the tunnel added to the chaos, causing the collapse of part of a major
thoroughfare and power outages.
Select your strategy: - Answers -given the magnitude of this incident, assign all command staff
immediately to support the incident commander
Instructions: Read the question below and then select the correct answer.
An agency or organization providing personnel, services, or other resources to the agency with
direct responsibility for incident management is called a(n): - Answers -assisting agency
Instructions: Read the question below and then select the correct answer.
An ___________ is an individual assigned to an incident from an assisting or cooperating
agency. - Answers -agency representative
You have been asked to assist Emerald City in its response to increasing flooding. The National
Weather Service (NWS) reports it has been raining heavily for the past 7 days, averaging 1.3
inches of rain each 24-hour period.
The areas of concerns are as follows:
The Rapid River, which runs north and south through Emerald City, is experiencing slow-rise
flooding.
The flooding is being aggravated by debris catching on the low bridge downstream from lower
Lake Emerald. Located near the bridge is the Lake Emerald Independent Living Complex, which
includes a skilled nursing facility.
Residents are being asked to evacuate their homes in anticipation of the rising floodwaters.
2|Page
, It is 1200 hours, and the NWS has just informed the County Emergency Management office that
the flooding is expected to crest at 1800 today. It is expected that this flood crest will cause
flooding as indicated on the projected floodplain map. - Answers -divide the operations section
into three divisions, each assigned to a different geographical area to evacuate
Instructions: Review the scenario below, select the best course of action, then select Check.
Rain is continuing and response resources are being ordered to address the needs of flood
victims and restore essential services.
Select the best course of action: - Answers -assign a staging area manager who will report to the
operations section chief
Instructions: Review the scenario below, select the best course of action, then select Check.
With the addition of the Staging Area, the Operations Section Chief has the following
subordinate leaders reporting directly to him: Staging Area Manager, Division A Supervisor,
Division B Supervisor, Division C Supervisor, Flood Control Group Supervisor, and Nursing Home
Task Force Leader.
After the river crests, the Operations Section will need to perform additional functions such as
control the perimeter, perform search and rescue operations, and restore utilities.
The Operations Section Chief should: - Answers -add branches to allow for another level of
supervision for the expanding resources
Instructions: Review the scenario below, select the best course of action, then select Check.
As predicted, the river crested at 3 feet above flood level. Search and rescue operations are
underway. There is increasing concern about the nuclear power plant in the downstream area.
Three people lost their lives and numerous people suffered injuries. Mutual aid resources are
arriving from three surrounding jurisdictions. Incident response is expected to continue for the
next 36 hours.
3|Page