Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 3 van de 29 pagina's
Tentamen (uitwerkingen)

CON 39902 Exam Questions and Answers Verified Solutions Latest Update

Document preview thumbnail
Voorbeeld 3 van de 29 pagina's

CON 39902 Exam Questions and Answers Verified Solutions Latest Update

Voorbeeld van de inhoud

CON 3990V Exam Questions and
Answers Verified Solutions Latest
Update


Question:

Which clause is related to Acquisition?

Answer:
52.215 - Instructions to Offerors-Competitive Acquistion


Question:

What is considered a contract action?

Answer:
Contract action means any oral or written action that results in the purchase, rent, or
lease of supplies or equipment, services, or construction.


Question:

What is latent defect?

Answer:
is one that is not readily noticeable upon reasonable inspection at the time of
acceptance.


Question:

Who accepts the burden of latent defect?

Answer:
The burden is on the government to prove that defective material and workmanship
was the probable cause of product failure or non-conformance.

,Question:

Who can you submit a claim to?

Answer:
Contractor claims are submitted to the KO


Question:

What is a claim?

Answer:
a written demand or assertion by one of the contracting parties seeking (i) payment of
a specific sum of money, (ii) adjustment or interpretation of contract terms, or (iii)
other relief arising under or relating to the contract.


Question:

When is written certification for a claim required?

Answer:
When a claim exceeds $100,000, contractors must provide the following written
certification (FAR 33.207).


Question:

What are protests?

Answer:
they provide offerors with a tool to challenge federal contract award decisions.


Question:

Who do you file a protest with?

Answer:
The Government Accountability Office

, Question:

There is a janitorial contract for 2.8 million dollars for the entire base. What FAR part
would you use?

Answer:
Could be FAR Part 37 Service Contracting or Far Part 12 Acquisition of Commercial
Products and Commercial Services


Question:

What common form do you use for a modification?

Answer:
SF-30


Question:

What FAR Part is Acquisition Planning?

Answer:
FAR Part 7


Question:

What role does the Program Manager plan in Acquistion Planning?

Answer:
The PM has overall responsibility of a contract


Question:

What is the KO's role in Acquisition Planning?

Answer:
Ensures plan is implemented and developed.


Question:

What are the three phases of a life cycle?

Answer:
Pre-award Phase Award Phase Post-award phase

Documentinformatie

Geüpload op
26 augustus 2026
Aantal pagina's
29
Geschreven in
2026/2027
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
$9.99

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
SirViktor
5.0
(3)
Verkocht
3
Volgers
1
Items
2315
Laatst verkocht
5 dagen geleden



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen