1. What is the primary purpose of a highway project's plans
and specifications?
A. To establish the contractor's profit margin
B. To provide the contractor's equipment list
C. To define the work, materials, dimensions, and
requirements of the project
D. To determine the contractor's tax liability
Answer: To define the work, materials, dimensions, and
requirements of the project
Rationale: The plans and specifications establish what is
to be constructed and the standards, materials,
dimensions, and procedures required for the work.
2. What document generally contains written requirements
that supplement the construction drawings?
A. Daily equipment report
B. Project specifications
C. Employee timecard
D. Equipment rental agreement
Answer: Project specifications
Rationale: Specifications provide written requirements
for materials, workmanship, testing, construction
procedures, and other contract requirements.
, 3. Before submitting a bid, a contractor should first
determine the project quantities by:
A. Guessing from the project price
B. Reviewing the plans, specifications, and quantity
information
C. Using the previous year's quantities
D. Asking the equipment operator
Answer: Reviewing the plans, specifications, and quantity
information
Rationale: Accurate estimating requires careful review
of contract documents and verification of quantities
wherever practical.
4. What is the purpose of a bid bond?
A. To insure construction equipment
B. To guarantee employee wages
C. To provide security that the bidder will honor the bid
if awarded the contract
D. To pay material suppliers
Answer: To provide security that the bidder will honor the
bid if awarded the contract
Rationale: A bid bond protects the project owner if the
successful bidder refuses to execute the contract or
otherwise fails to meet specified award requirements.
5. What is the difference between direct and indirect costs?
A. Direct costs are always fixed
B. Indirect costs are never included in a bid
C. Direct costs can be assigned to specific work, while
indirect costs support the project or business generally
D. There is no difference
Answer: Direct costs can be assigned to specific work,
while indirect costs support the project or business
generally
,Rationale: Labor, material, and equipment used directly
for an activity are direct costs. Supervision, office
expenses, insurance, and similar expenses may be
indirect costs.
6. A contractor estimates 10,000 cubic yards of excavation at
$4.50 per cubic yard. What is the estimated excavation
cost?
A. $4,500
B. $22,500
C. $45,000
D. $450,000
Answer: $45,000
Rationale: Quantity multiplied by unit price equals cost:
10,000 × $4.50 = $45,000.
7. What is the primary purpose of a change order?
A. To cancel the contractor's license
B. To formally modify the contract work, price, time, or
other contract requirements
C. To replace all project plans
D. To eliminate required inspections
Answer: To formally modify the contract work, price,
time, or other contract requirements
Rationale: A properly authorized change order
documents modifications to the original contract.
8. What does a unit price represent?
A. The total project cost
B. The contractor's annual overhead
C. The price for one unit of a particular item of work
D. The cost of all materials on the project
Answer: The price for one unit of a particular item of
work
, Rationale: Unit-price contracts pay based on measured
quantities multiplied by the applicable unit prices.
9. What is retainage?
A. A contractor's equipment allowance
B. A material delivery charge
C. A portion of earned payment temporarily withheld
according to the contract
D. A bid preparation fee
Answer: A portion of earned payment temporarily
withheld according to the contract
Rationale: Retainage is commonly withheld as security
for proper completion and fulfillment of contract
obligations.
10. What is the primary purpose of a performance bond?
A. To guarantee fuel prices
B. To provide security for satisfactory performance of
the contract
C. To pay the contractor's payroll taxes
D. To replace workers' compensation insurance
Answer: To provide security for satisfactory performance
of the contract
Rationale: A performance bond protects the obligee
against certain losses resulting from the contractor's
failure to perform the contract.
11. If an excavation area is 200 feet long and 50 feet
wide, what is the area?
A. 250 square feet
B. 2,500 square feet
C. 10,000 square feet
D. 100,000 square feet
Answer: 10,000 square feet