• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

CEPSCI CERTIFICATION EXAM WITH COMPLETE QUESTIONS AND CORRECT ANSWERS!!!! ALREADY GRADED A+

Document preview thumbnail
Preview 2 out of 15 pages

CEPSCI CERTIFICATION EXAM WITH COMPLETE QUESTIONS AND CORRECT ANSWERS!!!! ALREADY GRADED A+

Content preview

CEPSCI CERTIFICATION EXAM WITH COMPLETE QUESTIONS AND
CORRECT ANSWERS!!!! ALREADY GRADED A+



Administered by the US environmental protection agency (EPA) Created the NPDES - (answer)1972 clean
water act



Amendment to CWA CALLED WATER QUALITY ACT - (answer)1987



South Carolina is NPDES delegated state. - (answer)NPDES in south carolina



SCDHEC - (answer)NPDES regulations are administered by



stormwater discharges from construction sites - (answer)CGP authorizes



land disturbing activities greater than or equal to 1 acre

-land disturbance less than 1 ac within 1/2 miles of water body in SC costal zone - (answer)Who must
obtain NPDES coverage



operator-person or company for a particular discharge - (answer)NPDES permits are issued to



-has day to day operational control to ensure compliance with SWPP

-typically the owner or developer - (answer)primary permittee



submit NOI, Preparation of the C_SWPPP - (answer)primary permittee responsibilites



individual lot owner or residential builder that conducts land disturbing activity limited to an individual
lot or group of lots as part of approved LCP of development - (answer)Secondary permittee



must on Contractor Certification- D-0437 - (answer)contractors

, CEPSCI CERTIFICATION EXAM WITH COMPLETE QUESTIONS AND
CORRECT ANSWERS!!!! ALREADY GRADED A+



SCDHEC CGP, NOI, NPDES coverage approval letter, Contractor Certifications, Local Approvals, USACE
approvals, Critical area permit(coast) - (answer)On-Site SWPPP



a copy of signed and certified SWPPP, NOI, and CGP coverage letter from DHEC must be retained at site
or electronically accessible - (answer)OS_SWPPP



minor modifications made directly in the field,do not need approval by DHEC- additional BMP's, removal
of disturbed areas - (answer)minor modification to ON-SWPPP



must be made by qualified individual and submitted to DHEC or appropriate delegated entity for
approval - (answer)major modifications to OS-SWPPP



include a phased stormwater management plan which identifies all BMP's and grading work conducted
during a specific portion of the sites construction sequence. Each phase identified on at least one
separate plan sheet. - (answer)Phased plan requirement > 5



at least two separate plan phases are required - initial land disturbance phase - stabilization phase -
(answer)Phased plan requirement < 10 but > 5 acres



at least 3 separate plan phases are required - initial land disturbance phase - construction phase -
stabilization phase - (answer)Phased plan requirement ≥ 10 acres



1. areas of site disturbed by construction activity and areas used for storage of materials exposed to
precipitation

2. stormwater conveyance systems for evidence of sediment

3. BMP's identified in OS-SWPPP

4. Discharge location to investigate if sediment leaving site, or if such locations are inaccessible, nearby
downstream location if possible.

5. Where vehicles enter or exit site for evidence of off-site sediment tracking. - (answer)All compliance
inspection must include invesg. of, at a minimum of 5 of the following

Document information

Uploaded on
August 25, 2026
Number of pages
15
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$22.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AugStudier
5.0
(502)
Sold
3198
Followers
2
Items
529
Last sold
8 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions