1. What is the primary purpose of bedding beneath a utility pipe?
A. Increase pipe pressure rating
B. Provide uniform support and prevent point loading
C. Eliminate the need for backfill
D. Increase trench width
Correct answer: Provide uniform support and prevent point loading
Rationale: Proper bedding distributes the pipe load uniformly and helps
prevent concentrated stresses that can damage or deform the pipe.
2. Before excavating in an area where underground utilities may exist, the
contractor should first:
A. Begin excavation with a backhoe
B. Review only the construction drawings
C. Have underground utilities located and marked
D. Remove all surface material
Correct answer: Have underground utilities located and marked
Rationale: Existing utility locations must be established before excavation
so the crew can avoid damaging underground facilities and protect workers
and the public.
3. What is the main purpose of trench shoring?
A. Increase production
B. Prevent soil from entering the pipe
C. Protect workers from cave-ins
D. Improve pipe alignment
,Correct answer: Protect workers from cave-ins
Rationale: Shoring is a protective system designed to prevent or control
trench-wall collapse and protect workers inside the excavation.
4. Which condition generally presents the greatest trench-collapse hazard?
A. Stable, dry soil
B. Loose or saturated soil
C. Compact gravel
D. Solid rock
Correct answer: Loose or saturated soil
Rationale: Loose and water-saturated soils can lose strength and stability,
significantly increasing the possibility of trench-wall failure.
5. What is the purpose of trench dewatering?
A. Increase soil moisture
B. Remove groundwater or accumulated water from the excavation
C. Increase pipe pressure
D. Compact the pipe
Correct answer: Remove groundwater or accumulated water from the
excavation
Rationale: Controlling water helps maintain trench stability and provides
suitable conditions for bedding, pipe placement, and backfilling.
6. What should be used to establish the required elevation and grade of a
utility line?
A. Excavator bucket position alone
B. Construction plans and established survey controls
C. Truck tire tracks
D. Existing pavement markings only
Correct answer: Construction plans and established survey controls
Rationale: Utility lines must be installed according to the design elevations,
grades, and alignment established by the plans and field control.
,7. Why should pipe joints be kept clean during installation?
A. To increase pipe weight
B. To improve the appearance of the pipe
C. To ensure proper sealing and prevent joint failure
D. To eliminate the need for testing
Correct answer: To ensure proper sealing and prevent joint failure
Rationale: Dirt, rocks, or other contaminants can interfere with joint
assembly and sealing, potentially causing leaks or structural problems.
8. What is the primary purpose of a tracer wire installed with many
nonmetallic underground utility lines?
A. Carry normal operating current
B. Provide a means of locating the buried line
C. Increase water pressure
D. Support the pipe
Correct answer: Provide a means of locating the buried line
Rationale: Nonmetallic lines cannot normally be located with conventional
electromagnetic locating equipment unless an appropriate conductive
tracer system is provided.
9. What is the best reason for avoiding sharp rocks directly against a
flexible utility pipe?
A. They increase pipe flow
B. They can create concentrated loading and damage the pipe
C. They make backfill easier
D. They improve pipe alignment
Correct answer: They can create concentrated loading and damage the
pipe
Rationale: Sharp objects can puncture, gouge, or impose concentrated
loads on flexible pipe. Proper bedding and selected backfill reduce this
risk.
10. What is the purpose of compaction during utility trench backfilling?
, A. Remove all moisture from the soil
B. Reduce settlement and provide adequate support
C. Increase trench depth
D. Make the pipe flexible
Correct answer: Reduce settlement and provide adequate support
Rationale: Proper compaction increases soil density and reduces future
settlement that could damage the pavement, utility, or adjacent structures.
11. When installing pipe on a specified grade, excessive variation in
elevation can result in:
A. Improved hydraulic performance
B. Improper flow or air accumulation
C. Stronger joints
D. Reduced excavation requirements
Correct answer: Improper flow or air accumulation
Rationale: Maintaining the designed grade is especially important for
gravity systems because changes in elevation can affect flow and create
undesirable high or low points.
12. What is a manhole primarily used for?
A. Increasing pipe pressure
B. Providing access to underground utility systems
C. Compacting trench soil
D. Supporting excavators
Correct answer: Providing access to underground utility systems
Rationale: Manholes provide access for inspection, maintenance,
cleaning, connections, and changes in direction or elevation.
13. What should be done if field conditions differ substantially from the
construction plans?
A. Continue without notification
B. Modify the design independently