• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 25 pages
Exam (elaborations)

ACI EXAM|QUESTIONS AND VERIFIED ANSWERS|NEW UPDATE 2026/2027|GRADED A+

Document preview thumbnail
Preview 3 out of 25 pages

ACI EXAM|QUESTIONS AND VERIFIED ANSWERS|NEW UPDATE 2026/2027|GRADED A+

Content preview

ACI EXAM|QUESTIONS AND VERIFIED ANSWERS|NEW UPDATE
2026/2027|GRADED A+


The sensor of the temperature measureing device shall be submerged a minimum of ____ in

CORRECT|ANSWER

3 (75mm)




The temperature measureing device shall have a capacity of measuring temperature of freshly mixed
conrcrete to +-_____ degrees F throught a range of _____

CORRECT|ANSWER

1(.5 degrees C), 30-120 (0-50 degrees C)




The temperature measuring device shall be calibrated____, or whenever there is a question of _____

CORRECT|ANSWER

annually, accuracy




The temp of concrete may be measured in a wheelbarrow

CORRECT|ANSWER

true




the temp of concrete may be measured in a wall form

CORRECT|ANSWER

true

,A composite sample of concrete is required even if the only purpose for obtaining the sample is to
determine temp.

CORRECT|ANSWER

false




What must be done to the sample container prior to sampling the concrete

CORRECT|ANSWER

dampen (with water)




what must be done to the concrete surrounding the temp measuring device after the device has
submerged

CORRECT|ANSWER

Press concrete around measuring device




How long must the temp device remain in the concrete

CORRECT|ANSWER

at least 2 minutes (but no more than 5)




After temp of concrete is read, what then is required

CORRECT|ANSWER

reporting of temp




the temp of concrete to be measured to the nearest ____degree F

CORRECT|ANSWER

1 (.5 degree C)

, According to the ASTM C1064 what is one reason to take the temp of concrete

CORRECT|ANSWER

verify conformance to a specified requirement for temp




A max temp of concrete is specified in ASTM C1064

CORRECT|ANSWER

False




The sample of concrete used for temp determination must be rodded 25 times

CORRECT|ANSWER

False




Sampling by this method is required when tests are to be made to determine ____ with specification
requirements

CORRECT|ANSWER

compliance




The method covers sampling from four types of mixers which are _____, _____, ____, and _______

CORRECT|ANSWER

stationary mixes, paving mixers, revolving drum mixers and open top mixers




The maximum allowable time between obtaining the first and final portions of a composite sample is
______ minutes

Document information

Uploaded on
August 23, 2026
Number of pages
25
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$14.89

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
1
Items
544
Last sold
-




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions