• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 27 pages
Exam (elaborations)

ACI FIELD TESTING TECHNICIAN EXAM|QUESTIONS AND VERIFIED ANSWERS|NEW UPDATE 2026/2027|GRADED A+

Document preview thumbnail
Preview 3 out of 27 pages

ACI FIELD TESTING TECHNICIAN EXAM|QUESTIONS AND VERIFIED ANSWERS|NEW UPDATE 2026/2027|GRADED A+

Content preview

ACI FIELD TESTING TECHNICIAN EXAM|QUESTIONS AND VERIFIED
ANSWERS|NEW UPDATE 2026/2027|GRADED A+


The standard practice describes the _____ _____ and _____ required to obtain a representative sample
of fresh concrete and to assess its tractability to the structure it represents.

CORRECT|ANSWER

procedures, location and sample size




The procedures used in sampling shall include the use of every precaution that will assist in obtaining
samples that are truly representative of the _____and _______ of the concrete.

CORRECT|ANSWER

nature and conditions




Intermittent scooping of the sample in shovelfuls or bucketfuls into a wheelbarrow or tray as the
concrete continues to flow down the delivery chute is an acceptable technique?

CORRECT|ANSWER

False




The concrete sample must be protected at all times from sun, wind,____and

CORRECT|ANSWER

rapid evaporation, contaminants




the minimum size sample for making three 100mm diameter strength test cylinder specimens is

CORRECT|ANSWER

20l for 100x200mm

,The grab sample form a mixer must be obtained between the ____% and ____%points of the
discharge(except when sampling prior to the addition of a super plasticizer.)

CORRECT|ANSWER

10, 90




When the concrete contains aggregate whose nominal size is larger than that permitted for a particular
test method, the sample of concrete must be _____before making the test(except for Density tests)

CORRECT|ANSWER

Wet Sieved(over the appropriate sieve size)




When sampling for uniformity of mixed concrete____grab samples shall be obtained from widely
separated portions of the batch during discharge

CORRECT|ANSWER

Three




The temperature of the concrete must be determined within ___ minutes of obtaining the grab sample.

CORRECT|ANSWER

5 minutes




Air content (pressure method) measurement and slump must both be completed within ______ minutes
after the sample has been transported and remixed.

CORRECT|ANSWER

10 minutes

, Moulding of concrete strength cylinders or flexural beams must be completed within ____minutes after
the sample has been transported and remixed.

CORRECT|ANSWER

20 minutes




Air content (volumetric method) must be started within ____ minutes after the sample has been
transported and remixed.

CORRECT|ANSWER

5 minutes




What document produced by the concrete supplier contains information relating to identification of the
concrete sample?

CORRECT|ANSWER

The delivery ticket




Describe the operation of obtaining a sample for evaluation of concrete quality.

CORRECT|ANSWER

Obtain a single grab sample at one point of the discharge in as short a time as possible.




Between what two points of the mixer discharge must the concrete be sampled?

CORRECT|ANSWER

the 10% and 90% points




How is the sample obtained from the discharge stream of a mixer truck?

CORRECT|ANSWER

Document information

Uploaded on
August 23, 2026
Number of pages
27
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$14.69

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
1
Items
544
Last sold
-




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions