S12 S13 FDNY STANDPIPE 2026/2027
QUESTIONS AND ANSWERS
1. According to NFPA 25, which edition is currently referenced for the inspection, testing, and
maintenance of standpipe systems in NYC?
A. 2002 Edition
B. 2020 Edition
C. 2014 Edition
D. 2011 Edition
Answer: D
Conceptual Explanation: The FDNY currently references the 2011 edition of NFPA 25 for
ITM standards, with specific NYC modifications.
2. What is the required frequency for the visual inspection of a sealed Outside Screw and
Yoke (OS&Y) valve?
A. Daily
B. Quarterly
C. Monthly
,D. Weekly
Answer: D
Conceptual Explanation: Valves that are sealed must be inspected weekly to ensure they
are in the correct open position.
3. A ‘Critical Deficiency’ is defined as a condition that:
A. Does not affect system performance but violates code.
B. Will result in the immediate failure of the system upon activation.
C. Requires a red tag to be placed on the system.
D. Can have a material effect on the ability of the system to function in a fire.
Answer: D
Conceptual Explanation: A critical deficiency can affect system performance but is not as
severe as an impairment, which would render the system non-functional.
4. What color tag must be used when a system has a non-critical deficiency?
A. Yellow
B. Green
C. Red
D. Blue
Answer: A
, Conceptual Explanation: Yellow tags are used for non-critical deficiencies to indicate that
the system is functional but needs repair.
5. How often must a hydrostatic pressure test be performed on the Fire Department
Connection (FDC)?
A. Every 2 years
B. Every 5 years
C. Every 3 years
D. Every 10 years
Answer: B
Conceptual Explanation: Standpipe systems, including FDCs, must undergo a hydrostatic
test every 5 years.
6. Which color should the caps of a Fire Department Connection be for a standpipe system?
A. Green
B. Silver
C. Yellow
D. Red
Answer: D
Conceptual Explanation: In NYC, standpipe FDC caps are required to be painted red.
QUESTIONS AND ANSWERS
1. According to NFPA 25, which edition is currently referenced for the inspection, testing, and
maintenance of standpipe systems in NYC?
A. 2002 Edition
B. 2020 Edition
C. 2014 Edition
D. 2011 Edition
Answer: D
Conceptual Explanation: The FDNY currently references the 2011 edition of NFPA 25 for
ITM standards, with specific NYC modifications.
2. What is the required frequency for the visual inspection of a sealed Outside Screw and
Yoke (OS&Y) valve?
A. Daily
B. Quarterly
C. Monthly
,D. Weekly
Answer: D
Conceptual Explanation: Valves that are sealed must be inspected weekly to ensure they
are in the correct open position.
3. A ‘Critical Deficiency’ is defined as a condition that:
A. Does not affect system performance but violates code.
B. Will result in the immediate failure of the system upon activation.
C. Requires a red tag to be placed on the system.
D. Can have a material effect on the ability of the system to function in a fire.
Answer: D
Conceptual Explanation: A critical deficiency can affect system performance but is not as
severe as an impairment, which would render the system non-functional.
4. What color tag must be used when a system has a non-critical deficiency?
A. Yellow
B. Green
C. Red
D. Blue
Answer: A
, Conceptual Explanation: Yellow tags are used for non-critical deficiencies to indicate that
the system is functional but needs repair.
5. How often must a hydrostatic pressure test be performed on the Fire Department
Connection (FDC)?
A. Every 2 years
B. Every 5 years
C. Every 3 years
D. Every 10 years
Answer: B
Conceptual Explanation: Standpipe systems, including FDCs, must undergo a hydrostatic
test every 5 years.
6. Which color should the caps of a Fire Department Connection be for a standpipe system?
A. Green
B. Silver
C. Yellow
D. Red
Answer: D
Conceptual Explanation: In NYC, standpipe FDC caps are required to be painted red.