Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 2 pages
Exam (elaborations)

ISDS 3115 FINAL QUESTIONS WITH VERIFIED ANSWERS

Document preview thumbnail
Preview 1 out of 2 pages

ISDS 3115 FINAL QUESTIONS WITH VERIFIED ANSWERS

Content preview

ISDS 3115 FINAL QUESTIONS WITH VERIFIED
ANSWERS


An engineering change notice is used to change a(n) - Answers - BOM

A master production schedule contains information about - Answers - quantities and
required delivery dates of final products

When safety stock is deemed absolutely necessary, the usual policy is to build into
which category of the MRP logic? - Answers - Projected On Hand

One of the tools that is particularly useful in reducing the system nerbousness in the
MRP system is (are) - Answers - time fences

The extension of MRP which extenst to the resources such as labor hours and machin
hours, as well as order entry, purchasing and direct interface with customers and
suppliers is - Answers - enterprise resources planning

In MRP, the number of units projected to be available at the beginning of each time
period refers to - Answers - the amount projected to be on hand

In MRP record calculations, the appearance of a negative value for the gross
requirements of an end item in a specific time bucket - Answers - is impossible

The ________________ is the input to material requirements planning which lists the
assemblies, subassemeblies, parts, and raw materials needed to produce one unit of
finished product - Answers - bill of material

Which of the following best describes a gross material requirements plan? - Answers - a
schedule that shows total demand for an item, and when it must be ordered from a
supplier or when production must be started

Which of the following lot-sizing techniques results in the lowest holding costs? -
Answers - lot-for-food

Enterprise resource planning (ERP)... - Answers - automates and integrates the majority
of business processes

Low level coding means - Answers - a component item is coded at the lowest level at
which it appears in the BOM structure

Material requirements plans specify - Answers - the quantity and timing of planned order
releases

Document information

Uploaded on
August 22, 2026
Number of pages
2
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$9.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(362)
Sold
2140
Followers
1448
Items
58907
Last sold
22 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions