CWEA CSM GRADE 2 – PRACTICE TEST EXAM
WITH CORRECT ACTUAL QUESTIONS AND
CORRECTLY WELL DEFINED ANSWERS LATEST
ALREADY GRADED A+
Terms in this set (252)
In order to accurately estimate the Spill start time, spill end time and spill rate
flow of a sanitary sewer overflow
(SSO) you must have:
Providing a plan and schedule to A sewer system management plan (SSMP)
properly manage, operate and
maintain all parts of the sanitary
sewer system is the goal of a:
What are the basics elements of a Safety policy, statement, safety training, accident
safety program? investigation
, What factor must be considered Access for equipment and personnel
when obtaining an easement for
construction and maintenance of a
collection system?
As the division manager you Respond with the information available and
receive a request from your board update them with more
or council, and they want an
immediate response. You do not
know all the answers you should:
If you were a supervisor of two lead Discuss the problem with the substandard
workers, one whose work was foreman and offer to help before any other
exceptionally good and a second action is taken
whose work was substandard, what
should you do?
In selecting pipe material for Life expectancy of pipe
maximum service life which factor is
more important?
What affects the flow capacity of a Pipe size, pipe, material, grade
sewer line?
When a grade conflict exists Have the Water main adjusted and hold the
between a Water main and a sewer grade on the sewer main
main, which of the following is the
best solution?
Why is the replacement of Crowding of other underground utilities.
wastewater collection systems in
some downtown streets difficult?
Under what conditions must each At least once a year in simulated situation using
member of the rescue service non-representative space conditions
practice permit space rescues?
WITH CORRECT ACTUAL QUESTIONS AND
CORRECTLY WELL DEFINED ANSWERS LATEST
ALREADY GRADED A+
Terms in this set (252)
In order to accurately estimate the Spill start time, spill end time and spill rate
flow of a sanitary sewer overflow
(SSO) you must have:
Providing a plan and schedule to A sewer system management plan (SSMP)
properly manage, operate and
maintain all parts of the sanitary
sewer system is the goal of a:
What are the basics elements of a Safety policy, statement, safety training, accident
safety program? investigation
, What factor must be considered Access for equipment and personnel
when obtaining an easement for
construction and maintenance of a
collection system?
As the division manager you Respond with the information available and
receive a request from your board update them with more
or council, and they want an
immediate response. You do not
know all the answers you should:
If you were a supervisor of two lead Discuss the problem with the substandard
workers, one whose work was foreman and offer to help before any other
exceptionally good and a second action is taken
whose work was substandard, what
should you do?
In selecting pipe material for Life expectancy of pipe
maximum service life which factor is
more important?
What affects the flow capacity of a Pipe size, pipe, material, grade
sewer line?
When a grade conflict exists Have the Water main adjusted and hold the
between a Water main and a sewer grade on the sewer main
main, which of the following is the
best solution?
Why is the replacement of Crowding of other underground utilities.
wastewater collection systems in
some downtown streets difficult?
Under what conditions must each At least once a year in simulated situation using
member of the rescue service non-representative space conditions
practice permit space rescues?