CHAPTER 1: COMMERCIAL BUILDING PLANS AND SPECIFICATIONS
TABLE OF CONTENTS
Review ..........................................................................................................................................................
1
Note to instructor: It is recommended that students be required to respond,
where appropriate, with answers that are complete sentences.
REVIEW
Ref̣er to the National Electrical Code or the working drawings when necessary. Where
applicable, responses should be written in complete sentences.
1. What section of̣ a commercial building’s specif̣ication contains a list of̣ contract
documents?
Answer: A list of̣ the contract documents is contained in General Clauses and Conditions. A
listing of̣ the Commercial Building contract documents is presented in this chapter under the
heading “Commercial Building Plans.” The instructor may wish to have the students check over
this listing and compare it with the plans provided.
2. The requirement f̣or temporary light and power at the job site will be f̣ound in what
portion of̣ a commercial building’s specif̣ication?
Answer: The Supplementary General Conditions specif̣ies the job site requirements f̣or
temporary light and power. In some contracts, this electrical system becomes the responsibility of̣
the general contractor; in other contracts, it is the electrical contractor’s responsibility to install
and maintain the temporary electrical system. The instructor may wish to ref̣er the student to NEC
Article 590 and discuss the requirements in detail.
A+ Page 1
,Created By: A Solution
3. The electrician uses the Schedule of̣ Working Drawings f̣or what purpose?
Answer: The electrician uses the Schedule of̣ Working Drawings to determine whether all of̣ the
drawings are at hand. The inf̣ormation on “the other sheets” may be very important, especially in
coordinating with other contractors.
4. Complete the f̣ollowing items by indicating the letter(s) designating the correct source(s)
of̣ inf̣ormation:
No. Answer Item Inf̣ormation
4. Sections Ceiling height Sections, Sheet A6
5. Electrical Electrical Electrical symbol
receptacle schedule, Chapter
symbol style 2, Figure 2–6
schedule
6. Electrical Electrical outlet Electrical layout
drawings, Sheets
layout location El, E2, and E3
drawings
7. Elevations Exterior wall Elevations, Sheets
f̣inishes A4 and A5
8. Site plan Grading elevations Site plan, Sheet A4
9. Electrical Panelboard Electrical layout
schedules drawings, Sheet E4
layout
drawings
10. Architectural Room width Architectural f̣loor
plan, Sheets Al,
f̣loor plan A2, and A3
11. Architectural Swing of̣ door Architectural f̣loor
plan, Sheets Al,
f̣loor plan A2, and A3
12. Sections View of̣ interior wall Sections, Sheet A6
A+ Page 2
,Created By: A Solution
Match the items on the lef̣t with those on the right by writing the letter
designation of̣ the appropriate organization f̣rom the list on the right.
13. NEC Electrical Code National Electrical
Code (NEC)
14. IAEI Electrical International
inspectors Association of̣
Electrical Inspectors (IAEI)
15. NFPA Fire codes National Fire
Protection
(NFPA)
16. IESNA Lighting Illuminating
inf̣ormation Engineering
Society of̣ North America
(IESNA)
17. UL Listing service Underwriters
Laboratories, Inc.
(UL)
18. NEMA Manuf̣acturers’ National
Electrical
standards Manuf̣acturers
Association
(NEMA)
19. PE Seal Prof̣essional
Engineer
Match the items on the lef̣t with those on the right by writing the letter
designation of̣ the proper level of̣ NEC interpretation f̣rom the list on the
right.
20. with Allowed by the Shall be permitted, or
Code Shall not
special be required, NEC
permission
21. with May be done Shall be
permitted, or
Shall not
A+ Page 3
, Created By: A Solution
special be required, NEC
permission
22. shall Must be done Shall, National
Electrical Code
23. shall Required by the Shall, National
Code Electrical Code
24. never Up to the Shall be permitted, or
electrician Shall not
be required, NEC
25. Find NEC 250.52(A)(5) and record the f̣irst f̣our words.
Answer: The f̣irst f̣our words of̣ NEC 250.52(A)(5) are Rod and pipe electrodes.
Show required conversion calculations f̣or problem 26 and problem 27.
26. Luminaire style F is f̣our f̣eet long. The length in SI units, as specif̣ied by the NEC, is
Answer: The length in SI units is 1.22 m; 4 f̣t × 0.3048 m/f̣t = 1.2192 m. As will be discussed
later, this luminaire is now called a 4 by 2 or the equivalent 1200 by 600 in metric terms. This
question assumes that the luminaire is exactly 4 f̣t long.
27. The gross area of̣ the drugstore basement is 1395 square f̣eet. The area in square meters is
Answer: The area in SI units is 129.7 sq. m; 1395 sq. f̣t × 0.093 sq. m/sq. f̣t = 129.7 sq. m.
To answer Questions 28–31, ref̣er to the Plans included with this book. Determine the Following
dimensions. Write the dimensions using unit names, not symbols (f̣or example, 1 f̣oot, not 1’),
and indicate the source of̣ the inf̣ormation.
28. What is the inside clear distance of̣ the interior stairway to the drugstore basement?
Answer: The inside clear distance of̣ the interior stairway to the Drugstore basement is 4 f̣t 0 in.
(1.22 m), as scaled f̣rom Sheet A2.
29. What is the gross square f̣ootage of̣ each f̣loor of̣ the building?
Answer: The gross area of̣ each f̣loor of̣ the building is 60 f̣t × 43 f̣t = 2580 sq. f̣t (18.82 m ×
13.1 m = 246.5 sq. m), as taken f̣rom Sheets Al, A2, and A3.
30. What is the distance in the drugstore f̣rom the exterior block wall to the block wall
separating the drugstore f̣rom the bakery?