Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 66 pages
Exam (elaborations)

CALIFORNIA GENERAL CONTRACTOR B LATEST EXAM 2026/2027 WITH 260 QUESTIONS AND EXPERT-VERIFIED CORRECT ANSWERS | ALREADY GRADED A+ | GUARANTEED PASS | CALIFORNIA GENERAL CONTRACTOR PRACTICE EXAM

Document preview thumbnail
Preview 4 out of 66 pages

CALIFORNIA GENERAL CONTRACTOR B LATEST EXAM 2026/2027 WITH 260 QUESTIONS AND EXPERT-VERIFIED CORRECT ANSWERS | ALREADY GRADED A+ | GUARANTEED PASS | CALIFORNIA GENERAL CONTRACTOR PRACTICE EXAM You must comply with energy requirements when constructing a residential room addition: A. When the HVAC is inadequate B. When all rooms in the existing house are single-pane glass C. Unless you are using a non-depletable energy source D. When you are adding to the total square footage - ANSWER-D. When you are adding to the total square footage The minimum permitted clear width for an exit door in a building is: A. 18in B. 36in C. 32in D. 22in - ANSWER-C. 32in

Content preview

CALIFORNIA GENERAL CONTRACTOR B
LATEST EXAM 2026/2027 WITH 260
QUESTIONS AND EXPERT-VERIFIED
CORRECT ANSWERS | ALREADY GRADED
A+ | GUARANTEED PASS | CALIFORNIA
GENERAL CONTRACTOR PRACTICE EXAM




You must comply with energy requirements when constructing a residential room-
addition:
A. When the HVAC is inadequate
B. When all rooms in the existing house are single-pane glass
C. Unless you are using a non-depletable energy source
D. When you are adding to the total square footage - ANSWER-D. When you are
adding to the total square footage


The minimum permitted clear width for an exit door in a building is:
A. 18in
B. 36in
C. 32in

,D. 22in - ANSWER-C. 32in


How wide must a handicap, access door to a building be?
A. 24in
B. 32in
C. 28in
D. 36in - ANSWER-D. 36in (Door is 36" Clear width is 32")


What is the minimum width of vestibule, bylaw?
A. 52in
B. 60in
C. 44in
D. 36in - ANSWER-C. 44in (Vestibule-foyer or entrance room near front door)


What is the minimum height of a railing adjoining an elevated or sunken open-
area?
A. 42in
B. 38in
C. 36in
D. 48in - ANSWER-A. 42in


The minimum size of an attic access opening is:
A. 24"x24"
B. 22"x30"
C. 30"x30"
D. 24"x26" - ANSWER-B. 22"x30"

,What is not used to produce mulch?
A. Sewer sludge
B. Manure
C. Straw
D. Peat moss - ANSWER-A. Sewer sludge


Which of the following tool would be the MOST accurate for determining the
relative elevations of points in the landscape?
A. Level
B. Transit
C. String (line level)
D. Ruler - ANSWER-B. Transit


Where is a stepped-footing or stepped foundation used?
A. Excavation
B. Hilly terrace
C. Irrigation
D. Landscaping - ANSWER-B. Hilly terrace


You can prevent condensation on a cold-water line in hot weather by using:
A. Foil
B. Paint
C. Plastic pipe
D. Insulation - ANSWER-D. Insulation

, The best insulator is:
A. Blanket
B. Styrofoam
C. Batted
D. Aluminum - ANSWER-B. Styrofoam


What is the difference between blanket and batted insulation?
A. Length
B. Thickness
C. Backing
D. Foil on one side - ANSWER-A. Length (Batts-Long rolls; Blanket-Rectangular
pieces)


Where do you position the vapor barrier when placing insulation in sub-flooring?
A. Upward
B. With a double-foil face
C. Downward
D. Never install vapor barrier in sub-flooring - ANSWER-A. Upward


Which R-value of insulation would be used most often to conform with the State
Energy Commission requirements, when insulating an attic during new
construction?
A. R11
B. R19
C. R30
D. None of the above - ANSWER-C. R30

Document information

Uploaded on
August 20, 2026
Number of pages
66
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$27.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
55
Followers
6
Items
1366
Last sold
23 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions