Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

Asbestos Practice Exam 2 Questions With Correct Answers

Document preview thumbnail
Preview 3 out of 17 pages

Asbestos Practice Exam 2 Questions With Correct Answers

Content preview

Asbestos Practice Exam 2 Questions
With Correct Answers

ACM stands for - CORRECT ANSWER✔✔-Asbestos Containing Material
| | | | | | |




The operating agency for each public school building in which fraible
| | | | | | | | | | |



asbestos containing materials have been identified shall monitor
| | | | | | | |



airborne asbestos levels in each sampling area. For at least how many
| | | | | | | | | | | |



hours during a period of normal activity must this monitoring be done? -
| | | | | | | | | | | |



CORRECT ANSWER✔✔-it must be done for 8 hours
| | | | | | | |




What portion of insurance coverage for medical exams and monitoring
| | | | | | | | | |



as required by law must the contractor provide? - CORRECT
| | | | | | | | | |



ANSWER✔✔-all of the cost | | |




Responsibility for ACM control in a building is primarily that of the -
| | | | | | | | | | | | |



CORRECT ANSWER✔✔-owner |




The category least suspected of releasing asbestos fibers into the air
| | | | | | | | | | |



because of friability is - CORRECT ANSWER✔✔-miscellaneous products
| | | | | | |

,The program manager can speed up the sampling process when
| | | | | | | | | |



preparing for a building inspection for asbestos by revealing ACM in the
| | | | | | | | | | |



- CORRECT ANSWER✔✔-blueprints
| | |




Before plastic barriers are set up, the work area should be - CORRECT
| | | | | | | | | | | | |



ANSWER✔✔-wet cleaned |




What percentage of Federal, commercial, and residential construction
| | | | | | | |



before 1970 contained asbestos in pipe or boiler insulation? - CORRECT
| | | | | | | | | | |



ANSWER✔✔-20%


The efficiency of the negative air pressure unit or cabinet is determined
| | | | | | | | | | | |



by the - CORRECT ANSWER✔✔-Magnehelic guage and the manometer
| | | | | | | |




Disposal bags are primarily made of which type of plastic? - CORRECT
| | | | | | | | | | | |



ANSWER✔✔-A minimum of 6 mil | | | |




A contractor must sign the contract and execute the bonds _____ days
| | | | | | | | | | | |



after being awarded the bid - CORRECT ANSWER✔✔-5 days
| | | | | | | |




What should be posted "in plain view" of workers at teh jobsite to
| | | | | | | | | | | | |



ensure safety? - CORRECT ANSWER✔✔-Emergency telephone numbers
| | | | | |

, For a negative air pressure unit or cabinet, what volt-power supply is
| | | | | | | | | | | |



needed? - CORRECT ANSWER✔✔-115 volt
| | | |




Assembly Bill 2040 requires warning signs to state - CORRECT
| | | | | | | | | |



ANSWER✔✔-Danger- asbestos cancer and lung hazard- keep out! | | | | | | |




Mesothelioma is a cancer of - CORRECT ANSWER✔✔-the lining of the
| | | | | | | | | | |



lungs


These are all true - CORRECT ANSWER✔✔-During removal, asbestos
| | | | | | | | |



must be wetted to keep down airborne fibers and there must be no
| | | | | | | | | | | | |



visible emission to the outside air.
| | | | |




After removal, asbestos must be kept wet, placed in leak tight
| | | | | | | | | | |



containers with warning labels, and transported to a State approved
| | | | | | | | | |



waste disposal site.
| |




Proper work practices must be followed in renovation or demolition
| | | | | | | | | |



jobs involving at least 260 lf of asbestos on pipes and at least 160sf on
| | | | | | | | | | | | | | |



flat surfaces.
|




Asbestos may not be dropped on the ground, even if wetted
| | | | | | | | | |

Document information

Uploaded on
August 20, 2026
Number of pages
17
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Lectphilip
4.0
(42)
Sold
285
Followers
7
Items
26559
Last sold
3 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions