CISEC ACTUAL EXAM CLOSING SCRIPT
UPDATED QUESTIONS AND ANSWERS
VIEW AHEAD PREP MATERIAL SOLVED
⩥ NPDES.
Answer: National Pollutant Discharge Elimination System
- section of the CWA (Clean Water Act) to permit stormwater discharges
associated w industrial activities PER permit
⩥ CWA Penalty Types.
Answer: Adminstrative
Class I. Neglegent
Class II. Knowlingly = greater fines
⩥ What documents are required on site?.
Answer: - SWPPP
- CGP
- Site Map
- Drawings and Key
- All inspection reports
- Any amendments to SWPPP
,⩥ Who is the "operator"? Also the LRP..
Answer: Usually the OWNER of the site, not the contractor, unless
authorized by the owner to general contractor to have day-to-day
operational control!
⩥ When do you need permit coverage?.
Answer: Required from start to end of project. "End" being the final
vegetative/non-vegetative (concrete) stabilization occuring.
For any project one acre or greater.
⩥ Large Land Development.
Answer: -strips off all existing vegetation a.k.a site carving
-usually on hillsides and steep slopes
-installation of untilities that tear up large areas of land
⩥ Vertical Projects.
Answer: - Homebuilding, smaller residence construction projects
-usually multiple subcontractors
-requires lots of housekeeping = mass choas
⩥ Bix Box Projects.
, Answer: -commercial buildings
-mass grading and mass choas
-highly visible w/ fairly large footprint
⩥ Linear Projects.
Answer: -roadways, utilities, and stream corridors
-long narrow sites and mass choas
-limites site access and continually changing (high activity)
⩥ What is erosion?.
Answer: The process by which soil particle get displaced by the act of
wind of water.
⩥ What are the three types of Wind Erosion?.
Answer: 1. Creep - causes sand dunes
<10%
-large particle that roll across a terrain
2. Saltation - bouncing particles that DISLODGE more particles, then
fall back down
~50-80%
- stay relatively close to ground
UPDATED QUESTIONS AND ANSWERS
VIEW AHEAD PREP MATERIAL SOLVED
⩥ NPDES.
Answer: National Pollutant Discharge Elimination System
- section of the CWA (Clean Water Act) to permit stormwater discharges
associated w industrial activities PER permit
⩥ CWA Penalty Types.
Answer: Adminstrative
Class I. Neglegent
Class II. Knowlingly = greater fines
⩥ What documents are required on site?.
Answer: - SWPPP
- CGP
- Site Map
- Drawings and Key
- All inspection reports
- Any amendments to SWPPP
,⩥ Who is the "operator"? Also the LRP..
Answer: Usually the OWNER of the site, not the contractor, unless
authorized by the owner to general contractor to have day-to-day
operational control!
⩥ When do you need permit coverage?.
Answer: Required from start to end of project. "End" being the final
vegetative/non-vegetative (concrete) stabilization occuring.
For any project one acre or greater.
⩥ Large Land Development.
Answer: -strips off all existing vegetation a.k.a site carving
-usually on hillsides and steep slopes
-installation of untilities that tear up large areas of land
⩥ Vertical Projects.
Answer: - Homebuilding, smaller residence construction projects
-usually multiple subcontractors
-requires lots of housekeeping = mass choas
⩥ Bix Box Projects.
, Answer: -commercial buildings
-mass grading and mass choas
-highly visible w/ fairly large footprint
⩥ Linear Projects.
Answer: -roadways, utilities, and stream corridors
-long narrow sites and mass choas
-limites site access and continually changing (high activity)
⩥ What is erosion?.
Answer: The process by which soil particle get displaced by the act of
wind of water.
⩥ What are the three types of Wind Erosion?.
Answer: 1. Creep - causes sand dunes
<10%
-large particle that roll across a terrain
2. Saltation - bouncing particles that DISLODGE more particles, then
fall back down
~50-80%
- stay relatively close to ground