materials requirements planning - correct answers a means for determining the number of parts, components and materials needed to produce a product; provides time scheduling information specifying when each of the materials, parts and components hsould be ordered or produced, dependent demand drives this master production schedule - correct answers an anticipated build schedule for manufacturing end items time bucket - correct answers the smallest period of time for which a detailed master production schedule and material requirements plan is developed (typically one week) fundamental MRP equation - correct answers gross requirements - available balance - scheduled receipts = net requirements three key MRP inputs - correct answers master production schedule, bills of materials, inventory status file master production schedule - correct answers specifies planned production schedules for independent demand items (end items); difficult to change in the short term; more flexibility further into the future bill of materials - correct answers list of all items required for each end item, must be structured to reflect the production sequence inventory status file - correct answers on-hand inventory for each item, quantities on order for each item, lead times for each item, lot sizing rules for each item fixed order quantity - correct answers order same amount every time lot-for-lot - correct answers just order as much as you need for that period and don't look any further; makes sense if fixed order cost is low typical MRP output reports - correct answers planned orders, order release notices, changes in due dates, cancellations or suspensions, inventory status data MRP II - correct answers early 1980s; ties together materials planning, purchasing, production scheduling, accounts payable, etc enterprise resource planning (ERP) - correct answers software used to manage information in most functional areas of an organization; helps manage business processes using a common database and shared management reporting tools why companies undertake ERP installations - correct answers integrate financial information, integrate customer order information, standardize and speed up manufacturing processes, reduce inventory, standardize HR information modular design - correct answers allows companies to pick and choose the parts they want to use, or to implement the various parts incrementally over a period of time configuration - correct answers the process of tailoring ERP software by selecting functionality that best matches organizational processes; doesn't involve changes to underlying source code; sometimes called customizing development - correct answers modifying existing source code; creating new source code hidden costs of ERP installation - correct answers training costs are usually underestimated; costs of linking to other company software systems; customization costs; costs of data conversion reasons why ERP installations might fail - correct answers customization can make the software's performance less predictable; user resistance to the new system and new ways of doing things (change management) Change management - correct answers communicating a vision for change; the heart of change; dealing with resistance to change quality - correct answers fitness for use design quality - correct answers choices that are made regarding maintenance, ease of use; about making the right choices conformance quality - correct answers degree to which the actual product/service matches its intended design five key concepts to improve org quality - correct answers quality defined by the customer, prevention orientation, focus on continuous improvement, emphasis on supplier-customer line, quality at the source six sigma - correct answers statistical term, problem solving methodology, business strategy ways to improve a process - correct answers mean improvement and variation reduction common cause variation - correct answers variation expected when the process is operating normally special cause variation - correct answers variation due to some disturbance in normal operation in process key processes in six sigma - correct answers lead generation, customer acquisition,order fulfillment, customer maintenance, employee development process improvement - correct answers occurs if the mean time is reduces or if the variation is reduced problem-solving methodology - correct answers define, measure, analyze, improve, control control variables - correct answers set to a certain value, maintain within a specified range noise variables - correct answers uncontrollable measure stage - correct answers understand the current process improve stage - correct answers see if improvement has been made seven basic quality tools - correct answers opportunity flow diagram, checksheet, pareto diagram, histogram, cause-and-effect diagram, run chart, scatter diagram opportunity flow diagram - correct answers shows the detailed sequence of steps performed in a process; useful for identifying possible failure points and areas for improvement checksheet - correct answers gather data on the spot parety diagram - correct answers way to present data, 80-20 rule, separate the vital few problem sources from the trivial many histogram - correct answers graphical représentation of the variation in a data set; point is to look at shape of distribution cause-and-effect diagram - correct answers used to identify and organize the causes of problems, also referred to as a fishbone or ishikawa diagram runchart - correct answers plot levels of a single characteristic or dimension over time scatter diagram - correct answers plots the relationship between two variables costs of conformance - correct answers appraisal costs, prevention costs costs of non-conformance - correct answers internal failure costs, external failure costs continuous improvement/zero defects in view - correct answers focus on costs of non-conformance-in the long run, overall costs will always be decreased by improving quality acceptance sampling - correct answers acceptance, uses statistical sampling techniques to the decision whether to accept or to reject a production lot; random sampling types of error - correct answers accept a bad lot, reject a good lot statistical process control - correct answers control process parameters and the product will take care of itself; prevention rather than detection; more timely feedback; inspection is a non-value-adding activity, but it costs a firm time and money sources of special cause variation - correct answers equipment, material, environment, operator variables data - correct answers a precise measurement of some physical dimension is taken of a product, mean and R charts, mean and s charts attributes data - correct answers the number or proportion of units with some characteristic is tracked; p charts and c charts process capability - correct answers acceptable variation / actual variation key innovations leading to mass production - correct answers division of labor, use of interchangeable parts, scientific management, moving assembly line continuous improvement - correct answers worker responsibility; root cause; solve problems permanently; failsafing; team approach worker responsibility - correct answers quality at the source root cause - correct answers can only fix problem if you know root of problem solve problems permanently - correct answers don't just put a bandaid on the problem, fix it permanently failsafing - correct answers building safeguards into system; think of mistakes that might go wrong and find a way to avoid it respect for people - correct answers employees are treated as knowledge workers; employees are empowered-more challenging jobs, more decision-making; employee suggestion programs; cooperative management-employee relations; employee training encouraged and supported standard work practices - correct answers rigorous, agreed upon, document procedures; use the 5S system 5S system - correct answers sort, simplify, shine, standardize, sustain synchronization - correct answers key is to reduce variability in the process; what is needed, how much is needed, when is it needed, where it is needed 7 forms of waste in the process - correct answers overproduction, waiting time, material movement, inventory, over processing, worker movement, defective products specify value - correct answers identify the value of a product from the customers perspective identify the value stream - correct answers 1. steps that create value 2. steps that create no value but are unavoidable with current technologies and production assets 3. non value-adding steps that can be eliminated create flow - correct answers make work elements flow continuously with minimal waiting, rework, and stoppages establish pull - correct answers deliver only what is wanted by your customer and when they want it seek perfection - correct answers continuous improvement lean is... - correct answers a management philosophy that can be adopted throughout any enterprise networks of responsive suppliers - correct answers long-term relationships-help them develop superior capabilities; shorter, more precise lead times; more frequent deliveries of smaller quantities; quality at the source; coordination of production and shipment schedules; tightly integrated information system simplify the supplier/customer relationship - correct answers eliminate unnecessary activities and paperwork-more e-procurement; reduce in-transit inventory and lead times by locating nearby; use of consignment inventory resource perspective - correct answers a cell is a small group of resources- human and technical - dedicated to the processing of a set of similar products spatial perspective - correct answers a cell is a group of resources located in close proximity within clear physical boundaries transformation perspective - correct answers a cell is a system designed to perform multiple and consecutive process steps on a family of products benefits of successful lean production implementation - correct answers streamlined flow of materials from raw materials to the final customer; reduced investment in inventories; decreased cash-to-cash cycle; more predictable, better controlled processes; reduced levels of product defects; more reliable suppliers; improved responsiveness to changing markets and customer requirements average total value - correct answers retailer adds up value of inventory, can add up over a period of time runout time - correct answers how long does it take to run out of the average inventory; want to see this number small inventory turns - correct answers inverse of runout time, over the course of the year how any times do you go through your inventory fixed-order quantity models - correct answers event triggered; order the same amount every time; something happens that says it is time to order fixed-time period models - correct answers orders only placed at regular time intervals; quantity may vary economic order quantity model assumptions - correct answers demand for the product is constant and uniform throughout the period, lead time is constant, price per unit of product is constant; inventory holding cost is based on avg inventory, ordering or setup costs are constant (fixed), all demands for the product will be satisfied basic fixed order quantity formula - correct answers total annual cost=annual purchase cost + annual ordering cost + annual holding cost service profit chain - correct answers internal quality-employee satisfaction-retention and productivity-service value-customer satisfaction-profitability and growth service quality - correct answers reliability, responsiveness, assurance, empathy, tangibles expectations exceeded (quality surprise) - correct answers expected service perceived service expectations met (satisfactory quality) - correct answers expected service = perceived service expectations not met (unacceptable quality) - correct answers expected service perceived service gap one - correct answers difference between expected service and perceived service gap two - correct answers difference between management perceptions of consumer expectations and translation of perception into service quality specifications gap three - correct answers difference between translation of perceptions into service quality specifications and service delivery gap four - correct answers difference between service delivery and external communications to consumers gap five - correct answers difference between expected service and perceived service apostles - correct answers when a problem occurs and it is fixed well and customer is satisfied and tells friends

Content preview

OTM final exam questions and answers
well elaborated.

materials requirements planning - correct answers a means for determining the number of parts,
components and materials needed to produce a product; provides time scheduling information
specifying when each of the materials, parts and components hsould be ordered or produced,
dependent demand drives this



master production schedule - correct answers an anticipated build schedule for manufacturing end
items



time bucket - correct answers the smallest period of time for which a detailed master production
schedule and material requirements plan is developed (typically one week)



fundamental MRP equation - correct answers gross requirements - available balance - scheduled
receipts = net requirements



three key MRP inputs - correct answers master production schedule, bills of materials, inventory status
file



master production schedule - correct answers specifies planned production schedules for independent
demand items (end items); difficult to change in the short term; more flexibility further into the future



bill of materials - correct answers list of all items required for each end item, must be structured to
reflect the production sequence



inventory status file - correct answers on-hand inventory for each item, quantities on order for each
item, lead times for each item, lot sizing rules for each item



fixed order quantity - correct answers order same amount every time

, lot-for-lot - correct answers just order as much as you need for that period and don't look any further;
makes sense if fixed order cost is low



typical MRP output reports - correct answers planned orders, order release notices, changes in due
dates, cancellations or suspensions, inventory status data



MRP II - correct answers early 1980s; ties together materials planning, purchasing, production
scheduling, accounts payable, etc



enterprise resource planning (ERP) - correct answers software used to manage information in most
functional areas of an organization; helps manage business processes using a common database and
shared management reporting tools



why companies undertake ERP installations - correct answers integrate financial information, integrate
customer order information, standardize and speed up manufacturing processes, reduce inventory,
standardize HR information



modular design - correct answers allows companies to pick and choose the parts they want to use, or to
implement the various parts incrementally over a period of time



configuration - correct answers the process of tailoring ERP software by selecting functionality that best
matches organizational processes; doesn't involve changes to underlying source code; sometimes called
customizing



development - correct answers modifying existing source code; creating new source code



hidden costs of ERP installation - correct answers training costs are usually underestimated; costs of
linking to other company software systems; customization costs; costs of data conversion



reasons why ERP installations might fail - correct answers customization can make the software's
performance less predictable; user resistance to the new system and new ways of doing things (change
management)

Document information

Uploaded on
August 19, 2026
Number of pages
10
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
RealGrades
4.0
(26)
Sold
197
Followers
52
Items
12327
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions