Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 24 páginas
Examen

PMT 3600V EXAM 3 ADVANCED PROJECT MANAGEMENT QUESTIONS AND ANSWERS

Document preview thumbnail
Vista previa 3 fuera de 24 páginas

PMT 3600V EXAM 3 ADVANCED PROJECT MANAGEMENT QUESTIONS AND ANSWERS

Vista previa del contenido

PMT 3600V EXAM 3 ADVANCED
PROJECT MANAGEMENT QUESTIONS
AND ANSWERS



1. When calculating the Late Finish (LF) of an activity during a backward pass in the Critical

Path Method, which value is used?

A. The largest Late Start (LS) of all succeeding activities


B. The smallest Late Start (LS) of all succeeding activities


C. The largest Early Finish (EF) of all preceding activities


D. The smallest Early Finish (EF) of all preceding activities


Answer: B


Conceptual Explanation: In a backward pass, the Late Finish (LF) of an activity is equal to

the smallest (earliest) Late Start (LS) of its immediate successors to ensure the project

completion date is not delayed.


2. A project manager is considering a contract for a project with high uncertainty. Which

contract type places the most risk on the seller?

A. Cost Plus Fixed Fee (CPFF)


B. Cost Plus Incentive Fee (CPIF)

,C. Time and Materials (T&M)


D. Firm Fixed Price (FFP)


Answer: D


Conceptual Explanation: Firm Fixed Price (FFP) contracts place the maximum risk on the

seller because they are responsible for all cost overruns regardless of the actual costs

incurred.


3. If a project has an Optimistic time of 10 days, a Pessimistic time of 22 days, and a Most

Likely time of 13 days, what is the PERT (Beta distribution) duration?

A. 13 days


B. 14 days


C. 15 days


D. 16 days


Answer: B


Conceptual Explanation: PERT formula: (O + 4M + P) / 6. Calculation: (10 + 4*13 + 22) / 6

= (10 + 52 + 22) / 6 = = 14 days.


4. Which risk response strategy is being used when a project manager purchases insurance to

cover potential equipment failure?

A. Mitigate


B. Avoid

, C. Accept


D. Transfer


Answer: D


Conceptual Explanation: Transferring risk involves shifting the impact of a threat and

ownership of the response to a third party, such as an insurance company.


5. In the context of Resource Management, what is the primary difference between Resource

Leveling and Resource Smoothing?

A. There is no difference; they are synonymous.


B. Smoothing can change the critical path; Leveling does not.


C. Leveling only applies to human resources; Smoothing applies to materials.


D. Leveling can change the critical path; Smoothing does not.


Answer: D


Conceptual Explanation: Resource Leveling adjusts start and finish dates based on

resource constraints and can extend the critical path. Resource Smoothing adjusts activities

within their float and does not affect the critical path.


6. What is the standard deviation of an activity with a Pessimistic time of 30 and an

Optimistic time of 12?

A. 18


B. 6

Información del documento

Subido en
19 de agosto de 2026
Número de páginas
24
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$15.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Thebright
3.6
(44)
Vendido
234
Seguidores
6
Artículos
14496
Última venta
3 semanas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes