Boilermaker Test 2 Exam Questions &
Answers (Grade A+)
When are steel chain slings recommended?
A. When lifting above 600ft
B. When lifting over 15000 lbs
C. In high heat conditions
D. When rigging from 3 points -
correct answer ✅D. When rigging from 3 points
A big control valve is pulled. Who's responsible for the rigging?
A. Crane operator and rigger
B. Pipefitter and millwright
C. Process operator and boilermaker
D. Labor and pipefitter -
correct answer ✅A. Crane operator and rigger
What should be used to hold the pipe when setting up 40-footjoints
of 16-inch STD WT pipe?
A. 3-legged v-top jacks
B. 4-legged roller-top jacks
C. 3-legged roller-top jacks
, Boilermaker Test 2 Exam Questions &
Answers (Grade A+)
D. Pipe fitter chain wise -
correct answer ✅B. 4-legged roller-top jacks
The hitch made by wrapping the sling around the load, then passing
one eye of the sling through a shackle is called?
A. Basket hitch
B. Choker hitch
C. Bridle hitch
D. Grommet hitch -
correct answer ✅B. Choker hitch
When should rigging material be attached to a beam that is being
demolished?
A. Before the last 2 bolts are removed from each cup
B. Before any bolts are removed or any cutting is done on the beam
C. After the last two bolts have been removed but before any
cutting is done on the beam
D. After cutting is done on the beam -
correct answer ✅B. Before any bolts are removed or any cutting is
done on the beam
Answers (Grade A+)
When are steel chain slings recommended?
A. When lifting above 600ft
B. When lifting over 15000 lbs
C. In high heat conditions
D. When rigging from 3 points -
correct answer ✅D. When rigging from 3 points
A big control valve is pulled. Who's responsible for the rigging?
A. Crane operator and rigger
B. Pipefitter and millwright
C. Process operator and boilermaker
D. Labor and pipefitter -
correct answer ✅A. Crane operator and rigger
What should be used to hold the pipe when setting up 40-footjoints
of 16-inch STD WT pipe?
A. 3-legged v-top jacks
B. 4-legged roller-top jacks
C. 3-legged roller-top jacks
, Boilermaker Test 2 Exam Questions &
Answers (Grade A+)
D. Pipe fitter chain wise -
correct answer ✅B. 4-legged roller-top jacks
The hitch made by wrapping the sling around the load, then passing
one eye of the sling through a shackle is called?
A. Basket hitch
B. Choker hitch
C. Bridle hitch
D. Grommet hitch -
correct answer ✅B. Choker hitch
When should rigging material be attached to a beam that is being
demolished?
A. Before the last 2 bolts are removed from each cup
B. Before any bolts are removed or any cutting is done on the beam
C. After the last two bolts have been removed but before any
cutting is done on the beam
D. After cutting is done on the beam -
correct answer ✅B. Before any bolts are removed or any cutting is
done on the beam