1. A contractor discovers that the approved construction drawings conflict with
a written specification regarding the required fire-resistance rating of a wall
assembly. What should the contractor do FIRST?
A. Follow the drawings because they are normally easier to inspect
B. Follow the specification because specifications always supersede drawings
C. Obtain clarification from the design professional or AHJ before proceeding
D. Construct the more expensive assembly without notifying anyone
Answer: Obtain clarification from the design professional or AHJ before
proceeding
Rationale: Conflicting contract documents should be resolved through the
established clarification/RFI process rather than through unilateral contractor
,interpretation. Proceeding without clarification can create compliance, cost, and
liability problems.
2. During excavation for a commercial foundation, the contractor encounters
soil substantially different from the geotechnical report. What is the most
appropriate action?
A. Continue excavation based on the original assumptions
B. Immediately place concrete over the unsuitable material
C. Notify the appropriate parties and obtain evaluation of the changed conditions
D. Replace the soil without documenting the condition
Answer: Notify the appropriate parties and obtain evaluation of the changed
conditions
Rationale: Unexpected subsurface conditions can materially affect structural
performance and cost. The condition should be documented and evaluated
before permanent construction proceeds.
3. A concrete slab specification requires a particular compressive strength.
Which factor is most directly verified by properly conducted concrete strength
testing?
A. Surface color
B. Compressive capacity of the tested specimens
C. Slump alone
D. Aggregate moisture only
Answer: Compressive capacity of the tested specimens
Rationale: Concrete cylinders or other approved specimens are tested to
determine compressive strength. Slump is a workability measurement and does
not by itself establish ultimate compressive strength.
,4. A contractor wants to substitute a different roofing membrane for the
specified product. What is the best practice?
A. Install it if the installer has used it previously
B. Obtain written approval through the project's substitution process
C. Install it and request approval during final inspection
D. Use it automatically if it costs less
Answer: Obtain written approval through the project's substitution process
Rationale: A substitution can affect compatibility, warranties, performance,
code compliance, and cost. Written approval protects the project parties and
establishes that the substitution is acceptable.
5. What is the primary purpose of a construction schedule's critical path?
A. Identify the cheapest subcontractors
B. Determine activities that directly control the project's minimum completion
duration
C. Establish the contractor's tax liability
D. Identify only activities requiring inspections
Answer: Determine activities that directly control the project's minimum
completion duration
Rationale: Critical-path activities have little or no total float and can directly
affect the project's completion date if delayed.
6. A subcontractor repeatedly performs work that fails inspection. What should
the general contractor do?
, A. Ignore the problem until substantial completion
B. Document the deficiencies and require corrective action under the contract
C. Conceal the defective work
D. Immediately terminate the subcontract without documentation
Answer: Document the deficiencies and require corrective action under the
contract
Rationale: Defective work should be documented, communicated, corrected,
and tracked according to the contract. Proper documentation is particularly
important if escalation or termination becomes necessary.
7. Which document most commonly provides detailed requirements for
materials, workmanship, and installation standards?
A. Site photograph
B. Specifications
C. Daily weather report
D. Payroll register
Answer: Specifications
Rationale: Specifications establish detailed material and workmanship
requirements that complement the drawings.
8. A contractor receives a change directive that increases the scope of work.
What should be evaluated before proceeding whenever practical?
A. Only the labor rate
B. Cost, schedule, materials, contract requirements, and authorization
C. Only the owner's verbal preference
D. Only the subcontractor's markup
Answer: Cost, schedule, materials, contract requirements, and authorization