1. A Class A contractor is preparing a bid for a project where the local
jurisdiction has adopted the IBC with amendments that differ from the
contractor's usual jurisdiction. What should the contractor do first?
A. Use the contractor's standard code assumptions
B. Use the most recent edition of the IBC regardless of local adoption
C. Identify the locally adopted code edition and amendments applicable to the
project
D. Ask the subcontractors to determine which code applies
Answer: C. Identify the locally adopted code edition and amendments
applicable to the project
,Rationale: The controlling requirements are those adopted and enforced by the
authority having jurisdiction. A contractor must identify the applicable local
code edition and amendments before estimating or performing regulated work.
2. During bidding, a contractor discovers that the drawings conflict with the
written specifications regarding the required fire-resistance rating of a wall.
What is the most appropriate action?
A. Select the least expensive interpretation
B. Ignore the discrepancy until inspection
C. Follow whichever requirement is easiest to construct
D. Request clarification through the established RFI process before pricing or
constructing the affected work
Answer: D. Request clarification through the established RFI process before
pricing or constructing the affected work
Rationale: Conflicting contract documents should be formally clarified.
Proceeding on an unsupported assumption can create change-order disputes,
failed inspections, and liability.
3. A contractor estimates direct labor at $84,000, direct materials at $126,000,
and equipment at $30,000. If overhead is 12% of direct cost, what is the
overhead amount?
A. $24,000
B. $26,400
C. $28,800
D. $31,200
Answer: C. $28,800
Rationale: Direct cost is $84,000 + $126,000 + $30,000 = $240,000. Twelve
percent of $240,000 is $28,800.
4. A subcontractor submits a bid that appears substantially below the other
subcontractor bids. What is the contractor's best response?
,A. Automatically select the lowest bidder
B. Reject the bidder without review
C. Verify scope, exclusions, quantities, assumptions, and potential bid errors
before acceptance
D. Increase the subcontractor's price to match competitors
Answer: C. Verify scope, exclusions, quantities, assumptions, and potential bid
errors before acceptance
Rationale: An unusually low bid may result from an omission or
misunderstanding. Scope reconciliation protects the contractor from later
disputes and unexpected costs.
5. A project has a contract value of $750,000 and a contractor expects a gross
profit of 10% of the contract price. What gross profit is targeted?
A. $50,000
B. $65,000
C. $75,000
D. $82,500
Answer: C. $75,000
Rationale: $750,000 × 10% = $75,000. The distinction between markup and
margin is important when preparing contractor bids.
6. Which situation most clearly warrants a written change order rather than
simply proceeding under the original contract?
A. A superintendent changes the crew's lunch schedule
B. A worker replaces a damaged hand tool
C. The owner directs installation of additional structural work outside the
original scope
D. The contractor changes the sequence of noncritical interior work
Answer: C. The owner directs installation of additional structural work outside
the original scope
, Rationale: Additional work outside the agreed scope can affect cost, schedule,
and liability and should normally be documented through the contract's change-
order procedure.
7. A contractor receives a notice of an alleged defective installation. What
should the contractor do first?
A. Immediately admit liability
B. Remove the entire installation without documentation
C. Document the condition, review the contract and inspection records, and
investigate the allegation
D. Refuse to communicate with the owner
Answer: C. Document the condition, review the contract and inspection records,
and investigate the allegation
Rationale: A factual investigation should precede corrective action or admission
of responsibility. Documentation is critical for determining cause and
contractual responsibility.
8. Which document normally establishes the detailed requirements for
materials, workmanship, and installation beyond what is shown graphically on
drawings?
A. Daily report
B. Pay application
C. Project specifications
D. Equipment rental agreement
Answer: C. Project specifications
Rationale: Specifications provide written requirements governing materials,
quality, installation, testing, and other project requirements.
9. A contractor is calculating concrete volume for a slab measuring 80 ft by 50 ft
by 5 in. thick. Approximately how many cubic yards of concrete are required
before waste?