Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 27 pages
Exam (elaborations)

CONSTRUCTION QUALITY MANAGEMENT FOR CONTRACTORS CERTIFICATION EVALUATION TEST PAPER QUESTIONS AND SOLUTIONS VERIFIED COMPLETE

Document preview thumbnail
Preview 3 out of 27 pages

CONSTRUCTION QUALITY MANAGEMENT FOR CONTRACTORS CERTIFICATION EVALUATION TEST PAPER QUESTIONS AND SOLUTIONS VERIFIED COMPLETE

Content preview

CONSTRUCTION QUALITY MANAGEMENT
FOR CONTRACTORS CERTIFICATION
EVALUATION TEST PAPER QUESTIONS
AND SOLUTIONS VERIFIED COMPLETE

●● Design-Build contracts require
Answer: The QC Manager to be in place and take an active role in the
review and coordination of the design.


●● Which of the following is included in all three phases of the Three
Phases of Control?
Answer: Safety


●● The purpose of Construction Quality Management is to
Answer: Achieve the quality established by properly developed
requirements through the combined responsibility, but separate, efforts
of contractors and government personnel


●● Testing is extremely important in construction quality management
and is performed by
Answer: Both the contractor and the government


●● The primary purpose of the Three-Phase Control System is to

,Answer: Require the contractor to plan, schedule, and perform quality
management actions to assure work meets all specified quality standards


●● Quality Assurance Personnel have the responsibility to
Answer: Require the contractor to maintain the quality specified in the
plans and specifications


●● The _________________ is the appropriate time to assure that all
materials and/or equipment have been tested, submitted, and approved
Answer: Preparatory Phase


●● The Preconstruction Conference and Coordination and Mutual
Understanding Meeting Are
Answer: Conducted prior to the commencement of any physical
construction work


●● Contractor testing procedures:
Answer: Are specified in the technical specs, outlined in the QCP, and
addressed at Coordination and Mutual Understanding Meeting


●● The Quality Control Plan contains
Answer: Identification of individual quality quality control personnel,
including name, qualifications, assigned duties, responsibilities and
authorities.

, ●● Tests that are unannounced, randomly performed, and repeat quality
control tests are
Answer: Quality assurance tests


●● The contractor is required to conduct a Preparatory Phase Meeting
before they begin any definable feature of work except when
Answer: There are no exceptions to the rule


●● During the punch-out inspection of a project:
Answer: Quality Control personnel prepare and punch-list and make
corrections


●● The Quality Control Report should include
Answer: All of the above


●● In a design build contract, if the contractor has a question about the
design, what is the process to get an answer?
Answer: Contractor submits a design verification request to the
contractor's design team


●● Submittals are
Answer: Necessary to demonstrate that the proposed materials, etc. are
in compliance with the contract.

Document information

Uploaded on
August 17, 2026
Number of pages
27
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GradeGalaxy
4.4
(9)
Sold
145
Followers
4
Items
49591
Last sold
14 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions