Questions with Quality Answers 2026
Updated.
project management - Answer application of knowledge, skills, tools, and techniques to the
many activities necessary to complete a project successfully
project manager - Answer the leader of the contractor's project team who is responsible for
ensuring that all contract requirements are achieved safely and within the desired budget and
time frame
project team - Answer individuals from one or several organizations who work together as a
cohesive team to construct a project
project planning - Answer the process of selecting the construction methods and the
sequence of work to be used on a project
project management organization - Answer the contractor's project management group
headed by the officer-in-charge, including field supervision and staff
project start-up - Answer mobilizing the project management team, establishing the project
management office, and creating project document management systems
submittals - Answer shop drawings, product data sheets, and samples submitted by
contractors and subcontractors for verification by the design team that the materials purchased
for installation comply with the design intent
project control - Answer the methods a project manager uses to anticipate, monitor, and
adjust to risks and trends in controlling costs and schedules
project close-out - Answer completing the physical construction of the project, submitting all
required documentation to the owner, and financially closing out the project
quality control - Answer process to assure materials and installation meet or exceed the
requirements of the contract documents
total quality management - Answer a management philosophy that focuses on continuous
process improvement and customer satisfaction
, general contractor - Answer the party to a construction contract who agrees to construct the
project in accordance with the contract documents
traditional delivery method - Answer a delivery method in which the owner has a contract
with an architect to prepare a design for a project. When the design is completed, the owner
hires a contractor to construct the project
agency construction management delivery method - Answer a delivery method in which the
owner has three contracts: one with the architect, one with the general contractor, and one
with the construction manager. The construction manager acts as the owner's agent but has no
contractual authority over the architect or the general contractor
construction-manager-at-risk delivery method - Answer a delivery method in which the owner
has two contracts: one with the architect and one with the construction manager/general
contractor. The general contractor usually is hired early in the design process to perform
preconstruction services. Once the design is completed, the construction manager/general
contractor constructs the project
construction mananger/general contractor delivery method - Answer also known as the
construction-manager-at-risk delivery method
preconstruction services - Answer services that a construction contractor performs for a
project owner during design development and before construction starts
constructability analysis - Answer an evaluation of preferred and alternative materials and
construction methods
value engineering - Answer a study of the relative value of various materials and construction
techniques to identify the least costly alternative without sacrificing quality or performance
fast-track (phased) construction - Answer overlapping design and construction activities so
that some are performed in parallel rather than in series. Allows construction to begin while the
design is being completed
design-build delivery method - Answer a delivery method in which the owner hires a single
contractor who designs and constructs the project
joint venture - Answer a contractual collaboration of two or more parties to undertake a
project