Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4,6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

Final Exam for Construction Project Management Questions and Correct Answers.

Document preview thumbnail
Preview 2 out of 8 pages

What include in team structure - Answer Project Manager / Superintendent Project Engineer BIM Coordinator Scheduler Estimator Safety Manager what is responsibilities of PX - Answer Promising to the owner to deliver what is committed to proposal and in the presentation, and to provide the right resources for the project's success What is responsibilities for PM - Answer day to day contact for the owner. The PM oversees the project; including both design and construction what is responsibilities for Superintendent - Answer understand the owner's performance criteria and incorporate it into the program and design what is responsibilities for Estimator - Answer provide the owner with timely updates to the budget and keep the design manager in check, so the designer doesn't design elements that the budget cannot accomodate what is responsibilities for scheduler - Answer work with the superintendent to provide the baseline schedule and contractual update what are City and Agency Requirements - Answer Cal OSHA AQMD Allowable work hour (noise) Security Fence ( Green Screening) Roadways permanent paving, temporary base Subcontractor and Vendor job site access Emergency vehicle access Stormwater pollution prevention program SWPPP year-round Jurisdiction Approved traffic and haul route plan

Content preview

Final Exam for Construction Project
Management Questions and Correct
Answers.
What include in team structure - Answer Project Manager / Superintendent

Project Engineer

BIM Coordinator

Scheduler

Estimator

Safety Manager



what is responsibilities of PX - Answer Promising to the owner to deliver what is committed to
proposal and in the presentation, and to provide the right resources for the project's success



What is responsibilities for PM - Answer day to day contact for the owner. The PM oversees
the project; including both design and construction



what is responsibilities for Superintendent - Answer understand the owner's performance
criteria and incorporate it into the program and design



what is responsibilities for Estimator - Answer provide the owner with timely updates to the
budget and keep the design manager in check, so the designer doesn't design elements that the
budget cannot accomodate



what is responsibilities for scheduler - Answer work with the superintendent to provide the
baseline schedule and contractual update



what are City and Agency Requirements - Answer Cal OSHA

AQMD

Allowable work hour (noise)

Security Fence ( Green Screening)

Roadways permanent paving, temporary base

Subcontractor and Vendor job site access

Emergency vehicle access

Stormwater pollution prevention program SWPPP year-round

Jurisdiction Approved traffic and haul route plan

, City permits



Building Requirements - Answer Jobsite safety

Job office, trailer occupants, office size

temporary power

communication ( phone / data)

toilets (Men/women)

Temporary Utilities (power, water, etc)

Dumpster and recycling/segregating trash materials

LEED - requirements and best management practices (BMP's mechanical, electrical, indoor air
quality)

Lay down area ( material strorage)

Concrete washout

subcontractor offices

sequencing of construction workers

security - city and police and university requirement

cranes / man lift

job signage

monitoring visitors, public and workers looking for work

two gate system, union issues

quality plan

comminity/ neighbor, outreach



what are 5 adverse repercussion ( negative consequences) of poor risk management practices -
Answer Safety

reputation

employee retention/loss of morale

legal

financial (short term and/or long term)



Project Overview and Life Cycle - Answer Concept

RFQ and RFP Design

Award Design

Program

RFQ and RFP Build

Document information

Uploaded on
August 16, 2026
Number of pages
8
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
COCOSOLUTIONS
4.2
(37)
Sold
220
Followers
16
Items
9281
Last sold
3 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions