Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

Final Construction Management Jump Start Questions and Answers.

Document preview thumbnail
Preview 2 out of 13 pages

PM: - Answer Project manager PO: - Answer Purchase order PPP: - Answer Public-private partnership QA: - Answer Quality assurance QC: - Answer Quality control RFI: - Answer Request for information RFP: - Answer Request for proposal RFQ: - Answer Request for qualifications ROM: - Answer Rough order of magnitude SWPPP: - Answer Storm water pollution prevention plans WBS: - Answer Work breakdown structure BIM: - Answer Building information model CAD: - Answer Computer-aided design CD: - Answer Construction document CM: - Answer Construction manager CSI: - Answer Construction Specification Institute

Content preview

Final Construction Management Jump
Start Questions and Answers.
PM: - Answer Project manager



PO: - Answer Purchase order



PPP: - Answer Public-private partnership



QA: - Answer Quality assurance



QC: - Answer Quality control



RFI: - Answer Request for information



RFP: - Answer Request for proposal



RFQ: - Answer Request for qualifications



ROM: - Answer Rough order of magnitude



SWPPP: - Answer Storm water pollution prevention plans



WBS: - Answer Work breakdown structure



BIM: - Answer Building information model



CAD: - Answer Computer-aided design



CD: - Answer Construction document



CM: - Answer Construction manager



CSI: - Answer Construction Specification Institute

, DB - Answer Design-build



DD: - Answer Design development



FOR: - Answer Field observation report



GC: - Answer General contractor



GMP: - Answer Guaranteed maximum price



IPD: - Answer Integrated project delivery



LEED: - Answer Leadership in Energy and Environmental Design



What are the five primary sectors of the construction industry? - Answer residential,
commercial, heavy civil, industrial, and environmental construction.



What is the role of the owner on a construction project? - Answer develop the program for the
building, define the scope of the project, create the budget, and provide the funding for the
project.



What does LEED stand for, and what is its purpose? - Answer Leadership in Energy and
Environmental Design. A rating system that evaluates a building's environmental performance
over its life cycle.



What is lean construction, and from what industry does its concepts stem? - Answer Lean
construction is a philosophy that focuses on adding value with less work and the elimination of
waste in the building process. It stems from the manufacturing industry, particularly the Toyota
Production System.



Distinguish between construction management as a function and construction management as
a project delivery method. - Answer The construction management function is estimating,
scheduling, cost control, and contract administration in order to monitor, manage, and control
the work of the contract for which the contractor is obligated. Construction management as a
project delivery method is a contractual arrangement.



Identify at least three characteristics that make the construction project unique from other
industry sector projects. - Answer Each construction project is built as a one-of-a-kind
structure or facility. Every construction project is built on a different and unique building site.
The building process takes place outside. Much of the work is performed by the human hand.

Document information

Uploaded on
August 16, 2026
Number of pages
13
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$13.89

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
COCOSOLUTIONS
4.2
(37)
Sold
220
Followers
16
Items
9281
Last sold
3 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions