Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 34 pages
Exam (elaborations)

Maryland Excavation Contractor License Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationale 2026 Q&A| Instant Download Pdf

Document preview thumbnail
Preview 4 out of 34 pages

Maryland Excavation Contractor License Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationale 2026 Q&A| Instant Download Pdf

Content preview

Maryland Excavation Contractor License
Exam Practice Questions And Correct
Answers (Verified Answers) Plus
Rationale 2026 Q&A| Instant Download
Pdf



1. Which organization must an excavation contractor notify before
beginning most excavation activities in Maryland to identify and
protect underground utilities?

A. Maryland Department of Labor
B. Maryland Department of Planning
C. Maryland One-Call System (Miss Utility)
D. Maryland State Highway Administration

C. Maryland One-Call System (Miss Utility)

The Maryland Underground Facilities Damage Prevention requirements
mandate notification of the one-call system before excavation so
underground facilities can be located and marked, reducing the risk of
utility damage and injury.

2. Before excavation work begins in Maryland, a contractor should
primarily obtain utility markings to:

,A. Increase equipment productivity
B. Reduce fuel consumption
C. Prevent damage to underground facilities
D. Eliminate the need for permits

C. Prevent damage to underground facilities

Utility locating and marking are intended to prevent damage to
underground infrastructure, protect workers, avoid service interruptions,
and reduce liability exposure.

3. What is the greatest hazard associated with trenching operations?

A. Noise exposure
B. Cave-ins
C. Sun exposure
D. Equipment vibration

B. Cave-ins

Cave-ins are widely recognized as the most dangerous trenching hazard
because they can occur suddenly and often result in serious injury or
fatalities.

4. A competent person on an excavation project is primarily responsible
for:

A. Preparing payroll reports
B. Inspecting excavations and identifying hazards
C. Operating heavy equipment exclusively
D. Purchasing materials

B. Inspecting excavations and identifying hazards

A competent person must recognize hazardous conditions, conduct
inspections, and have authority to implement corrective actions to protect
workers.

, 5. When excavation markings become destroyed or unreadable, the
excavator should:

A. Repaint the markings independently
B. Ignore the markings and continue work
C. Request remarking through the proper notification process
D. Estimate the utility location

C. Request remarking through the proper notification process

Maryland requirements place responsibility on the excavator to request
remarking when markings are obliterated rather than replacing them
independently.

6. Within what distance of a marked underground facility must
mechanized excavation generally be avoided until the facility is
exposed?

A. 6 inches
B. 12 inches
C. 18 inches
D. 36 inches

C. 18 inches

Maryland excavation requirements establish an 18-inch tolerance zone
where hand digging or nondestructive methods are used to expose
underground facilities.

7. Which method is generally acceptable for exposing underground
facilities within the tolerance zone?

A. Explosives
B. Large bulldozers
C. Hand digging or nondestructive excavation
D. Pile driving

, C. Hand digging or nondestructive excavation

Hand excavation and approved nondestructive techniques reduce the risk
of damaging buried utilities when working near marked facilities.

8. Excavated soil should generally be kept at least how far from the edge
of a trench?

A. 6 inches
B. 1 foot
C. 2 feet
D. 5 feet

C. 2 feet

Keeping spoil piles at least two feet from the trench edge reduces
surcharge loads and helps prevent cave-ins.

9. Workers entering an excavation deeper than four feet should
generally have access to:

A. A crane basket only
B. A ladder, stairway, or other safe means of egress
C. A forklift platform
D. A rope only

B. A ladder, stairway, or other safe means of egress

Safe access and egress are required to allow workers to quickly enter and
exit excavations in emergency and routine situations.

10. How often should a competent person inspect excavations
under normal conditions?

A. Once per month
B. Once per project

Document information

Uploaded on
August 15, 2026
Number of pages
34
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$25.89

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheExamWhisperer
3.9
(166)
Sold
918
Followers
11
Items
28260
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions