• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 41 pages
Exam (elaborations)

SSM Site Safety Manager Exam 2026/2027 – 100+ Questions & Answers | NYC Building Code Chapter 33, Scaffolds, Demolition, Excavation & Site Safety – NYC DOB

Document preview thumbnail
Preview 4 out of 41 pages

This SSM Site Safety Manager Exam 2026/2027 study resource contains 100+ questions with answers across 41 pages, providing intensive preparation on NYC Building Code Chapter 33: Safeguards During Construction or Demolition. The document systematically reviews Sections BC 3301 through BC 3321, including general construction safeguards, site maintenance, soil and foundation work, concrete formwork, demolition, pedestrian protection, unenclosed perimeter protection, adjoining-property protection, major-building requirements, scaffolds, ramps and runways, hoisting equipment, cranes and derricks, and construction site safety training. It places particular emphasis on numerical requirements, inspection responsibilities, notification periods, dimensional limits, load capacities, training requirements, and duties commonly tested in Site Safety Manager and Site Safety Coordinator examinations. The opening material covers BC 3301 General Requirements, including competent-person equipment inspections, construction and demolition signage, Project Information Panels, sidewalk-shed parapet information panels, site safety orientations, annual refreshers, pre-shift meetings, and construction superintendent requirements. Students review when a primary construction superintendent is necessary, limitations on superintendent designations, circumstances permitting absence from a jobsite, documentation requirements, and the distinctions between qualified and competent persons. The resource repeatedly connects questions with specific Building Code provisions, such as BC 3301.9 for signage and BC 3301.11 for site safety orientation. A substantial section examines BC 3303 Safeguards and Maintenance of Site and BC 3304 Soil and Foundation Work. Topics include temporary lighting, watchpersons, material storage, debris chutes, temporary heating escape hatches, fire hydrants, floor and elevation markings, temporary and permanent standpipes, construction and demolition hoists, deep excavations, safety monitoring plans, concrete washout water, and worker shanties. Excavation questions address NYC DOB notifications, adjoining-property notices, DEP and transit-agency notifications, support of excavation, professional-engineer requirements, Type A, B and C soils, slope and bench configurations, excavation guardrails, and safe access to trenches. The formwork, demolition, and pedestrian-protection material covers BC 3305, BC 3306, and BC 3307. Students review circumstances requiring formwork design drawings, diagonal shoring braces, formwork inspections and observations, temporary loading areas, demolition safety zones, DOB and adjoining-property notifications, mechanical demolition equipment, pre-demolition hazard removal, and maximum permitted floor openings. Pedestrian-protection questions cover walkway dimensions and loads, ramps, handrails, sidewalk-shed triggers, heavy-duty versus light-duty sheds, curb clearances, lighting, periodic and daily inspections, construction fences, chain-link-fence exceptions, and viewing panels. The document also provides detailed coverage of fall protection and major-building site safety under BC 3308–3310. Topics include vertical debris and safety netting, horizontal safety netting, guardrail systems, top rails, midrails, toe boards, adjoining-property protection, excavation monitoring, roof protection, the definition of a major building, and circumstances permitting a Site Safety Coordinator instead of a Site Safety Manager. Students review the escalation process for unsafe conditions, situations requiring immediate notification to DOB, and the required contents of the site safety log. The material defines a major building as one meeting specified height, story, or floor-area criteria and directly addresses the responsibilities of the SSM/SSC on major construction and demolition projects. Another heavily tested area is BC 3314 Scaffolds. The study guide addresses permit exemptions for suspended and supported scaffolds, scaffold and suspension-rope load capacities, wind limitations, combustible-material restrictions, minimum clearances from insulated and uninsulated electrical lines, installer and user training, lumber spans, platform overhang and cantilever requirements, maximum deflection, outrigger beams, guardrails, debris netting, supported-scaffold height-to-base ratios, and vertical tie spacing. BC 3315 through BC 3321 are also introduced through structural ramps, runways and platforms, hoisting and material-handling equipment, material and personnel hoists, cranes and derricks, and construction site safety training. The final questions reinforce critical SSM terminology and fire-safety responsibilities. Students distinguish competent and qualified persons, identify critical-pick conditions, review soil classifications, portable oil- and gas-fueled heater requirements, Certificates of Fitness, No Smoking signage, Fire Safety Manager requirements, and required locations for portable fire extinguishers. These topics integrate construction safety with fire prevention and emergency preparedness, giving candidates a broader review of responsibilities encountered on active New York City construction sites. For authoritative exam preparation, the primary reference should be the applicable New York City Building Code, Chapter 33, Safeguards During Construction or Demolition, together with current rules and guidance published by the New York City Department of Buildings (NYC DOB). Fire-safety requirements should additionally be verified against the applicable New York City Fire Code and FDNY rules. Because construction codes and DOB rules are periodically amended, candidates should verify numerical thresholds, notification requirements, training rules, and SSM/SSC responsibilities against the code edition applicable to their examination rather than relying exclusively on third-party practice questions. Relevant Students: This resource is particularly relevant for NYC Site Safety Manager candidates, Site Safety Coordinator candidates, construction superintendents, competent persons, qualified persons, construction safety professionals, general contractors, scaffold supervisors, construction managers, and professionals preparing for NYC DOB construction-safety examinations. It is especially valuable for candidates reviewing NYC Building Code Chapter 33, major-building requirements, excavation, demolition, scaffolding, sidewalk sheds, safety netting, guardrails, pedestrian protection, construction hoists, cranes, fire safety, and SSM/SSC responsibilities. Keywords: SSM exam 2026, Site Safety Manager exam, NYC SSM exam questions and answers, Site Safety Manager questions and answers, NYC DOB SSM exam, SSM practice test, NYC Building Code Chapter 33, Chapter 33 exam questions, safeguards during construction demolition, BC 3301, BC 3303, BC 3304, BC 3305, BC 3306, BC 3307, BC 3308, BC 3309, BC 3310, BC 3314, BC 3321, construction superintendent NYC, site safety coordinator exam, NYC construction safety, competent person construction, qualified person construction, project information panel NYC, site safety orientation, excavation safety NYC, soil and foundation work, support of excavation, Type A B C soil, concrete formwork safety, demolition safety NYC, pedestrian protection NYC, sidewalk shed requirements, sidewalk shed inspection, vertical safety netting, horizontal safety netting, guardrail requirements NYC, major building NYC DOB, site safety log, scaffold requirements NYC, scaffold training NYC, supported scaffold, suspended scaffold, scaffold load capacity, crane safety NYC, critical pick crane, construction hoist requirements, Fire Safety Manager NYC, NYC DOB exam preparation

Content preview

SSM 2026/2027 Exam
Questions and Answers |
Already Graded A+



What is NYC Chapter 33?


What is Section 3301 and 3302? - ANSWER ✔✔Ch 33 = Safeguards

During Construction or Demoltion

3301 = General

3302 = Definitions

What do you do when code does not specifically state inspection is

needed on an equipment? - ANSWER ✔✔[3301.4.1]

,Any equipment (except hand tools) that affects safety of public or

property shall be inspected by a COMPETENT PERSON designated by

the contractor using the equipment




This inspection shall be documented in an inspection checklist signed

and dated by the CP

Who is responsible for maintaining construction/demo signs? -

ANSWER ✔✔[3301.9]


The permit holder for the construction/demo work

If no active permits, then the building owner

Name the (8) items that need to be listed on a Project Information Panel

- ANSWER ✔✔[3301.9.1]


1. Rendering, elevation drawing, or zoning diagram

2. "Work in Progress" Title and specifying zoning use

3. Anticipated project completion date

4. Property owner's corporate name, address, phone #

5. Website address or phone # to contact

6. GC name and phone #

,7. "To anonymously report unsafe conditions..call 311" in English and

Spanish

8. Primary project permit (laminated)

Where should the Project Information Panel be posted?


How high up? - ANSWER ✔✔[3301.9.1.2]


On the fence on each perimeter

-if the perimeter is greater than 150ft, post at each corner

- posted 4ft high from the ground to the bottom edge of the panel

Name the specs of the Project Information Panel and the (2) exceptions

- ANSWER ✔✔[3301.9.1.4]


6 ft wide x 4 ft high

Exceptions:

1) for demo project = 2'-4" wide x 4ft high

2) Sites that have street frontage less than 60 ft = 55" wide x 36.5" high

What contents should be on the SWS parapet info panel? (3) -

ANSWER ✔✔[3301.9.2.1]


1) Street address of the site

2) Name of contractor responsible for site...if not, then the owner

COPYRIGHT©PROFFKERRYMARTIN 2025/2026. YEAR PUBLISHED 2026. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE.
PRIVACY STATEMENT. ALL RIGHTS RESERVED

, 3) The statement "For more info, visit NYC.GOV/BUILDINGS"

Name the (4) requirements of posting SWS parapet info panel -

ANSWER ✔✔[3301.9.2.2]


1) Posted along the long axis of the SWS

2) Shall not be posted above/below parapet

3) Between 3-6 feet from the left edge SWS or property line

4) Centered above project info panel on Fence


What dimension shall the SWS parapet info panel be? - ANSWER

✔✔[3301.9.2.4]


3 ft high x 6 ft wide


When do you need site safety orientation and refresher? - ANSWER

✔✔[3301.11]


- Orientation needed for each worker at any site that requires

SSM/SSC/superintendent

- Refresher is needed after (1) year for each worker still working at the

same site

Who can conduct the site safety orientation and refresher? -

ANSWER ✔✔[3301.11.3]

Document information

Uploaded on
August 14, 2026
Number of pages
41
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$18.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PROFFKERRYMARTIN
3.4
(67)
Sold
321
Followers
9
Items
11555
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions