CPSI EXAM CERTIFICATION EVALUATION TESTED QUESTIONS FULL SOLUTION GUIDE
Question:
The site history file for a playground should contain.
Answer:
comprehensive inventory of all equipment, a parts list, maintenance and inspection recommendation
Question:
An opening may present a common crush or shear hazard only it.
Answer:
if it grabs the 5/8 (16mm) dowel
Question:
which of the following is true when using flexible components as access to a platform.
Answer:
a means of hand support during transition to the platform must be provided
Question:
A standard of care for playground equipment and surfacing is achieved after.
Answer:
all non compliance identified have been remediated
Question:
, which option is best when a piece of playground equipment must be taken out of service for an
extended period of time.
Answer:
use heavy duty construction fencing in conjunction with signage
Question:
which of the following would be BEST location for a new playground.
Answer:
Well drained area
Question:
The following data are recorded during a saftey audit of a public playground intended for users aged
2-5 with impact attenuating surfacing: A 96 inch (2440 mm) high free standing climber A tot swing
with a 120 inch high rail A flexible climber attached to a composite structure at deck height which
of the following actions should the CPSI recommend in order to bring the playground into
compliance with ASTM 1487 and the CPSC handbook.
Answer:
leave the climber alone,,lower the tot swing to 96 inches insure that the flexible climber is not the
sole means of access and remove the sliding pole
Question:
Before opening a new playground and allowing use by the public an owner/operator should.
Answer:
Audit the playground and rectify any non-compliant issues found
Question:
A cpsi discovers that an independent shade structure is 72 inches above the pivot point of a swing.
The CPSI should.
Answer:
Question:
The site history file for a playground should contain.
Answer:
comprehensive inventory of all equipment, a parts list, maintenance and inspection recommendation
Question:
An opening may present a common crush or shear hazard only it.
Answer:
if it grabs the 5/8 (16mm) dowel
Question:
which of the following is true when using flexible components as access to a platform.
Answer:
a means of hand support during transition to the platform must be provided
Question:
A standard of care for playground equipment and surfacing is achieved after.
Answer:
all non compliance identified have been remediated
Question:
, which option is best when a piece of playground equipment must be taken out of service for an
extended period of time.
Answer:
use heavy duty construction fencing in conjunction with signage
Question:
which of the following would be BEST location for a new playground.
Answer:
Well drained area
Question:
The following data are recorded during a saftey audit of a public playground intended for users aged
2-5 with impact attenuating surfacing: A 96 inch (2440 mm) high free standing climber A tot swing
with a 120 inch high rail A flexible climber attached to a composite structure at deck height which
of the following actions should the CPSI recommend in order to bring the playground into
compliance with ASTM 1487 and the CPSC handbook.
Answer:
leave the climber alone,,lower the tot swing to 96 inches insure that the flexible climber is not the
sole means of access and remove the sliding pole
Question:
Before opening a new playground and allowing use by the public an owner/operator should.
Answer:
Audit the playground and rectify any non-compliant issues found
Question:
A cpsi discovers that an independent shade structure is 72 inches above the pivot point of a swing.
The CPSI should.
Answer: