BMW MEMBERS ACTUAL EXAM SOLVED
QUESTIONS COMPLETE PREPARATION
RESOURCE
●● When testing for source voltage, the DVOM should be set to:
AC voltage
DC voltage
AC amp
DC amp
Answer: DC voltage
●● Two technicians are discussing the KL terminals:
Technician A states that KL30 indicates hot all times
Technician B states KL31indcates a permanent ground.
Who's correct?
Answer: Both
●● When installing a new battery in a BMW, with the same capacity, we
need to:
Register the new battery
Register and retrofit the new battery
Program the vehicle for the new battery
,None of the above.
Answer: Register the new battery
●● ALL the following statements are correct when installing a V-cable
to a module, EXCEPT:
The vehicle must be in KL0.
Vehicle has to be at sleep.
Vehicle needs to be in PAD mode
Battery should be disconnected.
Answer: Vehicle needs to be in PAD mode
●● All these checks should be performed when using a DVOM,
EXCEPT:
Check the meter's battery
Visual inspection of the leads
Meter leads should be tested for no less than 1Ω of resistance
Check the meter's internal fuses
Answer: Meter leads should be tested for no less than 1Ω of resistance
●● Two technicians are discussing an electrical diagnostic process,
Technician A states that for you to diagnoses an electrical problem an
ABL should be performed.
, Technician B states the technician, if needed can find the correct SSP
inside the ABL.
Who's correct?
Answer: Both
●● Two technicians are discussing the pin assignment chart:
Technician A states that the letter E stands for Electrical
Technician B states that the letter E stands for Input.
Who's correct?
Answer: Technician B
●● BMW recommends that an AGM battery's SOC never drops below?
12.5 V
12.0 V
13.1 V
11.0 V
Answer: 12.5 V
●● Two technicians are discussing removing a battery cable.
Technician A states that BMW recommends the technician waits for the
vehicle to go to sleep before disconnecting the cable.
Technician B states that once the key is removed from the vehicle it is
safe to remove the battery cable.
QUESTIONS COMPLETE PREPARATION
RESOURCE
●● When testing for source voltage, the DVOM should be set to:
AC voltage
DC voltage
AC amp
DC amp
Answer: DC voltage
●● Two technicians are discussing the KL terminals:
Technician A states that KL30 indicates hot all times
Technician B states KL31indcates a permanent ground.
Who's correct?
Answer: Both
●● When installing a new battery in a BMW, with the same capacity, we
need to:
Register the new battery
Register and retrofit the new battery
Program the vehicle for the new battery
,None of the above.
Answer: Register the new battery
●● ALL the following statements are correct when installing a V-cable
to a module, EXCEPT:
The vehicle must be in KL0.
Vehicle has to be at sleep.
Vehicle needs to be in PAD mode
Battery should be disconnected.
Answer: Vehicle needs to be in PAD mode
●● All these checks should be performed when using a DVOM,
EXCEPT:
Check the meter's battery
Visual inspection of the leads
Meter leads should be tested for no less than 1Ω of resistance
Check the meter's internal fuses
Answer: Meter leads should be tested for no less than 1Ω of resistance
●● Two technicians are discussing an electrical diagnostic process,
Technician A states that for you to diagnoses an electrical problem an
ABL should be performed.
, Technician B states the technician, if needed can find the correct SSP
inside the ABL.
Who's correct?
Answer: Both
●● Two technicians are discussing the pin assignment chart:
Technician A states that the letter E stands for Electrical
Technician B states that the letter E stands for Input.
Who's correct?
Answer: Technician B
●● BMW recommends that an AGM battery's SOC never drops below?
12.5 V
12.0 V
13.1 V
11.0 V
Answer: 12.5 V
●● Two technicians are discussing removing a battery cable.
Technician A states that BMW recommends the technician waits for the
vehicle to go to sleep before disconnecting the cable.
Technician B states that once the key is removed from the vehicle it is
safe to remove the battery cable.