• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 26 pages
Exam (elaborations)

PJM Generation Dispatcher Exam Questions with Verified Answers.

Document preview thumbnail
Preview 3 out of 26 pages

PJM Generation Dispatcher Exam Questions with Verified Answers.

Content preview

PJM Generation Dispatcher Exam Questions
with Verified Answers
Question 1
PJM issues a heavy load voltage warning how many hours prior to implementation
Correct Answer
4 hours



Question 2
What size generating units must provide instantaneous power and reactive flow data?
Correct Answer
10MW and above



Question 3
How often must blackstart resources be tested per NERC?
Correct Answer
At least once every 3 calendar years



Question 4
When synchronizing to the interconnection, what needs to be synchronized?
Correct Answer
Frequency, Voltage, and Phase Angle




Page 1 of 26

,Question 5
Severe cold weather conditions require which of the following be staffed, started, and
available for loading?
A. hydro units
B. combustion turbines and diesels
C. nuclear units
D. wind generators
Correct Answer



Question 6
A combustion turbine has 26 burn hours at maximum capacity. How should this be
offered into the Energy Market?
A. maximum emergency
B. minimum emergency
C. black start
D. normally
Correct Answer



Question 7
Which of the following PJM systems are used to report unit outages?
A. eDART, eMKT, and eGADS
B. eMTR, eSchedules, and eMKT
C. eDART, eCapacity, and eGADS
D. eDART, eMKT, and eCapacity
Correct Answer



Question 8
Regulation must be attainable within how many minutes
Correct Answer
5




Page 2 of 26

, Question 9
What side of the transformer is connected to the power source?
Correct Answer
Primary winding



Question 10
The satellite phone test is required of generator operating control centers with one or
more units totaling how many MW's?
Correct Answer
500MW



Question 11
Regulating units (demand response resources) provide a variable amount of
generation under automatic control to provide what?
Correct Answer
Correction for small deviations in load



Question 12
PJM issues a heavy load voltage schedule. Member companies who own generation
facilities should
A. remove 230 kV capacitors from service.
B. ensure voltage regulators on generating units are in service on automatic.
C. inform transmission providers to have marketers in their areas cut transactions.
D. instruct generating stations to curtail nonessential building loads.
Correct Answer
B. ensure voltage regulators on generating units are in service on automatic.



Question 13
What should generation owners/operators do during a High System Voltage Action
Correct Answer
Operate at the lower bandwidth of the voltage schedule




Page 3 of 26

Document information

Uploaded on
August 10, 2026
Number of pages
26
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorExpert
3.7
(79)
Sold
616
Followers
315
Items
11197
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions