1. What is the primary purpose of a construction contract?
A. To eliminate all project risks
B. To establish the rights, duties, and obligations of the parties
C. To guarantee the contractor a profit
D. To eliminate the need for plans
Answer: To establish the rights, duties, and obligations of the parties
Rationale: A construction contract establishes the responsibilities, scope of
work, payment terms, time requirements, and other obligations of the
contracting parties.
2. Which document generally describes the materials, workmanship, and
quality requirements for a construction project?
A. Site plan
B. Specifications
,C. Change order
D. Payment application
Answer: Specifications
Rationale: Specifications provide detailed written requirements for materials,
products, workmanship, installation, and quality.
3. What is the main purpose of a change order?
A. To cancel the contractor's license
B. To modify the contract scope, cost, or time
C. To replace the project plans
D. To establish the contractor's insurance limits
Answer: To modify the contract scope, cost, or time
Rationale: A properly authorized change order documents changes to the
original contract, including additions, deletions, price adjustments, or schedule
changes.
4. What does the term "retainage" generally refer to?
A. A contractor's markup
B. Money withheld from progress payments until specified conditions are met
C. The contractor's insurance premium
D. A material deposit
Answer: Money withheld from progress payments until specified conditions are
met
Rationale: Retainage is commonly withheld from progress payments as security
for satisfactory completion of the work and correction of deficiencies.
5. What is a construction project's critical path?
A. The shortest physical route through a building
B. The sequence of activities that determines the minimum project duration
,C. The contractor's preferred delivery route
D. The emergency evacuation route
Answer: The sequence of activities that determines the minimum project
duration
Rationale: Activities on the critical path have little or no scheduling float; delays
to critical activities can delay project completion.
6. Which type of insurance generally protects against claims for bodily injury
or property damage caused by the contractor's operations?
A. General liability insurance
B. Builder's risk insurance
C. Workers' compensation only
D. Professional liability only
Answer: General liability insurance
Rationale: Commercial general liability insurance generally addresses third-
party bodily injury and property damage claims arising from covered
operations.
7. What is the purpose of workers' compensation insurance?
A. To insure construction materials
B. To provide benefits for covered work-related employee injuries and illnesses
C. To protect the owner from design errors
D. To insure equipment against theft
Answer: To provide benefits for covered work-related employee injuries and
illnesses
Rationale: Workers' compensation provides statutory benefits for qualifying
workplace injuries and illnesses and generally limits an employer's exposure to
covered employee claims.
, 8. Which document is normally used to show the planned sequence and
timing of construction activities?
A. Schedule
B. Warranty
C. Submittal
D. Punch list
Answer: Schedule
Rationale: The construction schedule identifies activities, durations, sequencing,
milestones, and anticipated completion dates.
9. What is a submittal?
A. A request for payment from an employee
B. Contractor-provided information submitted for review, such as product data or
shop drawings
C. A building permit
D. A lien release only
Answer: Contractor-provided information submitted for review, such as product
data or shop drawings
Rationale: Submittals allow the design or project team to review proposed
materials, equipment, shop drawings, samples, and other information before
installation.
10.What is the primary purpose of a punch list?
A. To calculate payroll
B. To identify incomplete or defective work requiring correction
C. To determine material quantities
D. To establish the original contract price
Answer: To identify incomplete or defective work requiring correction