CISEC QUESTIONS AND ANSWERS SURE A+
✔✔Who decides the necessary BMPs in a SWPPP/for a project? - ✔✔The
DEVELOPER (not inspector)
✔✔ Types of Sediment Control BMPs - ✔✔- silt fences
- vehicle tracking pads
- SCS (sediment containment systems) / Filter Bags
- inlet barriers in front of "sump" D.I. or rocks around an Area Drain
- fiber rolls
- compost berms / compost socks
- bale / straw bale barriers
- rock check structure / riprap
- filter bags
✔✔Types of Erosion Control BMPs - ✔✔- placement of pavement
- installing landscaping materials
- establishing vegetation (native) / seeding
- contrustion of homes
- culverts/slope drains
- diversion channels
- ECB and TRMs
✔✔Types of Wind Erosion Control BMPs - ✔✔- Fences w/ slats or openings
- Vegetative strips / Establishing Vegetation
- Soil roughening
- Liquid applications (water or chemical soil binders)
✔✔What is the minimum number of required inspections? - ✔✔Once every 14 days.
✔✔Major things to look for on a S&EC plan? - ✔✔1. What is to be installed *before
grading, as per plan
2. Look at the NOTES sections
3. Identify the major dishcarge points
✔✔Who decides the necessary BMPs in a SWPPP/for a project? - ✔✔The
DEVELOPER (not inspector)
✔✔ Types of Sediment Control BMPs - ✔✔- silt fences
- vehicle tracking pads
- SCS (sediment containment systems) / Filter Bags
- inlet barriers in front of "sump" D.I. or rocks around an Area Drain
- fiber rolls
- compost berms / compost socks
- bale / straw bale barriers
- rock check structure / riprap
- filter bags
✔✔Types of Erosion Control BMPs - ✔✔- placement of pavement
- installing landscaping materials
- establishing vegetation (native) / seeding
- contrustion of homes
- culverts/slope drains
- diversion channels
- ECB and TRMs
✔✔Types of Wind Erosion Control BMPs - ✔✔- Fences w/ slats or openings
- Vegetative strips / Establishing Vegetation
- Soil roughening
- Liquid applications (water or chemical soil binders)
✔✔What is the minimum number of required inspections? - ✔✔Once every 14 days.
✔✔Major things to look for on a S&EC plan? - ✔✔1. What is to be installed *before
grading, as per plan
2. Look at the NOTES sections
3. Identify the major dishcarge points