Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 36 pages
Exam (elaborations)

RC NERC EXAM | ACTUAL QUESTIONS AND VERIFIED ANSWERS UPDATED EDITION|GRADED A+

Document preview thumbnail
Preview 4 out of 36 pages

RC NERC EXAM | ACTUAL QUESTIONS AND VERIFIED ANSWERS UPDATED EDITION|GRADED A+

Content preview

Question 1

What is the IEEE number for a Differential Relay?

A. 21

B. 25

C. 50

D. 87

CORRECT ANSWER

D. 87




Question 2

You BA area had two 100 MW interchange transactions at the start of last hour.
Transaction A started at 100 MW and was reduced to 50 MW on the half-hour. Transaction
B started at 100 and was reduced to 50 MW on the half-hour and then reduced to 0 MW at
quarter to the hour. What was the mwhr integration for last hour for your area (Ignore all
ramps)?

A. 62.5 mwhr

B. 125mwhr

C. 137.5 mwhr

D. 200 mwhr

CORRECT ANSWER

C. 137.5 mwhr

100*(30min/60)= 50mwhr + 50*(30/60)= 25 Total= 75mwhr

100*(30/60)= 50mwhr 50*(15/60)= 12.5 Total= 62.5+75= 137.5



1
@THE STUDY VAULT

,Question 3

You are a Transmission Operator and you have changed relay settings for your
Undervoltage Load Shedding Scheme in the Northern part of your system. Your neighbour
just to the North of you has a major generating facility rated at 1000MW and they supply
most of the MVAR for the area. They also monitor the MVAR flows on most of the Lines in
the area due to an NRC requirement regarding MVAR for a nuclear plant. Of the parties
listed below, who does not need to be notified of the changes made to the relay settings?

A. Transmission Operators

B. Transmission Service Providers

C. Balancing Authorities

D. Generation Operators
CORRECT ANSWER

B. Transmission Service Providers




Question 4

If you own or operate a UFLS program it must be updated at least how often?

A. Semi-annually

B. Every 5 years

C. Annually

D. Every 2 years

CORRECT ANSWER

C. Annually




Question 5




2
@THE STUDY VAULT

,You are replacing energy and capacity following the loss of a unit on your system that is
covered by an energy sharing agreement. You have how long before a tag must be
submitted?

A. 20 min

B. 60 min

C. 90 min

D. 15 min

CORRECT ANSWER

B. 60 min




Question 6

You are a Balancing Authority and get a call from your Purchase Selling Entity that a
transaction is to start at the top of the hour and is sinking on your system. There is no tag
in place for this transaction but they are adamant that it is suppose to start in 5 min. What
do you do?

A. Enter the said Transaction into your EMS/AGC system

B. Call the Reliability Coordinator

C. Notify them you have no tag therefore no schedule will be entered into the EMS

D. Notify your shift manager

CORRECT ANSWER

C. Notify them you have no tag therefore no schedule will be entered into the EMS




Question 7

You are a Transmission Operator implementing your company's restoration plan following
a system disturbance and subsequent blackout. You are in the restoration process and
have built your system to have 2,500 MW of synchronized generation and 1600 MW of
load restored. The frequency sudden declines to 58.5 Hz. How would you return the
frequency to 60Hz?


3
@THE STUDY VAULT

, A. Remove 250 MW of generation from service

B. Remove 240 MW of load

C. Increase 50 MW of generation

D. Remove 375 MW of load

CORRECT ANSWER

B. Remove 240 MW of load

Shed 6-10% of load= ~1Hz

1600*.1= 160MW for 1Hz therefore .5Hz would be 80MW

160+80= 240MW




Question 8

If you use a Dynamic Schedule that is less than or equal to 250MW, how much does the
average energy profile have to vary by in order to have to submit a new or modified tag?

A. 10%

B. 25MW

C. 25%

D. 10MW

CORRECT ANSWER

B. 25MW




Question 9

You are operating a system that has a previous year peak greater than 3,000MW, what is
the threshold for having to report a loss of firm load that last more than 15 min?

A. 50MW

B. 150MW

C. 300MW


4
@THE STUDY VAULT

Document information

Uploaded on
August 9, 2026
Number of pages
36
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
THESTUDYVAULT
3.2
(17)
Sold
132
Followers
6
Items
13249
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions