Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

PMT 3600V Exam 2: Complete Questions & Answers Study Guide (Questions 1-100 with Verified Solutions) GRADED A+!!

Document preview thumbnail
Preview 2 out of 15 pages

PMT 3600V Exam 2: Complete Questions & Answers Study Guide (Questions 1-100 with Verified Solutions) GRADED A+!! PMT 3600V Exam 2: Complete Questions & Answers Study Guide (Questions 1-100 with Verified Solutions) GRADED A+!!

Content preview

PMT 3600V Exam 2: Complete
Questions & Answers Study Guide
(Questions 1-100 with Verified
Solutions) GRADED A+!!
Section 1: Integrated Product and Process Development
(IPPD)
1. Based on Scenario Part I, one of the JUPSA Key Performance
Parameter (KPP) requirements does not appear to be achievable without
significant cost impacts. The PM is planning to recommend a change to
this validated requirement since it is not clear that the additional costs
are worth the capability added. Who would have to approve this
Acquisition Category (ACAT) I KPP change?

• Answer: Joint Requirements Oversight Council (JROC) .

2. The JUPSA program is an ACAT I, Major Defense Acquisition Program
(MDAP). To support the upcoming Milestone B decision, developmental
tests and early operational assessments were conducted. What is the
specific document that outlines the test planning for the EMD phase
efforts?

• Answer: Test and Evaluation Master Plan (TEMP) .

3. Which of the following is NOT part of the "People" tenet of Integrated
Product and Process Development (IPPD)?

• Answer: Event-Driven Scheduling .

4. Which components are part of the "Tools" tenet of IPPD? (Select all
that apply)

, • Answer: Maximize Flexibility for Optimization, Event-Driven
Scheduling, and Seamless Management Tools .

5. The _______________ IPPD category includes Concurrent Development of
Products and Processes.

• Answer: Processes .

6. Multidisciplinary teamwork is one of the three components of which
IPPD category?

• Answer: People .

7. Proactive Identification and Management of Risk is part of which IPPD
category?

• Answer: Processes .

8. You know that one way to aid in identifying manufacturing risks is
based on the “5 Ms” of manufacturing. The “5 Ms” are: manpower,
machinery, methods, measurement, and ______.

• Answer: Materials .


Section 2: Systems Thinking & Organizational Theory
9. System components are arranged in highly complex ways that involve
subsystems and supersystems. This is known as:

• Answer: Hierarchal Ordering .

10. The need for system components to rely on other components in
order to function is called:

• Answer: Interdependence .

11. The ability of system components to allow information and materials
to flow in and out is known as:

• Answer: Permeability .

Document information

Uploaded on
August 8, 2026
Number of pages
15
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$21.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
0
Items
318
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions