If workers are required to enter a trench over 1.2 m (4 ft)
deep, the safe point of entry and exit must be located:
a) within 5 m (16 ft) of the workers and the excavation
must be safely supported or sloped to the entry and exit
location.
b) within 7 m (23 ft) of the workers and the excavation
must be safely supported or sloped to the entry and exit
location.
❖c) within 8 m (25 ft) of the workers and the
excavation must be
,Page 2 of 178
❖safely supported or sloped to the entry and exit
location.
d) within 10 m (32 ft) of the workers and the excavation
must be safely supported or sloped to the entry and exit
location.
c
What is needed when a metal panel roof intersects a
wall?
a. Panel is turned up 75mm
b. Roof cap a minimum of 600mm
❖c. Horizontal flashing calked and secured 250mm on
bottom rib
d. Drip flashing calked and secured 250mm on bottom rib
c
,Page 3 of 178
What date is the second owner builder application based
on?
a. First application approval date
b. Date of sale of house
c. Last day work was done on the home
❖d. Occupancy date
d
When is the plumbing supply inspection called?
❖Before supply plumbing is concealed
b. At time of supply plumbing pressure test
c. Immediately after fixtures are installed
d. While work is being completed
a
, Page 4 of 178
What is not within the authority of a compliance officer
when conducting site visit?
a. Question any person about any matter that relates to
licensing
b. Question any person about the work performed by
construction workers
❖c. Question any person about the cost of materials
and labour
d. Question any person about the qualifications of
workers
c
Minimum strengths (in Mpa) for concrete footings, walls,
and foundations are?
❖15
b. 20
c. 25
d. 12
BC OWNER BUILDER EXAM PREP Q. BANK***
(BC BUILDING CODE, WORKSAFEBC SAFETY,
FOUNDATIONS & ROOFING) QUESTIONS AND
ANSWERS | VERIFIED AND WELL DETAILED
ANSWERS |DOWNLOAD AND PASS | LATEST
EXAM UPDATE 2026/2027
If workers are required to enter a trench over 1.2 m (4 ft)
deep, the safe point of entry and exit must be located:
a) within 5 m (16 ft) of the workers and the excavation
must be safely supported or sloped to the entry and exit
location.
b) within 7 m (23 ft) of the workers and the excavation
must be safely supported or sloped to the entry and exit
location.
❖c) within 8 m (25 ft) of the workers and the
excavation must be
,Page 2 of 178
❖safely supported or sloped to the entry and exit
location.
d) within 10 m (32 ft) of the workers and the excavation
must be safely supported or sloped to the entry and exit
location.
c
What is needed when a metal panel roof intersects a
wall?
a. Panel is turned up 75mm
b. Roof cap a minimum of 600mm
❖c. Horizontal flashing calked and secured 250mm on
bottom rib
d. Drip flashing calked and secured 250mm on bottom rib
c
,Page 3 of 178
What date is the second owner builder application based
on?
a. First application approval date
b. Date of sale of house
c. Last day work was done on the home
❖d. Occupancy date
d
When is the plumbing supply inspection called?
❖Before supply plumbing is concealed
b. At time of supply plumbing pressure test
c. Immediately after fixtures are installed
d. While work is being completed
a
, Page 4 of 178
What is not within the authority of a compliance officer
when conducting site visit?
a. Question any person about any matter that relates to
licensing
b. Question any person about the work performed by
construction workers
❖c. Question any person about the cost of materials
and labour
d. Question any person about the qualifications of
workers
c
Minimum strengths (in Mpa) for concrete footings, walls,
and foundations are?
❖15
b. 20
c. 25
d. 12